Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published Increasing Capacity Transformer Edd Firozabad. Submission Date for this Tender is 30-10-2020. Transformer Supply Tenders in Firozabad Uttar Pradesh. Bidders can get complete Tender details and download the document.
Name of Work: for the work of increasing capacity of 33/11 KV substation Narkhi from 1x5 MVA to 1x8 MVA (total capacity 18 MVA) alongwith other associated works on semi turnkey basis complete under the jurisdiction of Electricity Distribution Division, Firozabad | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Dismentalling of earthing strip, 11 KV XLPE cable and 33 KV connections etc. from alive 5 MVA transformer installed in the switchyard of 33/11 KV Substation Narkhi including the cost of arrangement of labourer, T&P, etc required for proper completion of work. | 1 | Job | |
2 | 2 | Dismentalling and removal of radiators, conservator tank and drained out transformer oil in drum from alive 5 MVA transformer installed in the switchyard of 33/11 KV substation Narkhi including the cost of arrangement of labourer, T&P, Spl. T&P carrier etc required for proper completion of work. | 1 | Job | |
3 | 3 | Removal and dragging of 5 MVA transformer from the plinth of switchyard of 33/11 KV substation Narkhi to a suitable site in switch yard for safety (dragging about 10 meters) including the cost of arrangement of labourer, T&P, etc required for proper completion of work. | 1 | Job | |
4 | 4 | Safe carriage of alive 5 MVA power transformer from site to store centre, Asfabad with loading, unloading at both ends. | 1 | Job | |
5 | 5 | Safe carriage of 8 MVA power transformer from store centre, Asfabad to site with loading, unloading at both ends. | 1 | Job | |
6 | 6 | Installation of 8 MVA transformer on the plinth in the switchyard of 33/11 KV Substation Narkhi in proper alignment and direction, as per instruction of supervising engineer, after dragging the same from out side the substation [Dragging about 30 meters], including the cost of arrangement of labourer, T&P, carrier etc required for proper completion of work. | 1 | Job | |
7 | 7 | Installation of conservator tank and radiator on above 8 MVA transformer and also topping up of transformer oil, including the cost of arrangement of labourer, T&P, carrier etc required for proper completion of work. | 1 | Job | |
8 | 8 | Connecting of body and neutral earthing to 8 MVA transformer with existing M.S. flat including the cost of arrangement of labourer, T&P etc required for proper completion of work. | 3 | Job | |
9 | 9 | Cartage of 33 KV VCB/VCB control panal provide from Store Centre, Asfabad, Firozabad or from any other stores of distance from 00.00 Km to 40 Kms., including the work of its cartage, loading, and unloading at the respective end. | 2 | Nos | |
10 | 10 | Installation of 33 KV VCB in switchyard of 33/11 Narkhi substation and grouting of rag bolts and fixing as per RESPO norms in proper alignment and direction at proper place. | 1 | Nos | |
11 | 11 | Installation of 33 KV VCB control panal in control room of 33/11 Narkhi substation and grouting of rag bolts and fixing as per RESPO norms in proper alignment and direction at proper place. | 1 | Nos | |
12 | 12 | Connecting of body earthing to 33 KV VCB and 33 KV VCB control panal with existing M.S. flat including the cost of arrangement of labourer, T&P etc required for proper completion of work. | 6 | Nos | |
13 | 13 | Steel structure of 33 VCB and 33 KV CT complete structure will be provide by contractor. | 1 | Nos | |
14 | 14 | Cartage of 33 KV CT 200/100/1-1A use of switchyard provide from Store Centre, Asfabad, Firozabad or from any other stores of distance from 00.00 Km to 40 Kms., including the work of its cartage, loading, and unloading at the respective end. | 3 | Nos | |
15 | 15 | Installation of 33 KV CT 200/100/1-1A of 33/11 substation switchyard and grouting of rag bolts and fixing as per RESPO norms in proper alignment and direction at proper place including the work of fixing/ connecting with the existing earthing with earth strip. | 3 | Nos | |
16 | 16 | Testing of 8 MVA Transformer and 33 KV VCB and control panel will be provide by contractor. | 2 | Nos | |
17 | 17 | Making 33 KV & 11 KV connections. | 6 | Nos | |
18 | 18 | 24 volt battery and battery charger with cabin will be provide by contractor. | 1 | Nos | |
19 | 19 | 4x2.5 sqmm control cable will be provide by contractor. | 100 | Mtr | |
20 | 20 | 2x2.5 sqmm control cable will be provide by contractor. | 100 | Mtr | |
21 | Total in Figures |