| 1 | 1 | Daily Sweeping, cleaning and moping of floors, steps, dado etc with broom sticks & wet clothes with phenyl water etc., & Daily cleaning the dust from walls, roofs, corridors etc. & Daily cleaning toilet and wash basin with vim powder, phenyl, naphthalene balls as required \n\nAt PM office, civil office & conference hall\n\nNote: All the tools & tackles and required consumables is included in the item\n \n | BI01010001010000000000000515BI0100001113 | 365 | days |
|---|
| 2 | 2 | Weekly Cleaning & mopping of each doors, windows, glass panes / glazings for fixed as well as open-able windows), MS grills etc. At PM office, civil office & conference hallby soap / detergent water and rubbing with cloths etc. in all type of turbine floor and movement area surrounding of all the four units & Weekly scraping & removing greasy soot from each wall, ceiling, floors etc.at turbine floor with dry coir ropes, jute bags and detergent as required.\n\nNote: All the tools & tackles and required consumables is included in the item\n \n | BI01010001010000000000000515BI0100001114 | 52 | week |
|---|
| 3 | 3 | Weekly cleaning of each plinth area drains including each plinth surface area around departmental buildings & quarters at Paren, New Paren and Lower Paren colony including spraying bleaching powder on the top surface of drains inside and outside as necessary. \n\nNote: All the tools & tackles and required consumables (other than bleaching powder) are included in the item. Cost of bleaching powder to be paid through item no- 05 \n | BI01010001010000000000000515BI0100001115 | 52 | week |
|---|
| 4 | 4 | Weekly cleaning of each plinth area drains including each plinth surface area around Project Manager Office, Civil Office and Conference room including spraying bleaching powder on the top surface of drains inside and outside as necessary. \n\nNote: All the tools & tackles and required consumables (other than bleaching powder) are included in the item. Cost of bleaching powder to be paid through item no- 05 \n | BI01010001010000000000000515BI0100001116 | 52 | Week |
|---|
| 5 | 5 | Supply of bleaching power of approved quality at site. | BI01010001010000000000000515BI0100001117 | 150 | Kg |
|---|
| 6 | 6 | Trimming of grass and weeds from the\nshoulders/berms and disposing off the same to\nsuitable locations as per technical\nspecifications Clause 1914 for Rural Roads of\nMORD. | BI01010001010000000000000515BI0100001118 | 125000 | Sqm |
|---|
| 7 | 7 | Removing sludge from septic tank, soak well etc. by Mather labour including disposal of the same outside the compound as directed.(a) Up-to 20 users(i) Within a lead of 150 metre. | BI01010001010000000000000515BI0100001119 | 8 | Each |
|---|
| 8 | 8 | Cleaning silt of inspection pit. | BI01010001010000000000000515BI0100001120 | 12 | Each |
|---|
| 9 | 9 | Supply of unskilled labour for various works related to sweeping and cleaning as directed by the Engineer,cost complete in all respect. | BI01010001010000000000000515BI0100001121 | 10 | Each |
|---|