| 1 | 1 | Pit excavation for 7.5 mts / 8 mts pole in ordinary soil including cleaning of site (each pit) - 1.25 x 0.6 x 1.5m [ordinary soil] | Item1 | 8 | Pit |
|---|
| 2 | 2 | Pole pit excavation for 9.0M and 9.14 M PSC/RCC / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr - Ordinary soil | Item2 | 5 | Pit |
|---|
| 3 | 3 | Excavation of Stay pit in ordinary soil [0.95 x 0.6 x 1.2m] | Item3 | 6 | Pit |
|---|
| 4 | 4 | Erection of 7.5m / 8.0m poles [RCC / PSC] (Including refilling of excavated earth) | Item4 | 8 | E |
|---|
| 5 | 5 | Erection of 9.00m / 9.14m RCC / PSC/Rail pole, Tubular pole and all Metal Poles (Including refilling of excavated earth) | Item5 | 5 | E |
|---|
| 6 | 6 | Erection stay set complete (Including refilling of excavated earth) | Item6 | 6 | Set |
|---|
| 7 | 7 | Loading of 7.5 Mtr / 8.0 Mtr RCC / PSC/ Metal Pole [ per pole ] | Item7 | 8 | E |
|---|
| 8 | 8 | Loading of [ 9.14 mtr ] 9.0 mtr poles RCC /PSC Pole / Metal Pole [ per pole ] | Item8 | 5 | E |
|---|
| 9 | 9 | Unloading of 7.5 Mtr / 8.0 Mtr RCC / PSC/ Metal Pole [ per pole ] | Item9 | 8 | E |
|---|
| 10 | 10 | Unloading of [ 9.14 mtr ] 9.0 mtr poles RCC /PSC Pole / Metal Pole [ per pole ] | Item10 | 5 | E |
|---|
| 11 | 11 | Transport 7.5 mtrs / 8.00 mtrs of poles including R.S.Joist and Rail Poles Upto 1.0 Km | Item11 | 8 | Per Pole |
|---|
| 12 | 12 | Transport of 9.0 mtr and above poles including R.S. Joist and Rail poles upto 1.0 Km | Item12 | 5 | Per Pole |
|---|
| 13 | 13 | Numbering of poles including cost of paint / loc [black background and yellow letters] | Item13 | 13 | E |
|---|
| 14 | 14 | Mass concreting for pole0.6x0.6x1.25M.with coping | Item14 | 13 | Loc |
|---|
| 15 | 15 | Fixing of 3[1/2]' V `X ' arm | Item15 | 12 | E |
|---|
| 16 | 16 | Fixing of LTTI, HT TI Fitting | Item16 | 12 | E |
|---|
| 17 | 17 | Fixing of tapping channel / guarding Cross arm | Item17 | 9 | E |
|---|
| 18 | 18 | Fixing of 11 KV Pin insulator with pin | Item18 | 24 | E |
|---|
| 19 | 19 | Fixing of 11 KV strain disc / polymer disc with hardware | Item19 | 30 | set |
|---|
| 20 | 20 | Erection of 11 KV Structure Material with Clamp (Top channel,bed channel, cross stud for bed channel erection | Item20 | 2 | E |
|---|
| 21 | 21 | Erection of AB Switch with PT insulator | Item21 | 2 | E |
|---|
| 22 | 22 | DP earthing including all works [double side earthing] | Item22 | 2 | E |
|---|
| 23 | 23 | Mass Concreting for centre support for 2 feet including all materials | Item23 | 2 | E |
|---|
| 24 | 24 | Paving Stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from Road side to work spot] per run - ACSR 7/4.09 mm | Item24 | 4.28 | Km |
|---|
| 25 | 25 | Earthing of poles | Item25 | 9 | E |
|---|
| 26 | 26 | Dismantling of conductor Upto 7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable upto 25 sqmm | Item26 | 3.141 | Km |
|---|
| 27 | 27 | Dismantling of conductor ACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm | Item27 | 0.618 | Km |
|---|
| 28 | 28 | Sub Total | Item28 | 1 | Each |
|---|
| 29 | 29 | EPF @ 13.00% | Item29 | 1 | Each |
|---|
| 30 | 30 | ESI @ 3.25% | Item30 | 1 | Each |
|---|
| 31 | 31 | SGST % | Item31 | 1 | Each |
|---|
| 32 | 32 | CGST % | Item32 | 1 | Each |
|---|
| 33 | 33 | IGST % | Item33 | 1 | Each |
|---|