Mtj-Awr- Heavy Repairs To Staff Quarters And Station Buildings, S&T, Trd Structures,Gate Lodges And Other Service Buildings.-Uttar Pradesh

North Central Railway-NCR has published Mtj-Awr- Heavy Repairs To Staff Quarters And Station Buildings, S&T, Trd Structures,Gate Lodges And Other Service Buildings.. Submission Date for this Tender is 12-11-2020. Building Repair Tenders in Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

25790594
Mtj-Awr- Heavy Repairs To Staff Quarters And Station Buildings, S&T, Trd Structures,Gate Lodges And Other Service Buildings.
Open Tender
Indian
Uttar Pradesh
12-11-2020

Tender Details

Mtj-Awr- Heavy Repairs To Staff Quarters And Station Buildings, S&T, Trd Structures,Gate Lodges And Other Service Buildings.

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
INR 1.08 Crore /-

BOQ Items

0 1 2 3 4 5 6 7 8
0 S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding\rUnit
1 Schedule A-Civil work for- 10822159.47 Above/\rBelow/Par
2 1 011011 120.00 cum 85.54 10264.80 20.55 12374.22
3 Description:- Earth work in excavation as per approved drawings and dumping at embankment site or spoil\rheap, within railway land, including 50m lead and 1.5m lift, the lead to be measured from the centre of gravity of\rexcavation to centre of gravity of spoil heap: the lift to be measured from natural ground level and paid for in\rlayers of 1.5m each, including incidental work, as per specifications-in All kinds of soils
4 2 012010 80.00 cum 9.00 720.00 20.55 867.96
5 Description:- Extra over item 011010 for excavation in foundations for buildings and bridges to cover dressing to\rneat dimension and plumbing sides etc. Note : Dressing under this item is payable for the total quantity of\rexcavation in foundation and not partly
6 3 031012 40.00 cum 1861.88 74475.20 20.55 89779.85
7 Description:- Providing and laying in position cement concrete of specified proportion excluding cost of cement,\rcentering and shuttering - All works upto Plinth level : 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 40mm\rnominal size)
8 4 111051 6500.00 Sqm 71.82 466830.00 20.55 562763.57
9 Description:- 15 mm cement plaster on the rough side of single or half brick wall of mix - 1:4 (1cement: 4coarse\rsand)
10 5 111151 230.00 Sqm 53.72 12355.60 20.55 14894.68
11 Description:- Cement plaster to ceiling of mix - 6 mm thick 1:3 (1cement: 3 fine sand)
12 6 091090 100.00 cum 2152.53 215253.00 20.55 259487.49
13 Description:- Laying cement concrete 1:2:4 (1cement: 2coarse sand: 4graded stone aggregate 20mm nominal\rsize) of thickness 40 to 100mm as under layer of flooring
14 7 092011 1250.00 Sqm 89.80 112250.00 20.55 135317.38
15 Description:- Cement concrete flooring 1:2:4 (1cement: 2coarse sand: 4graded stone aggregate) finished with a\rfloating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete\r25mm thick with 12.5mm nominal size stone aggregate
16 092012 510.00 Sqm 113.50 57885.00 20.55 69780.37
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail