}

2Nd Call For Consultancy Services For Authority’S Engineer For Supervision Of “Consultancy Services For Authority’S Engineer For Supervision Of: (I) Improvement/ Up-Gradation Of Existing 2-Lane Road To 4-Lane Divided Highway From Taphukuki To Daili Sectio, Manipur-Manipur

National Highways and Infrastructure Development Corporation Limited-NHIDCL has published 2Nd Call For Consultancy Services For Authority’S Engineer For Supervision Of “Consultancy Services For Authority’S Engineer For Supervision Of: (I) Improvement/ Up-Gradation Of Existing 2-Lane Road To 4-Lane Divided Highway From Taphukuki To Daili Sectio. Submission Date for this Tender is 30-10-2020. Highway Construction Tenders in Manipur Manipur. Bidders can get complete Tender details and download the document.




Tender Notice

25676982
2Nd Call For Consultancy Services For Authority’S Engineer For Supervision Of “Consultancy Services For Authority’S Engineer For Supervision Of: (I) Improvement/ Up-Gradation Of Existing 2-Lane Road To 4-Lane Divided Highway From Taphukuki To Daili Sectio
Open Tender
Indian
Manipur
Manipur
30-10-2020

Tender Details

2Nd Call For Consultancy Services For Authority’S Engineer For Supervision Of “Consultancy Services For Authority’S Engineer For Supervision Of: ( I ) Improvement / Up-Gradation Of Existing 2-Lane Road To 4-Lane Divided Highway From Taphukuki To Daili Section ( Pkg 4A ) Of Imphal-Kohima Road ( Nh-39 ) ( Design Chainage From Km 262+175 To Km 274+610 ) In The State Of Manipur On Epc Mode. ( Ii ) Improvement / Up-Gradation Of Existing 2-Lane Road To 4-Lane Divided Highway From Daili To Kuraopokpi Section ( Pkg-4B ) Of Imphal Kohima Road ( Nh-39 ) ( Design Chainage From Km 274+610 To Km 287+000 ) In The State Of Manipur On Epc Mode. ( Iii ) Improvement / Up-Gradation To 4-Lane Divided Highway From Kuraopokpi To Sekmai Section ( Pkg-5A ) Of Imphal Kohima Road ( Nh-39 ) ( Design Chainage From Km 287+000 To Km 297+700 ) In The State Of Manipur. ( Iv ) Improvement / Up-Gradation Of Existing 2-Lane Road To 4-Lane Divided Highway From Sekmai To Nilkhuthi Section ( Pkg-5B ) Of Imphal Kohima Road ( Design Chainage From Km 297+700 To Km 308+460 ) Of Nh-39 In The State Of Manipur On Epc Mode.

Key Value

Document Fees
INR 5900 /-
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: 2nd Call for Consultancy Services for Authority’s Engineer for Supervision of “CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Improvement/ Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from TaphuKuki to Daili section (Pkg 4A) of Imphal-Kohima road (NH-39) (Design Chainage from Km 262+175 to Km 274+610) in the state of Manipur on EPC Mode. (ii) Improvement/ Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Daili to Kuraopokpi section (Pkg-4B) of Imphal Kohima Road (NH-39) (Design Chainage from Km 274+610 to Km 287+000) in the state of Manipur on EPC Mode. (iii) Improvement/ Up-gradation to 4-Lane Divided Highway from Kuraopokpi to Sekmai section (Pkg-5A) of Imphal Kohima Road (NH-39) (Design Chainage from Km 287+000 to Km 297+700) in the state of Manipur. (iv) Improvement/ Up-gradation of existing 2-Lane road to 4-Lane Divided Highway from Sekmai to Nilkhuthi section (Pkg-5B) of Imphal Kohima Road (Design Chainage from Km 297+700 to Km 308+460) of NH-39 in the state of Manipur on EPC Mode.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Remuneration for Local Staff (inclusive of per Diem allowance) BI01010001010000000000000515BI0100001112
2 1.01 Team Leader Cum Senior Highway Engineer (1 No) 1*18=18 BI01010001010000000000000515BI0100001113 18 Man Months
3 1.02 Resident cum Highway Engineer (2 Nos) (2*18+1*60)=96 BI01010001010000000000000515BI0100001114 96 Man Months
4 1.03 Bridge/Structural Engineer (1 No)\n1*18=18 BI01010001010000000000000515BI0100001115 18 Man Months
5 1.04 Senior Pavement Specialist (2 Nos)\n2*18=36 BI01010001010000000000000515BI0100001116 36 Man Months
6 1.05 Senior Quality cum Material Expert (2 Nos)\n2*18=36 BI01010001010000000000000515BI0100001117 36 Man Months
7 1.06 Road Safety Expert (1 No)\n1*18=18 BI01010001010000000000000515BI0100001118 18 Man Months
8 1.07 Tunnel Design Engineer (1 No)\n1*6=6 BI01010001010000000000000515BI0100001119 6 Man Months
9 1.08 Senior Geotechnical Expert (1 No)\n1*6=6 BI01010001010000000000000515BI0100001120 6 Man Months
10 1.09 Sub-Professional Staff BI01010001010000000000000515BI0100001121
11 1.1 Survey Engineer (2 Nos)\n2*18=36 BI01010001010000000000000515BI0100001122 36 Man Months
12 1.11 Assistant Bridge Engineer (2 Nos)\n(2*18+ 1*30)=66 BI01010001010000000000000515BI0100001123 66 Man Months
13 1.12 Assistant Quality cum Material Engineer (2 Nos)\n(2*18+ 1*30)=66 BI01010001010000000000000515BI0100001124 66 Man Months
14 1.13 Lab Technician (2 Nos)\n2*18=36 BI01010001010000000000000515BI0100001125 36 Man Months
15 1.14 Quantity Surveyor (2 Nos)\n(2*18+ 1*30)=66 BI01010001010000000000000515BI0100001126 66 Man Months
16 2 Support Staff (inclusive of per diem allowance) BI01010001010000000000000515BI0100001127
17 2.1 Office Manager cum Accountant (2 Nos)\n(2*18+ 1*60)= 96 BI01010001010000000000000515BI0100001128 96 Man Months
18 2.2 Steno cum Computer Operator (2 Nos)\n(2*18+ 1*60)= 96 BI01010001010000000000000515BI0100001129 96 Man Months
19 2.3 Office Boy (2 Nos)\n(2*18+ 1*60)= 96 BI01010001010000000000000515BI0100001130 96 Man Months
20 3 Transportation (Fixed Costs) BI01010001010000000000000515BI0100001131
21 3.1 Innova/scorpio or equivalent (not more than 2 years old) (4 nos during Construction Period), \n4*18=72\nRate per month BI01010001010000000000000515BI0100001132 72 Months
22 3.2 Innova/scorpio or equivalent (not more than 2 years old) (1 no during Maintenance period/DLP), \n1*60=60\nRate per month BI01010001010000000000000515BI0100001133 60 Months
23 4 Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare (including Hotel Charges,travel costs etc. complete BI01010001010000000000000515BI0100001134
24 4.1 For 9 round trip to Employer's Head Office BI01010001010000000000000515BI0100001135 18 Nos
25 4.2 For 9 round trip to Employer's regional office. BI01010001010000000000000515BI0100001136 18 Nos
26 5 Office Rent (Fixed Costs) \nThe rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)\n BI01010001010000000000000515BI0100001137
27 5.1 During Construction period (2 Nos) \n2*18=36 BI01010001010000000000000515BI0100001138 36 Months
28 5.2 During Maintenance /DLP period (1 No)\n1*60=60 BI01010001010000000000000515BI0100001139 60 Months
29 6 Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month BI01010001010000000000000515BI0100001140
30 6.1 Office Supplies during construction period for 2 offices\n2*18=36 BI01010001010000000000000515BI0100001141 36 Months
31 6.2 Office Supplies during Maintenance /DLP period for 1 office\n1*60=60 BI01010001010000000000000515BI0100001142 60 Months
32 6.3 Drafting Supplies during construction period for 2 offices\n2*18=36 BI01010001010000000000000515BI0100001143 36 Months
33 6.4 Drafting Supplies during Maintenance /DLP period for 1 office\n1*60=60 BI01010001010000000000000515BI0100001144 60 Months
34 6.5 Computer Running Costs during construction period for 2 offices\n2*18=36 BI01010001010000000000000515BI0100001145 36 Months
35 6.6 Computer Running Costs during Maintenance /DLP period for 1 office\n1*60=60 BI01010001010000000000000515BI0100001146 60 Months
36 6.7 Domestic and International Communication during construction period for 2 offices\n2*18=36 BI01010001010000000000000515BI0100001147 36 Months
37 6.8 Domestic and International Communication during Maintenance /DLP period for 1 office\n1*60=60 BI01010001010000000000000515BI0100001148 60 Months
38 7 Office Furniture and Equipment (Rental)\nOffice furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc., BI01010001010000000000000515BI0100001149
39 7.1 During Construction period for 2 nos of offices\n2*18=36 BI01010001010000000000000515BI0100001150 36 Months
40 7.2 During Maintenance /DLP period for 1 no of office\n1*60=60 BI01010001010000000000000515BI0100001151 60 Months
41 8 Reports and Document Printing ( rate as per copy) BI01010001010000000000000515BI0100001152
42 8.1 Monthly reports\n(Design and Construction) BI01010001010000000000000515BI0100001153 234 Copy
43 8.2 Half yearly Reports BI01010001010000000000000515BI0100001154 39 Copy
44 8.3 Various others reports as provided in the Concession Agreement such as Completion Report BI01010001010000000000000515BI0100001155 1 LS
45 9 Road Survey Equipment, Rate per Km BI01010001010000000000000515BI0100001156
46 9.1 Surface defects detection and roughness measurement using Network Survey Vehicle BI01010001010000000000000515BI0100001157 509.135 Km
47 9.2 Pavement strength measurement using FWD BI01010001010000000000000515BI0100001158 231.425 Km
48 9.3 Bridge inspection using Mobile Bridge Inspection Unit BI01010001010000000000000515BI0100001159 0.677 Km
49 9.4 Road signs inspection using Retro Reflectometer BI01010001010000000000000515BI0100001160 509.135 Km
50 10 Contigencies\nA fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. \n(Fixed as Rs. 10,00,000) BI01010001010000000000000515BI0100001161 1 LS
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail