| 1 | ET05-2a | Supply, Installation, Wiring, Testing and Commissioning of new Energy Efficient 20 watts LED tubes with required length of PVC flexible wire as per the technical specifications and operation & maintenance of lights for a period of Three years. Releasing of the existing Fluorescent (Tube light) lamp fixtures safely, packing in suitable card board boxes and handing over to the concerned authorities. | Specification: As per the tender documents | Nos | 976 |
| 2 | ET05-3a | Supply, Installation, Wiring, Testing and Commissioning of new Energy Efficient 33 watts BLDC fan along with all the accessories such as capacitor, down rod, canopy, nut & bolts, connecting wires etc., as per the technical specifications and operation & maintenance of fans for a period of Three years. Releasing of the existing old ceiling fan safely, packing in suitable card board boxes and handing over to the concerned authorities. | Specification: As per the tender documents | Nos | 496 |
| 3 | ET05-1a | Supply, Installation, Wiring, Testing and Commissioning of new Energy Efficient 9 watts LED bulb as per the technical specifications and operation & maintenance of lights for a period of Three years. Releasing of the existing CFL /Incandescent lamp safely, packing in suitable card board boxes and handing over to the concerned authorities. | Specification: As per the tender documents | Nos | 864 |
| 4 | ET05-4a | Supply, Installation, Wiring, Testing and Commissioning of new Energy Efficient 80 watt LED Street light with complete fixtures, new brackets, clamps, bolt and nuts, tape, connector, wires and providing suitable capacity DP switch to control individual / group of lights wherever required as per the technical specifications and operation & maintenance of lights for a period of Three years. Releasing of the existing Sodium vapour/ Mercury vapour street light fixtures safely, packing in suitable card board boxes and handing over to the concerned authorities. | Specification: As per the tender documents | Nos | 384 |