}

Repair/ Maintenance Of Cranes , Boom Barrier , Stabilizer And Other Items At Af Station , Jamnagar, JAMNAGAR-Gujarat

Military Engineer Services-MES has published Repair/ Maintenance Of Cranes , Boom Barrier , Stabilizer And Other Items At Af Station , Jamnagar. Submission Date for this Tender is 07-10-2020. Gate Barrier Systems Tenders in JAMNAGAR Gujarat. Bidders can get complete Tender details and download the document.




Tender Notice

25477394
Repair/ Maintenance Of Cranes , Boom Barrier , Stabilizer And Other Items At Af Station , Jamnagar
Open Tender
Indian
Gujarat
JAMNAGAR
07-10-2020

Tender Details

Repair/ Maintenance Of Cranes , Boom Barrier , Stabilizer And Other Items At Af Station , Jamnagar

Key Value

Document Fees
INR 500 /-
EMD
INR 34000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: REPAIR/ MAINTENANCE OF CRANES, BOOM BARRIER, STABILIZER AND OTHER ITEMS AT AF STATION, JAMNAGAR.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Comprehensive maintenance of HOT gantry crane of capacity 1 Ton to 2 Ton, greasing & oiling of component, checking of serviceability of all component complete all as directed and directed by Engr-in-Charge.\n\n 40 Each Job
2 2 Comprehensive maintenance of EOT gantry crane of capacity 0.3 Ton to 3 Ton, greasing & oiling of component, checking of serviceability of all component, all as directed by Engr-in-Charge.\n\n 32 Job
3 3 Comprehensive maintenance of EOT gantry crane of capacity 5 Ton to 10 Ton, greasing & oiling of component, checking of serviceability of all component, all as directed by Engr-in-Charge.\n\nNote for item No 1 to 3:- \n(i) Replacement of unserviceable Spare part will be measured & paid separately under respective item of Schedule\n\n(ii) Comprehensive maintenance shall be carried out for 4 time in a year (@ interval of 3 months) for each crane and shall be measured as one Unit for payment \n\n 24 Job
4 4 Deployment of tools / equipment for Comprehensive load testing of HOT/EOT gantry crane of capacity 0.3 Ton to 3 Ton carrying out (once in a year) all as directed by Engr-in-Charge.\n\n 17 Job
5 5 Deployment of tools / equipment for Comprehensive load testing of HOT/EOT gantry crane of capacity 5 Ton to 10 Ton carrying out (once in a year) all as directed by Engr-in-Charge. \n\nNote for item No 4 & 5:-\n(i) Required load for testing of crane will be provided by the contractor under his own arrangement.\n\n(ii) Load testing shall be carried out through authorise service provider of OEM and Contractor shall produce certificate after load testing for the same. \n\n 6 Job
6 6 Material and labour for changing of gear oil of EOT crane of capacity 0.3 to 10 ton after draining out old oil cleaning of gear box etc complete all as directed by Engr-in-Charge.\n\n 50 Litre
7 7 S&F in repair power contactors of capacity 16 Amp 3 pole, 415 volt fixed to EOT crane & connecting complete all as directed by Engr- in- Charge.\n\n 8 Each
8 8 S&F in repair power contactors of capacity 32 Amp 3 pole, 415 volt fixed to EOT crane & connecting complete all as directed by Engr- in- Charge. \n\nMake: L&T / BCH / ABB / C&S.\n\n 4 Each
9 9 S&F in repair power contactors of capacity 40 Amp 3 pole, 415 volt fixed to EOT crane & connecting complete all as directed by Engr- in- Charge. \n\nMake: L&T / BCH / ABB / C&S.\n\n 4 Each
10 10 Supply and fix in repair single phase preventer for EOT crane & connecting complete all as directed by Engr- in- Charge. \n\nMake:- L&T / BCH / Minilec\n\n 6 Each
11 11 S&F in repair Flame proof Pendent of EOT crane with capacity 0.3 ton to 3 ton including (Forward & Reverse, Left & Right, Start & Stop, Up & Down, Emergency Stop) all connecting function complete all as directed by Engr- in- Charge.\n\n 1 Each
12 12 Dismantling & Refixing of wire rope of EOT/HOT crane from Rope Drum of capacity of 0.3 ton to 10 ton connecting complete all as directed by Engr- in- Charge.\n\n(Note -Checking of wire for its strenghing capacity and serviceability of steel wire rope.)\n\n 3 Each Job
13 13 S&F in repair flexible control cable, PVC insulated, PVC sheathed with multistranded, copper conductor, of size 4 sqmm 4 core, suitable for EOT crane & connecting complete all as directed by Engr -in -charge.\n\n 140 RM
14 14 S&F in repair flexible control cable, PVC insulated, PVC sheathed with multistranded, copper conductor, of size 1.5 sqmm 16 core, suitable for EOT crane & connecting complete all as directed by Engr -in -charge.\n\n 60 RM
15 15 S&F in repair of brake liner & lock set suitable for 2 ton to 3 ton capacity HOT crane complete all as directed by Engr -in charge.\n\n 4 Each
16 16 S&F in repair Limit Switches to control the movement of wheels of EOT crane of capacity 0.3 to 3 ton, fixed in position & connecting complete all as specified & directed by the Engineer-in-Charge.\n\nMake: BCH / L&T / Legrand / C&S.\n\n 4 Each
17 17 S&F in repair Limit Switches to control the movement of wheels of EOT crane of capacity 5 to 10 ton, fixed in position & connecting complete all as specified & directed by the Engineer-in-Charge.\n\nMake: BCH / L&T / Legrand / C&S.\n\n 4 Each
18 18 M&L for Repairing of 1 HP / 2 HP capacity electric motor of EOT crane, AC 3 phase, by dismantling the motor and taking out the old winding wires, cleaning the slots, rewinding the motor with appropriate size of super enamelled copper winding wire, and varnishing complete including replacing the worn out bearing reassembling the motor fixing in same position and testing complete all as specified and directed by Engr In charge. \n\n 8 Each Job
19 19 Material and labour for renewal earthing complete with galvanized iron earth plate electrode 600 mm x 600 mm x 6 mm thick buried directly in ground (earth pit not less than 2.25 m deep below normal ground level) with top edge of the plate not less than 1.5 m deep below normal ground connected to galvanized steel strip of 25 x4 mm size by means of bolts nuts check nuts and washer of galvanized steel, watering pipe of 20 mm bore, galvanised iron, light grade, and.....\n\n 16 Each Job
20 19.01 .......15 mm bore galvanised iron light grade for earth wire protection including all excavation earth work in any type of soil, PCC pit in PCC 1:2:4 type B-1 and RCC 1:2:4, type B1 for precast chamber cover 50 mm thick, reinforced with welded steel wire fabric or XPM Jali (weight not less than 4.00 Kg / sqm), with charcoal, salt, funnel complete all as shown in the electrical plate No 3 of SSR part –I and testing on completion complete all as directed and directed by Engr-in-Charge.\n\n
21 19.02 Note:-Quoted rates shall be deemed to include for earth wire with protection pipe up to 7.5 M length. \n\n
22 20 S&F in repair earth continuity conductor or main earthing strip of Galvanised iron strip of size 25 x 4 mm complete fixed to wall / chases or buried in ground or drawn through conduit in any position or any other situation for loop earthing etc with and including epoxy insulators with necessary fixture complete all as specified and directed by Engg -in - Charge.\n\n 120 RM
23 21 S&F in repair earth continuity conductor or main earthing strip of Copper strip of size 20 x 3 mm complete fixed to wall / chases or buried in ground or drawn through conduit in any position or any other situation for loop earthing etc with and including epoxy insulators with necessary fixture complete all as specified and directed by Engg -in - Charge \n\n 110 RM
24 22 Brazing of copper strip using brazing torch of suitable temp and using brazing rod all as specified and directed by Engg -in-charge.\n\n 25 Each Job
25 23 Dismantling & Refixing of servo Voltage Stabilizer / isolation transformer of any capacity (10 KVA to 400 KVA) and Testing for its serviceability with identifying the fault at installed location complete directed by Engg in Charge. \n\n(Note :- Transportation charges to & fro if required is deemed to be in the rate quoted & Item replace cost measure separately from BoQ) \n\n 30 Each Job
26 24 Overhauling of isolation transformer of capacity 750 KVA 433 V, by disconnecting connections, draining out complete transformer oil, cleaning & descaling of entire internal surface, core & winding, reassemble, by replacement of nut, bolt, washer packing etc, refilling the same transformer oil reconnecting with connections, testing and commissioning on load complete all as specified & directed by Engr-in-Charge for the following transformers. \n\n 1 Each Job
27 24.01 Note:-\n(i) Filtration of transformer oil if required will be measured & paid separately.\n\n(ii) Topping up with new transformer oil if required will be measured & paid separately\n\n(iii) Any spare Part & rewinding if found unserviceable will be measured & paid separately as supply & fix in repair.\n\n
28 25 All as per item No 24 above but isolation transformer of capacity 160 / 110 KVA.\n\n 2 Each Job
29 26 All as per item No 24 above but isolation transformer of capacity 63 KVA.\n\n 1 Each Job
30 27 Overhauling of LT oil cooled servo controlled voltage stabilizer of capacity 10 to 50 KVA by disconnecting of electrical connections, draining out complete stabilizer oil, cleaning & decaling of entire internal surface, core & winding, reassemble, by replacement of complete set of carbon bushes, nut, bolt, washer packing etc, refilling the same stabilizer oil and reconnecting with electrical connections, testing and commissioning on load complete all as specified & directed by Engr-in-Charge for the following stabilizers. \n\nNote:-\n(i) Filtration of stabilizer oil if required will be measured & paid separately.\n\n(ii) Topping up with new stabilizer oil if required will be measured & paid separately\n\n 20 Each Job
31 28 All as per item No 27 above but voltage stabilizer of capacity 75 to 100 KVA.\n\n 7 Each Job
32 29 All as per item No 27 above but voltage stabilizer of capacity 125 to 200 KVA.\n\n 11 Each Job
33 30 All as per item No 27 above but voltage stabilizer of capacity 225 to 450 KVA.\n\n 2 Each Job
34 31 M & L for rewinding of Stabilizer /Isolation transformer of any capacity by dismantling and removing the burnt out copper winding cleaning of limb thoroughly and rewinding the same with supper enamelled copper winding wire of the same gauge and turn with proper class of insulation impegrauated & baking, assembling and testing including replacement of cork sheet, neoprene gasket etc complete all as specified & directed by Engineer-in-Charge.\n\n 600 Kg
35 32 Supply & fix in repair Electronic circuit card comprising IC's, Regulators, Condensers, Transistors, Triac etc of servo controlled voltage stabilizer of any capacity complete all as specified & directed by Engg in Charge.\n\n 20 Set of three
36 33 Supply & fix in repair protection alarm circuit incorporating High & Low voltage cut-off, overload cut-off, phase reversal protection of servo voltage stabilizer of any capacity complete all as specified and directed by Engg in Charge.\n\n 10 Each
37 34 Supply & fix in repair torque motor of capacity 10 kg.cm for servo voltage stabilizer complete all as specified and directed by Engg in Charge.\n\n 12 Each
38 35 Supply & fix in repair torque motor of capacity 20 kg.cm for servo voltage stabilizer complete all as specified and directed by Engg in Charge.\n\n 10 Each
39 36 Supply & fix in repair Micro Switch of servo voltage stabilizer complete all as directed and directed by Engr-in-Charge.\n\n 8 Each
40 37 Supply & fix in repair selector switch of servo voltage stabilizer complete all as directed and directed by Engr-in-Charge.\n\n 12 Each
41 38 Supply & fix in repair control switches of servo voltage stabilizer complete all as directed and directed by Engr-in-Charge.\n\n 14 Each
42 39 Supply & fix in repair electronic/Analog type Voltmeter of servo voltage stabilizer complete all as directed and directed by Engr-in-Charge.\n\n 18 Each
43 40 Supply & fix in repair electronic/Analog type ammeter of servo voltage stabilizer complete all as directed and directed by Engr-in-Charge.\n\n 18 Each
44 41 Supply & fix in repair neon indicators of servo voltage stabilizer complete all as directed and directed by Engr-in-Charge.\n\n 12 Each
45 42 S&F in repair LT metal parts and LT bushing suitable for 200/150 KVA indoor voltage stabilizer complete all as directed and directed by Engr-in-Charge.\n\n 6 Each Job
46 43 S&F in repair LT metal parts and LT bushing suitable for 100/75/50 KVA indoor voltage stabilizer complete all as directed and directed by Engr-in-Charge.\n\n 8 Each Job
47 44 S&F in repair LT metal parts and LT bushing suitable for 10 to 50 KVA indoor voltage stabilizer complete all as directed and directed by Engr-in-Charge.\n 12 Each Job
48 45 Dehydration / filtration of transformer oil of Isolation transformers, Stabilizers etc of various capacities installed at different locations by disconnecting plants electrically for recirculation existing transformer oil with trolley mounted filtration plant till dielectric strength not less than 40 KV.\n\nNote :- Quoted rates shall be deemed to include for following :- \n\n(i) Oil shall be tested after filtration and test result will be recorded before & after filtration of oil.\n\n(ii) Contractor should make his own arrangement for oil filtration plant including transportation complete.\n\n 2000 Ltrs
49 45.01 (iii) Transformer oil for topping up will be measured and paid in relevant item as required\n\n(iv) Dehydration & filtration of oil transformer shall be carried out ON-Line. Shut down will be given for making necessary pipe / hose line connection from machine to stabilizer / transformer\n\n\n
50 46 Supply & topping up of transformer oil up to required level for Isolation transformer , stabilizers etc of dielectric strength 50 KV & above all as per IS specification. \n\n 900 Ltrs
51 47 Preventive maintenance / servicing of electric operated boom barrier for smooth functioning of any make, maintenance by cleaning of complete unit checking of all electrical component & wiring etc oiling / greasing of moving part including replacement of unserviceable component complete all as directed and directed by Engr-in-Charge.\n\n 8 Each
52 47.01 Note:-(i) Unserviceable spares parts will be measured & paid separately as supply & fix in repair.\n\n
53 47.02 (ii) Maintenance Work shall be executed through Authorised service technician of OEM.\n\n
54 47.03 (iii) Contractor shall submit the documentary evidence of Authorised service technician for the approval of GE before commencement of work.\n\n
55 47.04 (iv) Contractor shall submit certificate, obtain from Authorised service centre that work has been executed by them. \n\n
56 47.05 (v) Above said certificate shall be endorse by Engineer-In-Charge.\n\n
57 48 Supply & fix in repair of boom of boom barrier any length fabricated with aluminium rectangular section of size 45 mm x 100 mm x wall thickness 1.5 mm, cut to size including powder coating & reflective sheet band complete as directed & as per manufacture instruction.\n\n 26 RM
58 49 Supply & fix in repair barrier lock for the safety of mother board, motor from dust and better serviceability complete all as directed and directed by Engr-in-Charge.\n\n 6 Each
59 50 Supply & fix in repair wireless Remote control unit with battery for opening & closing of boom of boom barrier complete all as directed and directed by Engr-in-Charge.\n\n 4 Each
60 51 Supply and fix in repair of complete Mother Board, comprising control board of boom barrier, Limit switch interface, radio receiving interface complete all as directed and directed by Engr-in-Charge.\n\n 4 Each
61 52 Supply and fix in repair of Radio receiver for communicate with remote and control board complete all as directed and directed by Engr-in-Charge.\n\n 4 Each
62 53 Supply & laying 40 mm bore mild steel galvanised iron tubing light grade for protection of cable / earth continuity conductor etc, fixed to poles / wall with clamp nut bolt etc / laid on roof or laid on floors, road, crossing or ducts etc, including taking down old tubing complete all as directed and directed by Engr-in-Charge.\n\n 60 RM
63 54 Supply, installation, testing, & commissioning, factory made, CPRI approved, outdoor type, LT Panel board, compartmental type, confirming to IS 5039- with IP-54 protection, made out of 3.15 mm thick CRCA sheet , 415 Volt, 3 phase , 50 Hz supply mounted on and including Mild steel angle section 40 x 40 x 5 mm frame with front and back openable, double door with provision of locking arrangement dust & vermin proof, gasket, TPN bus bar shall be insulated with......\n\n\n 2 Each
64 54.01 ......colour coated heat shrinkable sleeves and shall be mounted on proper insulator, gland, welding hinges of dust proof, overall powder coated, internal wiring with PVC insulated multi-stranded copper conductor cable of appropriate size & length with fixing lugs, bolts, screws etc complete including taking down old panel, complete all as directed and directed by Engr-in-Charge & Consisting of the following switchgear:-\n\n
65 54.02 (a) Aluminium bus bar of size 100 amps for phase and 50 amps for neutral & shall be insulated with colour coded heat shrinkable sleeves and shall be mounted on proper insulator etc including connection complete. - 01 set \n\n
66 54.03 (b) LED indicator lamp with holder (Yellow, Blue, Red) – 01 set (Set of Three) \n\n
67 55 S & F voltage surge protection device (SPDs) for low voltage power distribution system 3 phase, 4 wire system 415 V type II (8/20 micro sec) 40 Ka, 3 Phase + neutral, 4 module complete all as directed and directed by Engr-in-Charge.\n\nMake: Legrand cat part No.0039 38 or equivalent of Make ABB, L&T, Havells \n\n 4 Each
68 56 Supply and fix in repair technical manual MCB Changeover switch, two way centre off, Four pole,40 A, 415 V - 50 Hz, rated impulse voltage 4 KV fixed in existing panel & connecting complete all as specified & directed by Engr in charge.\n\n 3 Each
69 57 Supply and fix in repair MCB 63 Amp, Four Pole, breaking capacity 10 KA, 415 V - 50 Hz, fixed in existing panel & connecting complete all as specified & directed by Engr in charge.\n\n 6 Each
70 58 Supply and fix in repair MCB 32/40 Amp, Four Pole, breaking capacity 10 KA, 415 V - 50 Hz, fixed in existing panel & connecting complete all as specified & directed by Engr in charge.\n\n 8 Each
71 59 S&F in repair LED Traffic signal light, 24W, viewing angle 23°,high intensity, ,polycarbonate body with IP65 protection, fire retardant, glass epoxy,FR4 printed circuit board with protection cover and clear polycarbonate concave lenses, input voltage 210-240V,working temperature -40°C to 80°C in colour indication of Green/Red for giving signal to move or stop for vehicle/person fixed on existing pole all as specified & directed by Engg-in-charge. \n\nMake:- Nucleonics / Trafitronics or equivalent approved by GE\n\n 2 Each
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail