| 1 | 1 | Daily Sweeping, cleaning and moping of floors, steps, dado etc with broom sticks & wet clothes with phenyl water etc., & Daily cleaning the dust from walls, roofs, corridors etc. & Daily cleaning toilet and wash basin with vim powder, phenyl, naphthalene balls as required \nAt Stage-I Power House complex\n\nNote: All the tools & tackles and required consumables is included in the item\n | BI01010001010000000000000515BI0100001113 | 365 | Day |
|---|
| 2 | 2 | Weekly Cleaning & mopping of each doors, windows, glass panes / glazings for fixed as well as open-able windows), MS grills etc. at Stage-I Power House complex, by soap / detergent water and rubbing with cloths etc. in all type of turbine floor and movement area surrounding of all the four units and & Weekly scraping & removing greasy soot from each wall, ceiling, floors etc.at turbine floor with dry coir ropes, jute bags and detergent as required.\n\nNote: All the tools & tackles and required consumables is included in the item\n | BI01010001010000000000000515BI0100001114 | 52 | Week |
|---|
| 3 | 3 | Weekly cleaning of each plinth area drains including each plinth surface area around departmental quarters at face-6 colony including spraying bleaching powder on the top surface of drains inside and outside as necessary. \nNote: All the tools & tackles and required consumables (other than bleaching powder) are included in the item. Cost of bleaching powder to be paid through item no- 05 \n | BI01010001010000000000000515BI0100001115 | 52 | Week |
|---|
| 4 | 4 | Weekly cleaning of each plinth area drains including each plinth surface area around Stage-I Power House, Annex Building, Diesel Generator room, Auxiliary Transformer room and Pump House including spraying bleaching powder on the top surface of drains inside and outside as necessary. \nNote: All the tools & tackles and required consumables (other than bleaching powder) are included in the item. Cost of bleaching powder to be paid through item no- 05 \n | BI01010001010000000000000515BI0100001116 | 52 | Week |
|---|
| 5 | 5 | Supply of bleaching power of approved quality at site. | BI01010001010000000000000515BI0100001117 | 150 | Kg |
|---|
| 6 | 6 | Trimming of grass and weeds from the\nshoulders/berms and disposing off the same to\nsuitable locations as per technical\nspecifications Clause 1914 for Rural Roads of\nMORD. | BI01010001010000000000000515BI0100001118 | 160000 | sqm |
|---|
| 7 | 7 | Removing sludge from septic tank, soak well etc. by methor labour including disposal of the same outside the compound as directed.\n(a) Upto 20 users:-\n(i) Within a lead of 150 metre | BI01010001010000000000000515BI0100001119 | 2 | Each |
|---|
| 8 | 8 | Cleaning silt of inspection pit. | BI01010001010000000000000515BI0100001120 | 2 | Each |
|---|
| 9 | 9 | Making one set of scafolding only for replacing glass panels, painting, uprooting plant and another repairing works only with 10 cm dia bamboo as main posts at the rate of 1 metre centre to centre and 7.5 cm dia bamboo ties @ 0.75 metre apart fitting and fixing with necessary coir, nails etc . as per direction of the Engineer in Charge.\n(This item should be executed only after prior approval of the Engineer-incharge). Firstly, one number to be paid and then labour rate for shifting up to further nineteenth (19) times @ 10% each time to be considered. If necessary further after twenty times of total use, another one number new and labour rate for shifting to be considered accordingly.\na) 3.90 metre height \n | BI01010001010000000000000515BI0100001121 | 4 | Each |
|---|
| 10 | 10 | b) Extra for additional 3.6 height or part therof. | BI01010001010000000000000515BI0100001122 | 4 | Each |
|---|
| 11 | 11 | Supply of unskilled labour for various works related to sweeping and cleaning as directed by the Engineer,cost complete in all respect. | BI01010001010000000000000515BI0100001123 | 10 | Each |
|---|