| 1 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 1100.00 | Kg | 57.51 | 63259.60 |
| Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded |
| 2 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 114.00 | Sqm | 201.89 | 23015.38 |
| Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for internal walls |
| 3 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 114.00 | Sqm | 443.92 | 50607.22 |
| Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904) |
| 4 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 8.00 | Sqm | 6423.70 | 51415.29 |
| Brick Masonry in superstructure with CM (1:6) prop: using 2nd class Bricks traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). |
| 5 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 1.93 | Cum | 11737.46 | 22636.28 |
| Reinforced cement concrete corresponding M20 Grade as per IS 456 equivalent to (1:1.5:3) mix prop. Nominal mix using 20mm size HBG Metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate ( Sand ) , coarse aggregate, water etc., to site including seignirage charges, VAT on all materials, all operational charges, incidental, and labour charges such as centering, shuttring, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc., complete but excluding cost of steel and its fabrication charges for finished item of work ( APSS No. 402 & 403) for Columns upto plinth beam |
| 6 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 2.62 | Cum | 11496.13 | 30142.85 |
| Reinforced cement concrete corresponding M20 Grade as per IS 456 equivalent to (1:1.5:3) mix prop. Nominal mix using 20mm size HBG Metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate ( Sand ) , coarse aggregate, water etc., to site including seignirage charges, VAT on all materials, all operational charges, incidental, and labour charges such as centering, shuttring, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc., complete but excluding cost of steel and its fabrication charges for finished item of work ( APSS No. 402 & 403) for Plinth beams |
| 7 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 1.46 | Cum | 9644.21 | 14104.66 |
| Reinforced cement concrete corresponding M20 Grade as per IS 456 equivalent to (1:1.5:3) mix prop. Nominal mix using 20mm size HBG Metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate ( Sand ) , coarse aggregate, water etc., to site including seignirage charges, VAT on all materials, all operational charges, incidental, and labour charges such as centering, shuttring, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc., complete but excluding cost of steel and its fabrication charges for finished item of work ( APSS No. 402 & 403) for Pedastal |
| 8 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 1.58 | Cum | 9135.21 | 14429.06 |
| Reinforced cement concrete corresponding M20 Grade as per IS 456 equivalent to (1:1.5:3) mix prop. Nominal mix using 20mm size HBG Metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate ( Sand ) , coarse aggregate, water etc., to site including seignirage charges, VAT on all materials, all operational charges, incidental, and labour charges such as centering, shuttring, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc., complete but excluding cost of steel and its fabrication charges for finished item of work ( APSS No. 402 & 403) for Footings |
| 9 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 1.30 | Cum | 3721.86 | 4838.41 |
| Plain Cement concrete (1:5:10) using 40 mm metal with Concrete mixture. using 40mm size HBG (SS5) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental, and labor charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402) All work upto plinth level Rate includes 13.615% contractor profit but excluding GST |
| 10 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 22.46 | Cum | 230.77 | 5183.93 |
| Earthwork work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, labour charges such as shoring sheeting, planking, strutting, etc,. Complete for finished item of work including seigniorage excluding dewatring charges etc., as per SS-20B (APSS308) |
| 11 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 2.00 | Each | 5058.14 | 10116.28 |
| Providing & placing on Terrace polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and overflow pipes but without fittings & base support for tanks.( From ssr rates sno 311) 500lts |
| 12 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 150.00 | Rmt | 181.41 | 27211.00 |
| Supply and fixing of PVC 110mm dia 3 Mts long single socket pirp 4kg/sq.cm |
| 13 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 8.00 | Each | 293.35 | 2346.83 |
| S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) withinternal / external threaded connection conforming toS&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 Material charges including skilled and semi-skilled labour charges |
| 14 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 30.00 | Rmt | 268.00 | 8040.00 |
| 34.90 OUTER DIA PIPE - Borewell to tank connections |
| 15 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 50.00 | Rmt | 197.00 | 9850.00 |
| Sanitary and water supply: Supply and fixing of Ashirvad/Ajay/Astral flowguard or equalent CPVC pipes and fitting to meet the requiremt of etc., complete. 28.60 OD Pipe |
| 16 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 3.00 | T | 57508.73 | 172526.19 |
| Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded |
| 17 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 1363.57 | Sqm | 201.89 | 275291.01 |
| Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for internal walls |
| 18 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 307.80 | sqm | 1516.27 | 466707.43 |
| Flooring with 25mm thick polished shabad stones set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials. |
| 19 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 27.00 | sqm | 4492.96 | 121309.92 |
| Flooring with high polished granite 16 to 18 mm mm thick slabs other than black set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tilesetc., complete, including seigniorage charges, labour charges for dressing of tilesetc., complete for finished item of work, but excluding the cost of conveyance of all materials |
| 20 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 1363.57 | Sqm | 443.92 | 605321.86 |
| Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904) |
| 21 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 178.14 | Sqm | 801.19 | 142723.66 |
| Dadooing to walls with colour glazed tiles 1st. quality of any size of brand as approved by Engineer-in-charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including c/c of all materials like cement, sand, water, tiles, etc. to site,., and other taxes on all materials, such as mixing of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work (APSS No.701 & 707) |
| 22 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 18.00 | Each | 3139.16 | 56504.92 |
| Providing and fixing of Ventilators Glazed - Fixed Double Frame and with Wire Netting (Schedule Item No. 312) |
| 23 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 8.78 | cum | 3962.00 | 34802.21 |
| Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm Diameter nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks,ball bearings, all accessories etc complete for finisheditemofworkasperspecialSpec:1108 |
| 24 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 60.24 | cum | 6423.70 | 386962.92 |
| Brick Masonry in superstructure with CM (1:6) prop: using 2nd class Bricks traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). |
| 25 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 374.00 | Sqm | 1332.83 | 498478.42 |
| Reinforced cement concrete corresponding M20 Grade as per IS 456 equivalent to (1:1.5:3) mix prop. Nominal mix using 20mm size HBG Metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate ( Sand ) , coarse aggregate, water etc., to site including seignirage charges, VAT on all materials, all operational charges, incidental, and labour charges such as centering, shuttring, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc., complete but excluding cost of steel and its fabrication charges for finished item of work ( APSS No. 402 & 403) for Roof slab 125mm thick |
| 26 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 27.21 | cum | 10986.47 | 298968.22 |
| Reinforced cement concrete corresponding M20 Grade as per IS 456 equivalent to (1:1.5:3) mix prop. Nominal mix using 20mm size HBG Metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate ( Sand ) , coarse aggregate, water etc., to site including seignirage charges, VAT on all materials, all operational charges, incidental, and labour charges such as centering, shuttring, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc., complete but excluding cost of steel and its fabrication charges for finished item of work ( APSS No. 402 & 403) for Roof beams |
| 27 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 8.87 | cum | 11496.13 | 101975.27 |
| Reinforced cement concrete corresponding M20 Grade as per IS 456 equivalent to (1:1.5:3) mix prop. Nominal mix using 20mm size HBG Metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate ( Sand ) , coarse aggregate, water etc., to site including seignirage charges, VAT on all materials, all operational charges, incidental, and labour charges such as centering, shuttring, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc., complete but excluding cost of steel and its fabrication charges for finished item of work ( APSS No. 402 & 403) for Plinth beams |
| 28 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 9.47 | cum | 11737.46 | 111130.27 |
| Reinforced cement concrete corresponding M20 Grade as per IS 456 equivalent to (1:1.5:3) mix prop. Nominal mix using 20mm size HBG Metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate ( Sand ) , coarse aggregate, water etc., to site including seignirage charges, VAT on all materials, all operational charges, incidental, and labour charges such as centering, shuttring, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc., complete but excluding cost of steel and its fabrication charges for finished item of work ( APSS No. 402 & 403) for Columns |
| 29 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 6.59 | cum | 9644.21 | 63536.06 |
| Reinforced cement concrete corresponding M20 Grade as per IS 456 equivalent to (1:1.5:3) mix prop. Nominal mix using 20mm size HBG Metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate ( Sand ) , coarse aggregate, water etc., to site including seignirage charges, VAT on all materials, all operational charges, incidental, and labour charges such as centering, shuttring, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc., complete but excluding cost of steel and its fabrication charges for finished item of work ( APSS No. 402 & 403) for Pedastals |
| 30 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 3.94 | cum | 9135.21 | 36011.00 |
| Reinforced cement concrete corresponding M20 Grade as per IS 456 equivalent to (1:1.5:3) mix prop. Nominal mix using 20mm size HBG Metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate ( Sand ) , coarse aggregate, water etc., to site including seignirage charges, VAT on all materials, all operational charges, incidental, and labour charges such as centering, shuttring, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc., complete but excluding cost of steel and its fabrication charges for finished item of work ( APSS No. 402 & 403) for Footings |
| 31 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 61.19 | cum | 3721.86 | 227755.29 |
| Plain Cement concrete (1:5:10) using 40 mm metal with Concrete mixture. using 40mm size HBG (SS5) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental, and labor charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402) All work upto plinth level Rate includes 13.615% contractor profit but excluding GST |
| 32 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 26.68 | cum | 844.97 | 22540.43 |
| Filling with sand in foundation in layers not exceeding 15 Cm thick conolidating each depasited layers by watering and ramming including cost and conveyance and Labour Charges as per drawing and technical specification Clause 305.3.9 MOR & 304 MORTH |
| 33 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 78.30 | cum | 230.77 | 18068.98 |
| Earthwork work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, labour charges such as shoring sheeting, planking, strutting, etc,. Complete for finished item of work including seigniorage excluding dewatring charges etc., as per SS-20B (APSS308) |
| 34 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 1466.10 | Sqm | 3.30 | 4833.22 |
| Clearing grass and removal of rubbish up to a distance of 50 m outside the periphery of the area as per Technical Specification Clause 201 MORTH. |
| 35 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 10.00 | Each | 232.78 | 2327.83 |
| Dismantling doors, windows and clear storey windows, ventilators etc.; (wood or steel) shutters including chowkhats, architraves, hold fasts and other attachments etc., complete and stacking them within 100 metre lead |
| 36 | Wholesale and Retail Fish Market at Nirmal Town | APSS | 111.42 | Cum | 764.44 | 85174.27 |
| Demolition including stacking of serviceable materials and disposal of unserviceable materials within 100 metres lead |