}

Operation And Comprehensive Maintenance Of Conventional/Addressable Fire Detection And Fire Alarm System With Fm200 Gas , Water Leak Detection And Bms Installed At Data Center Panchkula ( At Risk And Cost Of M/S Fairdeal Engineers ) , panchkula-Haryana

Bharat Sanchar Nigam Limited-BSNL has published Operation And Comprehensive Maintenance Of Conventional/Addressable Fire Detection And Fire Alarm System With Fm200 Gas , Water Leak Detection And Bms Installed At Data Center Panchkula ( At Risk And Cost Of M/S Fairdeal Engineers ) . Submission Date for this Tender is 09-10-2020. Flame Detectors Tenders in panchkula Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

25566551
Operation And Comprehensive Maintenance Of Conventional/Addressable Fire Detection And Fire Alarm System With Fm200 Gas , Water Leak Detection And Bms Installed At Data Center Panchkula ( At Risk And Cost Of M/S Fairdeal Engineers )
Open Tender
Indian
Haryana
panchkula
09-10-2020

Tender Details

Operation And Comprehensive Maintenance Of Conventional/Addressable Fire Detection And Fire Alarm System With Fm200 Gas , Water Leak Detection And Bms Installed At Data Center Panchkula ( At Risk And Cost Of M/S Fairdeal Engineers ) , Refilling Of Gas Fm-200 ( Heptafluropropane ) Electrically Non Conductive Clean Agent Gas In 80 Ltr High Pressure Seamless Cylinders I/C Dry Nitrogen For Maintaining Pressure Etc . Complete As Required . , Providing Refilling Kit ( To Be Used At Filling Plant ) For Refilling Fm 200 Gas Etc . Complete As Required , Decanting Of Fm 200 Gas From The Existing Cylinders And Servicing Of Valves Etc . Complete As Required . , Transportation Of Cylinders To And Fro Filling Plant I/C Transportation To Hydrotest Facility And Back To Filling Plant I/C Hydrotesting Of The Cylinders As Per Peso Norms Etc Complete As Required . , Packing Of High Pressure Seem Less Cylinders In Wooden Crate ( Coffin Box ) And Transporting The Same To And Fro The Oem Factory Filled And After Recharging Installing The Same At Site I/C Making All System In Working Condition Etc Complete As Reqd . , Installation Of Filled Filled Cylinder Back In The System I/C Complete Testing Etc . Complete As Required . , Fire Suppression System , Replacement Of Addressable Multi Sensor , Low Profile Intelligent Smoke Detectors With Multiple Sensitivity ( Adjustable At Site ) Levels ( Ul/Fm Listed/ Approved ) Complete With Junction Boxes And Original Base . I/C Dismantling Of Faulty Detectors , Installation Of New , Testing Of Whole Zone Etc Complete As Reqd . , Conventional Fire Alarm System , Replacement Of Existing 12V 42 Ah Batteries Of Main Fire Panel At Ground Floor Etc Complete As Reqd ( As Per Approved Makes ) , Testing Of Main Fire Panel Of 8 Zones , Lcp Of 2Nd Floor Of 6 Zones And 83 Nos . Detectors I/C Replacement Of Broken Glass Of Lcp/ Manual Call Point I/C Rectification Of Minor Defects , Cleaning Of Detectors Etc Complete Etc As Reqd , Water Leak Detection System , Replacement Of Faulty Water Leak Detection Sensing Cable I/C Testing Of All Water Leakage Detyection System And Making Workable I/C Reapairing Of Panel , Replacement Of Relay Or Other Parts Etc Complete As Reqd .

Key Value

Document Fees
INR 590 /-
EMD
INR 19236.0 /-
Tender Value
INR 9.61 Lakhs /-

BOQ Items

Name of Work: Operation and comprehensive maintenance of conventional/addressable fire detection and fire alarm system with FM200 gas, water leak detection and BMS installed at Data Center Panchkula( At Risk & Cost of M/S Fairdeal Engineers)
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Refilling of Gas FM-200 ( Heptafluropropane) electrically non conductive clean agent gas in 80 ltr High pressure seamless cylinders i/c dry Nitrogen for maintaining pressure etc. complete as required. 236 kg
2 2 Providing refilling kit (to be used at filling plant) for refilling FM 200 gas etc. complete as required 4 jobs
3 3 Decanting of FM 200 gas from the existing cylinders and servicing of valves etc. complete as required. 4 jobs
4 4 Transportation of cylinders to and fro filling plant i/c transportation to Hydrotest facility and back to filling plant i/c hydrotesting of the cylinders as per PESO norms etc complete as required. 1 job
5 5 Packing of high pressure seem less cylinders in wooden crate ( coffin box) and transporting the same to and fro the OEM factory filled and after recharging installing the same at Site i/c making all system in working condition etc complete as reqd. 4 Jobs
6 6 Installation of filled filled cylinder back in the system i/c complete testing etc. complete as required. 4 Jobs
7 7 Fire Suppression System
8 7.01 Replacement of addressable Multi sensor, low profile intelligent Smoke detectors with multiple sensitivity ( adjustable at site)levels(UL/FM listed/ Approved)complete with junction boxes and original base.i/c dismantling of faulty detectors, installation of new , testing of whole zone etc complete as reqd. 10 Jobs
9 8 Conventional Fire Alarm system
10 8.01 Replacement of existing 12V 42 AH batteries of Main Fire panel at ground floor etc complete as reqd( As per approved makes) 2 Jobs
11 9 Testing of main fire panel of 8 zones, LCP of 2nd floor of 6 zones and 83 nos. detectors i/c replacement of broken glass of LCP/ Manual call point i/c rectification of minor defects, cleaning of detectors etc complete etc as reqd 1 Jobs
12 10 Water Leak Detection system
13 10.01 Replacement of Faulty water leak detection sensing cable i/c testing of all water leakage detyection system and making workable i/c reapairing of panel , replacement of relay or other parts etc complete as reqd. 100 mtr
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail