}

Day To Day Maintenance Repairs To Internal External Electric Supply , Water Supply , Dg Set , Lighting Protection System , Security Street Lights , Air Conditioners , Fire Fighting System Etc At Icgs Beypore And Kozhikode, BEYPORE-Kerala

Military Engineer Services-MES has published Day To Day Maintenance Repairs To Internal External Electric Supply , Water Supply , Dg Set , Lighting Protection System , Security Street Lights , Air Conditioners , Fire Fighting System Etc At Icgs Beypore And Kozhikode. Submission Date for this Tender is 06-10-2020. Fire Fighting Consumable Tenders in BEYPORE Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

25452093
Day To Day Maintenance Repairs To Internal External Electric Supply , Water Supply , Dg Set , Lighting Protection System , Security Street Lights , Air Conditioners , Fire Fighting System Etc At Icgs Beypore And Kozhikode
Open Tender
Indian
Kerala
BEYPORE
06-10-2020

Tender Details

Day To Day Maintenance Repairs To Internal External Electric Supply , Water Supply , Dg Set , Lighting Protection System , Security Street Lights , Air Conditioners , Fire Fighting System Etc At Icgs Beypore And Kozhikode

Key Value

Document Fees
INR 500 /-
EMD
INR 34000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: DAY TO DAY MAINTENANCE/REPAIRS TO INTERNAL/EXTERNAL ELECTRIC SUPPLY, WATER SUPPLY, DG SET, LIGHTING PROTECTION SYSTEM, SECURITY/ STREET LIGHTS , AIR CONDITIONERS, FIRE FIGHTING SYSTEM ETC AT ICGS BEYPORE & KOZHIKODE 8728/E8
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Taking down carefully (copper/aluminum) point wiring complete of any type (batten/surface conduit) for light point, fan point, bell point socket point or power point complete with all fitting such as switches, sockets pendants regulators etc complete and making good disturbed surfaces of wall, floor or ceiling with plaster or tiles or roof treatment etc and finishing the surfaces with distemper/white washing/colour washing to match with the existing surface complete all as specified and directed. 130 Each Point
2 2 Material and Labour for point wiring complete using 1.5 Sqmm PVC insulated unsheathed copper conductor, stranded cable (FR) upto and including working voltage 1100volts grade, drawn through and including non metallic rigid PVC casing and caping of suitable size including all accessories ISI marked including pressed steel terminal sunken boxes of size 1.2mm covered with 3mm thick plastic laminated sheet ISI marked top cover fixed with Brass screws and unsheathed copper conductor stranded cable(FR) earth continuity wire connected to DBs/sunken boxes/fittings of size 1.5 Sqmm Cross sectional area and all other metal parts with earth dolly for the following:-
3 3 (a ) one light point controlled by one switch 5 Amps 40 Each Point
4 4 (b ) one fan point point controlled by one switch 5 Amps 30 Each Point
5 5 (c) One 3 pin socket outlet 5 Amps on Independent board 20 Each Point
6 6 (d ) One 3 pin socket outlet 5 Amps on same board 15 Each Point
7 7 ( e) One bell point controlled by one bell push 10 Each Point
8 8 All as per Item No. 2 above but with 4 sq mm PVC insulated copper conductor cable(FR) including 4 sq mm PVC copper conductor used as earth wire for power point on independent board for One 3 pin socket outlet, 15 Amps. 15 Each Point
9 9 Supply and fix Switch piano Flush, single pole, one way 5 amp 230 Volts, AC, with ISI mark complete all as specified and directed. 70 Each
10 10 Supply and fix Switch Socket Combination 2 in 1, 5 Amps flush type 230 Volts, AC, with ISI mark complete all as specified and directed. 20 Each
11 11 Supply and fix Switch Socket Combination 2 in 1, 5 Amps /16 Amps flush type 230 Volts, AC, with ISI mark complete all as specified and directed. 15 Each
12 12 Supply and fix Socket outlet 2 in 1, 5 Amps flush type 230 Volts, AC, with ISI mark complete all as specified and directed. 20 Each
13 13 Supply and fix Bell electric Ding Dong 230 Volts, AC, with ISI mark complete all as specified and directed. 10 Each
14 14 Attending internal/ external electric complaint for maintenance/breakdown, round the clock for maintenance, checking, fault finding and rectification of fault in LT panels/Overhead HT/LT lines, transformers, switchgears and carry out repairs and resume electric supply complete all as specified and directed by Engineer-in-charge.\nNote:- (a)Day to day complaint rectified by the Electrician shall be written in complaint register and completion report recorded in complaint register and complaint document slip rectified complaints only will be paid.\n(b) The spares required for the rectification of fault shall be measured under items 15 to 39. 220 Each Job
15 15 Supply only Switch piano Flush, single pole, one way 5 amp complete all as specified and directed. 70 Each
16 16 Supply only of Switch Socket Combination 2 in 1, 5 Amps flush type complete all as specified and directed. 40 Each
17 17 Supply only Switch Socket Combination 2 in 1, 5 Amps /16 Amps flush type Complete all as specified and directed. 20 Each
18 18 Supply only Bell electric ding dong 230 V complete all as specified and directed. 15 Each
19 19 Supply only Bell push 5 Amps one way complete all as specified and directed. 15 Each
20 20 Supply only Electronic fan regulator 230 volts, step type,socket type, hum free 120 watt ISI Marked complete all as specified and directed. 20 Each
21 21 Supply only Ceiling rose in poly carbonate 3 plates flush type 6 Amps, 250 volts AC complete all as specified and directed. 20 Each
22 22 Supply only Lamp holders bakelite body with back plate suitable for battern fitting/angle fitting complete all as specified and directed. 25 Each
23 23 Supply only of Modular switch, one way, 6Amps, one module complete all as specified and directed. 25 Each
24 24 Supply only Modular switch, one way, 16Amps one module complete all as specified and directed. 20 Each
25 25 Supply only Modular switch, two way, 6 Amps one module complete all as specified and directed. 15 Each
26 26 Supply only Modular socket outlet, 6 Amps, 2 and 3 pin two module complete all as specified and directed. 20 Each
27 27 Supply only Modular socket outlet, 6 Amps/ 16 Amps, 2 and 3 pin two module complete all as specified and directed. 10 Each
28 28 Supply only Modular fan regulator step type, 120 Watt one module complete all as specified and directed. 20 Each
29 29 Supply only Modular Bell push, 6 Amps one module complete all as specified and directed. 10 Each
30 30 Supply only Modular switch socket combination 16 A 6 pin complete all as specified and directed. 15 Each
31 31 Supply only Condenser 2.5 Mfd AC 240V, complete all as specified and directed.\n\n\n 70 Each
32 32 Supply only Condenser 4 Mfd AC 240V, complete all as specified and directed.\n\n\n 20 Each
33 33 Supply only LED tube light batten 20 watt, 240 volts complete all as specified and directed.\nMake: CELS Cat part No CLLC-TBLP-20 or equivalent in Havells/Philips/Crompton Greaves. 155 Each
34 34 Supply only LED bulb 9 watts, 230 volt complete all as specified and directed. Make: CELS Cat part No CLLC-LP-10 or equivalent in Havells/Philips/Crompton Greaves. 263 Each
35 35 Supply and fix in repairs LED recess suitable for false ceiling 2 ft X2 ft, 40 watts , 240 volts AC supply complete all as specified and directed. \nMake : Cat part No CLLC-RMLSS-40 of CELS or Equivalent in Havells/Philips/Crompton Greaves. 4 Each
36 36 Supply only LED mirror light of 10 Watt complete all as specified and directed. \nMake:Cat No CLLC-MRL-10 of CELS or equivalent in Havells Philips/Bajaj/Surya. 40 Each
37 37 Supply only MCB single pole & neutral 240 volt C curve 10 KA 63 Amps capacity IP 20 transparent lebel holder fully insulated safety shutters suitable for cable up to 35 Sqmm cross sectional area complete including suitable size copper lugs complete all as specified and directed. 3 Each
38 38 All as per ser item No 37 above but MCB TPN 415 volt C curve 10 KA 40 Amps capacity complete all as specified and directed. 10 Each
39 39 All as per ser item No 37 here-in-before but MCB single pole, 6 to 32 Amp 240 volt C curve 10 KA complete all as specified and directed. 25 Each
40 40 Material and labour for Sub main wiring using two runs of single core PVC insulated cable(FR) 4 sqmm copper conductor multi stranded and one run of 4 sqmm copper conductor insulated cable (FR)using as earth wire drawn through and including suitable size PVC Casing and Caping including taking down old aluminium/Copper Sub main wirng complete all as specified and directed. \nNote- 3 run of 4 sq mm PVC copper wire and One run of PVC casing caping shall be measured and paid as one unit. 30 Running Metre
41 41 Material and labour for Sub main wiring using two runs of single core PVC insulated cable (FR) 6 sqmm copper conductor multi stranded and one run of 6 sqmm copper conductor insulated cable (FR)using as earth wire drawn through and including suitable size PVC Casing and Caping including taking down old aluminium/Copper Sub main wirng complete all as specified and directed. \nNote- 3 run of 6 sq mm PVC copper wire and One run of PVC casing caping shall be measured and paid as one unit. 30 Running Metre
42 42 Material and labour for Sub main wiring using four runs of single core PVC insulated cable(FR) 6 sqmm copper conductor multi stranded and two runs of 6 sqmm copper conductor insulated cable (FR)using as earth wire drawn through and including non metallic PVC conduit pipe ISI marked of size 25 sq mm including taking down old aluminium/Copper Sub main wirng complete all as specified and directed. \nNote- 6 run of 6 sq mm PVC copper wire and One run of PVC conduit shall be measured and paid as one unit. 25 Running Metre
43 43 Supply and fix in repairs Distribution board (DB) made out of sheet metal enclosure (CRCA sheet), dust and vermin proof, TPN 4 way with 200 Amps rated copper bus bar double door protection, neutral bar,earth bar, single pole and neutral 415 volts, MCBs used as incommer Double door, flush to wall complete all as spd and directed . 2 Each
44 44 All as per ser item No 43 above but SPN 4 way, double door 240 volts. 2 Each
45 45 All as per ser item No 43 above but SPN 8 way, double door 250 volts 1 Each
46 46 Supply and fix in repairs single pole and neutral enclouser with a two pin and earth plug and socket complete with and including one MCB single pole 20 Amps complete all as specified and directed. 5 Each
47 47 Taking down fan of any type and size after disconnecting, depositing to store yard and Hanging/fixing only after repair/reconditioning fan of any type and size all as directed. \nNOTE: Repair and reconditioning of fan shall be measured and paid separately under Item Nos.48 to 52.\n 44 Each Job
48 48 Collecting unserviceable ceiling fan 1200mm sweep 230V, AC single phase from store yard of AGE E/M and transporting to local market, cutting unserviceable winding from fan stater & rewinding same with super enamelled copper winding wire of existing gauge size including throughly cleaning all the components, oiling greasing & replacement of rusted unserviceable screws, hanging clamps with rubber reel, canopy condensers, bush, bearing & flexible copper connection wire etc complete all as directed.\nNote : (i) Taking down for repair and refixing after repair work shall be measured and paid under Item No.47 above.\n(ii) Spare such as Hanging clamps, canopy, condenser and flexible copper connection wire, painting, down rod, bearing, bush, clamps etc shall be measured & paid separatetly under item Nos.53 to 65. 35 Each Job
49 49 All as per item No 48 above but exhaust fan 300 mm sweep 7 Each Job
50 50 All as per item No 48 above but Wall fan 450 mm sweep 2 Each Job
51 51 Material and Labour for Scraping down old paint of ceiling fan of any size 1200 mm sweep complete body & blade including down rod filling the cavities with filler and making smooth surface by applying sand paper painting the ceiling fan by means spray gun/brush with two coats of synthetic enamel white paint complete all as specified and directed. 30 Each Job
52 52 Material and Labour for lathe work for proper filling/fixing of bearing/bushes in the top cover of the fan by filling a layer of matter after blazing & bottom cover of fan complete all as specified and directed. 20 Each Job
53 53 Supply only Ball bearing Ser No 6201 or 6202 complete all as specified and directed. \nMake : MDS/SKF/NBL 20 Each
54 54 Supply only Ball bearing Ser No 6203/6204 complete all as specified and directed. \nMake : MDS/SKF/NBL or as per existing specifications as per sample 20 Each
55 55 Supply only Gun metal bush for ceiling fan complete all as specified and directed. 1 Kilogram
56 56 Supply only Shackle type rubber reel,'U' clamps, bolts,split pin & washer complete all as specified and directed. 20 Each
57 57 Supply only Canopy top/bottom suitable for 20mm dia rod complete all as specified and directed. 20 Each
58 58 Supply only Down rod 300mm long of size 20mm dia ISI marked complete all as specified and directed. 20 Each
59 59 Supply only Fan blades (three leaves)suitable for 1200mm sweep fan make & type complete all as specified and as directed . 20 Each\nSet
60 60 Supply only 1.2mm thick mild steel top/bottom cover for ceiling fan any size and make complete all as specified and as directed . 20 Each
61 61 Supply and fixing in repairs Exhaust fan blade (three leaves) of 450mm sweep complete as per sample of the following sizes complete all as specified and as directed . 2 Each\nSet
62 62 All as per item No 61 above but for 300mm sweep 5 Each\nSet
63 63 Supply and fixing in repairs Exhaust fan clamps including frame and louvers with rubber bush, etc suitbale for 450mm sweep complete as per sample complete all as specified and as directed . 2 Each
64 64 All as per item No 63 above but for 300mm sweep. 5 Each
65 65 Supply and fixing in repairs Oscillating mechanism suitable for wall mounting fan any make and type all complete all as specified and as directed . 5 Each
66 66 Supply and fixing in repairs Exhaust fan Motor of 450mm sweep heavy duty complete as per sample of the following sizes complete all as specified and as directed . 1 Each
67 67 All as per item No 66 here-in-before but for 300mm sweep 4 Each
68 68 Taking down carefully geyser of any make and capacity 25/50ltrs, dismantling the geyser for inspection, cleaning of tank, repalcement of defective part such as heating element, thermostat switch, spacer ring, safety plug, glass wool, neon lamp, head assembly, rubber gasket, top and bottom cover, inspection plate, copper cable 3 core, 3 pin Top plug, element holding clamp, welding of studs for head assembly, defective inner and outer shell reassembling the geysers with one coat of milky white synthetic enamel spray paint of approved quality after cleaning of all dust rust etc and writing of MES No on the geyser using black paint, Reinstallation of geysers to its original postion complete all as specified. \n\nNote : Spare parts such as heating element thermostat switch, spacer ring, heon lamp, head assembly, glass wool, safety plug rubber, gasket, copper cable, top & bottom cover, inspection plate, CP & PVC connection, Plug Top, Outer & Inner shell element holding clamps etc shall be measured & paid for seperately in respective items here in after. 5 Each Job
69 69 Supply only heating element any type (i.e; Cup,thread or triangular) 1.5 KW, 220/230 volts ISI marked. \n 6 Each
70 70 Supply only heating element any type (i.e; Cup,thread or triangular) 2.0 KW, 220/230 volts ISI marked.\n 4 Each
71 71 Supply only Thermostat ISI marked complete all as specified and complete all as specified and as directed . 6 Each
72 72 Supply only Head Assy "Brass" 8 to 9 holes suitable for 25 ltrs capacity all complete all as specified and as directed .\n 3 Each
73 73 Supply only Safety plug "brass" ISI marked suitable for 25/50 ltrs geyers complete all as specified and directed. 4 Each
74 74 Supply only PVC connections 15mm size for Hot and cold water connection with rubber washer & brass nuts, ISI marked of length 600mm complete all as specified and directed. 10 Each
75 75 Supply only copper flexible 3 core PVC insulated,PVC sheathed FR, ISI marked of size 2.5 sqmm copper conductor complete all as specified and directed. 25 Running Metre
76 76 Supply only geyser inner assembly of brass with inlet/outlet & over flow provision rubber washer suitable for 25 ltrs capacity all as specified and complete all as specified and as directed . 5 Each
77 77 Supply only bottom cover plate in two halves with self toppiry suitable and as per sample complete all as specified and directed. \nMake :Bajaj, Peeco, Recold/DITZ 5 Each
78 78 Supply only phase indicator red colour circular/rectangular shape as suitable and as per sample complete all as specified and directed. 5 Each
79 79 Supply and fixing in repairs non return brass valve of 15mm bore, ISI marked complete all as specified and as directed . 5 Each
80 80 Supply and fixing in repairs pressure release brass valve of 15mm bore ISI marked complete all as specified and as directed . 2 Each
81 81 Supply only PVC connections 15mm size for Hot and cold water connection with rubber washer & brass nuts, ISI marked of length 450mm complete all as specified and directed. 2 Each
82 82 Supply and fixing in repairs Plug top 3 Pin 15 Amps 230 volts complete all as specified and as directed . 5 Each
83 83 Material and labour for servicing including cleaning of condensor & eveporator coils fins with mild detergent and descaling of condensor coil for split type AC of any make/ capacity after taking down the whole unit and refixing at the existing location or any other new location after servicing all as specified and directed. \n\nNote: Spare parts shall be measured and paid separately under relevant item. 4 Each Job
84 84 Material and labour for Shifting of split type AC existing location to the new location and making good the opening of old location with cement mortor 1:3, treating the wall to matching with existing surfacce finish and making opening holes on brick wall at new location and gap well finish with cement mortor 1:3, making good the wall surface to match with existing surface, installation and commissioning with replacement of insulation of suction & discharge line complete all as directed. 3 Each Job
85 85 Supply and fix in repairs Printed Circuit Board suitable for 2TR Capacity Split Unit Air Conditioners including remote, etc. all as specified and as directed.\n\nNOTE: Make of PCB & remote shall be of existing manufacturer as compatible with the AC. 2 Each Job
86 86 Supply and fix in repairs Printed Circuit Board suitable for 1.5TR Capacity Split Unit Air Conditioners including remote, etc. all as specified and as directed.\nNOTE: Make of PCB & remote shall be of existing manufacturer as compatible with the AC. 2 Each Job
87 87 Disconnecting, dismantling and taking out existing burnt out compressor from window/Split type Air conditioner 2 TR Capacity and supply and fixing sealed unit compresser of existing capacity 2 TR, single phase, 230 V AC supply initialy filled with compressor oil as speciifed by Engr-in-charge and testing on load for 24 hrs in summer complete all as specified and as directed.\nMake : LG/ Voltas/ Samsung 3 Each Job
88 88 Disconnecting, dismantling and taking out existing burnt out compressor from window/Split type Air conditioner 1.5 TR Capacity and supply and fixing sealed unit compresser of existing capacity 1.5 TR, single phase, 230 V AC supply initialy filled with compressor oil as speciifed by Engr-in-charge and testing on load for 24 hrs in summer complete all as specified and directed.\nMake : LG/ Voltas/ Samsung 3 Each Job
89 89 Supply and fix in repairs AC blower fan motor for AC suitable for 2 TR AC suitable operate on 230 Volt AC supply at 50 Hz complete all as specified and directed. 5 Each
90 90 Supply and fix in repairs Capacitor 45 MFD complete all as specified and directed. 4 Each
91 91 Supply and fix in repairs Capacitor 50 MFD complete all as specified and directed. 5 Each
92 92 Supply and fix in repairs Drier stainer filter suitable for AC/Water cooler/Refrigertor complete all as specified and directed. 6 Each
93 93 Supply and fix in repairs insulation Nytrile foam insulation suitable for 5/8 inch copper tube as per site requirement of approved make all as specified and directed . 20 Running Metre
94 94 Supply and fix in repairs insulation Nytrile foam insulation suitable for 1/4 inch copper tube as per site requirement of approved make all as specified and directed . 20 Running Metre
95 95 Supply and fix in repairs Copper tube 5/8 inch size as per site requirement of approved make all as spd and directed . 20 Running Metre
96 96 Supply and fix in repairs Copper tube 1/4 inch size of approved make all as specified and directed . 20 Running Metre
97 97 Supply and fix in repairs Evaporator unit (indoor unit ) complete suitable for 2 TR Capacity Split type Air Conditioners 5 star rating with latest ISEER complete all as specified and directed. \nMake : LG/ Voltas/Goderj 1 Each
98 98 Supply and fix in repairs Condensing (Out door) unit complete including compressor, etc. suitable for 2 TR Capcity Air conditioners 5 star rating with latest ISEER complete all as specified and directed. \nMake : LG/Voltas/Goderj 1 Each
99 99 Supply and fix in repair Bracket stand suitable for 2 TR Capacity Split type AC including Fastners, etc. Complete all as specified and directed. 3 Each set of two
100 100 Supply and charging R-22 gas to maintain the required cooling effect as and when required in the split AC/ window type AC & other cooling applinces complete all as specified and as directed. 15 Kilogram
101 101 Excavation in trenches in soft/loose soil not exceeding 1.5 mtr wide and not exceeding 1.5 meter in depth for taking out and laying UG cable and getting out, excavated earth, forming bottom surfaces to required level complete all as specified and directed. 48 Cubic Metre
102 102 Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm complete all as specified and as directed. 17 Cubic Metre
103 103 Removing excavated soil and depositing to the sides and returning filling in including spreading leveling watering and well ramming in layers n.exc 25cm thick in soft/loose soil after cable is laid complete all as specified. 31 Cubic Metre
104 104 Material and labour for providing dry screened river sand as in sand cushioning to under ground cable including punning down of sand by layer complete all as specified and as directed. \nNOTE: Punned thickness shall be measured and paid. 6 Cubic Metre
105 105 Supply and laying cable protection cover un- reinforced precast concrete cable covers class LV, type-1 flat size 250mmx150mmx40mm for cable protection including taking out old broken bricks complete all as specified laid perpendicular to cable as per directed. 1334 Each
106 106 Supply, laying or passing through pipe LT, XLPE insulated, galvanised steel strip or wire armoured electric power cable (heavy duty) with stranded aluminium conductor 1100 Volts grade of size 50 Sqmm 3.5 core including connecting/testing after taking out from trenches/ pole unserviceable LT UG cable complete all as specified and directed. 50 Running Metre
107 107 All as per item No 106 above but of size 35 Sqmm 3.5 core. 40 Running Metre
108 108 All as per item No 106 above but of size 16 Sqmm 4 core. 60 Running Metre
109 109 All as per item No 106 above but of size 10 Sqmm 4 core. 100 Running Metre
110 110 Material and Labour for 40 mm dia galvanized iron tube light grade for cable protection, supporting to poles, plinth protections, road crossing, trenches, footpath etc including clamps, nut, bolt and washers etc after taking out unserviceable pipe complete all as specified and directed. 40 Running Metre
111 111 All as per item Serial No 110 above but for 80 mm dia pipe. 20 Running Metre
112 112 Supply & Fix in repairs MCCB 4 pole 415 Volts adjustable type of capacity 63 Amps, 10 KA breaking capacity fixed properly at directed location and connecting/testing complete all as specified and directed. \nMake: Cat part No IHLE1ABF0063 of Havells or Equivalent in L&T / Legrand. 2 Each
113 113 All as per Item No 112 here-in-before but of capacity 100 Amps.\nMake: Cat part No IHLE1ABF0100# of Havells or Equivalent in L&T / Legrand. 2 Each
114 114 Supply & Fix in repairs MCCB 4 pole 415 Volts adjustable type of capacity 125 Amps, 25 KA breaking capacity fixed properly at directed location and connecting/testing complete all as directed. \nMake: Cat part No IHLASF00125# of Havells or Equivalent in L&T / Legrand. 1 Each
115 115 All as per Item No 114 here-in-before but of capacity 200 Amps adjustable type, 25 KA breaking capacity.\nMake: Cat part No IHLANDCF0200# of Havells or Equivalent in L&T / Legrand. 2 Each
116 116 Supply and fixing shock treatment chart duly mounted on a wooden frame with 5mm thick glass as directed having front area 1.20 Square Metre complete all as specified and directed. 4 Each
117 117 Supply and fixing Cable jointing kit for 11 KV (Earthed) grade cable for straight through Heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 185 sqmm complete all as specified and directed. 2 Each
118 118 Supply and fix in repairs Copper Air termination rod 12 mm dia single pointed 300mm long along with base plate welded at bottom of termination rod, of size 10 cm long fabricated out of 32 x 6 mm thick Copper strip along with making 9mm dia for fixing in fastners complete all as specified. 6 Each
119 119 Supply and fix in repairs aluminium strip 25x3 mm with saddle and fixing screws etc for roof conductors and down conductors above ground level complete all as specified and directed. 30 Running Metre
120 120 Supply and fix in repairs GI Strip 32x6 mm with saddle and fixing screws etc from test terminal block to earth pit complete all as specified and directed. 20 Running Metre
121 121 Supply and fix in repairs Porcelain insulator of existing size for isolation of conductor from the building wall upto a height of G+8 floors by providing 15cm long fastners at every 16 cm distance in the wall complete all as specified and directed. 50 Each Job
122 122 Supply and fix in repairs LED Aviation light with enciosure of ABS material, 50 Hz, IP-40 complete all as specified and directed. \nMake: BGAV302LED of Bajaj or equivalent in Crompton/Havells/Philips 2 Each
123 123 Material and labour for general servicing of VCB of capacity 400 Amp by drawing out the VCB, removing the dust, general servicing of the mechanism such as lubricating and applying jelly, cleaning the insulators, providing new nuts and bolts etc and recaliberation of relay, remove moisture, replace unserviceable relay, batteries if any, for auxillary supply, re-installing the VCB in its original position, testing and commissioning etc complete all as specified and as directed. 1 Each Job
124 124 Material and labour for General maintenance /repair of 160 KVA transformers installed at ICGS Beypore and CGRA Kozhikode Sub Stations, including disconnecting the HT/LT cables, earth strips etc. from the transformer, draining the complete oil for removing sludge from the tank and removing the top cover, conservator, expulsion tank etc for detecting the leakage and repairing by welding, replacing all the gaskets & neoprene washers for leakage arresting, the HT /LT bushings if required, refill the oil, top up to required level without any extra cost, reassembling the transformer and testing etc complete all as specified and as directed. 2 Each Job
125 125 Dehydration / filtration of transformer oils of transformer/switch gears to achive die-electric strength not less than 40Kv for 1 miniute at 4mm gap as per relevent IS using portable filteration plant including testing of oil for die electric strength before and after filtration complete all as specified and directed. \n\nNote:- (i) Test results before and after filteration shall be submitted on completion in tripilicate. \n(ii) Necessary electricity for filtration plant shall be issued by department,required length of cable/switch etc shall be arranged by the contractor. 150 Litre
126 126 Supply and topping up new transformer oil into conservator tank/body tank of transformer using portable filtration plant and directected.\nNote:- (i) The transformer oil for topping up shall be with di electric strength more than 40kv for 1 miniute at 4mm gap.\n(ii) Oil shall be supplied at site in sealed barrel. 30 Litre
127 127 Supply and fix in repairs breather assembly suitable for out door type transformer including taking down u/s from the transformer complete all as specified. 2 Each
128 128 Supply and filling silica gel inside breather assembly of transformer complete all as specified and directed. 1 Kilogram
129 129 Supply and fix danger notice plate of 1.6 mm thick mild steel sheet, vitreous enamelled white with letters figures and conventional skull and bones in signal red clour and fixed with MS clamps bolts ans nuts of approved size for HT 25x20 cm size complete all as specified and directed. 4 Each
130 130 Supply and fix in repairs LED Street light fitting 24 Watt made of pressure die cast aluminium housing with high power LED as lighting source and lens embeded PC cover having top opening separate driver compartment with IP66 protection complete all as specified and as directed. \nMake:Cat No CLLC-SL-55-24 of CELS or equivalent in Havells/Philips/Crompton Greaves. 7 Each
131 131 Supply and fix in repairs LED Flood/ Focus light fitting 50 Watt made of pressure die cast aluminium housing with high power LED as lighting source and lens embeded PC cover having top opening separate driver compartment with IP65 protection complete all as specified and as directed. \nMake:Cat No CLLC-FL-50 of CELS or equivalent in Havells/Philips/Crompton Greaves. 4 Each
132 132 Cleaning and preparation of old painted surface of steel pole 9 mtr long excluding planting depth complete and painting with one coat of aluminium paint and making black and white strips with synthetic enamel paint 30 cm height, each alternative strips ,up to 1.5 mtr height and writing pole Nos and applying one coat of cement base paint on PCC coping complete all as specified and as directed. 17 Each Job
133 133 Cleaning and preparation of old painted surface of LT PCC pole 9 mtr long excluding planting depth complete painting with one coat of aluminium paint to all steel structure such as channel, cross arms , bracings, bracket, clamps, street light fitting anti climbing device including making black & white strips with synthetic enameled paint 30 cm height each alternative strips, upto 1.5 mtr height and writing pole Nos and applying one coat of cement base paint on PCC coping where provided complete all as specified and as directed. 9 Each Job
134 134 Taking out unserrviceable earthing completely and providing Earthing complete with Galvanized steel earth plate electrode of size 600mmX600mm, 6.00 mm thick buried directly in ground vertically to a depth not less than 2.25 metres below the normal ground level with top edge of the plate not less than 1.5m below normal GL and connected to galvanized earth Lead wire 4.0mm dia by means of bolts, nuts, check nuts and washers of galvanized iron steel all as shown in Electrical Plate No.3 connected to earthing test point, including necessary earth work in any type of soil, PCC earth chamber made in PCC 1:3:6 type C1 (using 20mm graded aggregate), common salt, charcoal, CI funnel, earth pit cover in RCC 1:2:4 type B1 (using 20mm graded aggregates), with 8mm CTD bars @ 100mm c/c in both ways, including necessary form work complete including necessry test on completion all as specified and as directed. \nNote : The unit rate shall also include for excavation, earth work in hard/dense soil PCC (1:3:6) type C1 pit, RCC cover slab, GI funnel with 40 mm dia watering pipe, wire mesh, 50mm dia light grade GI protection pipe for earth lead etc., complete. 4 Each Set
135 135 Material and Labour for general servicing of Diesel Engine of DG set including greasing, lubrication, calibratiuon of PT pump etc of DG sets of capacity of 50 KVA, after replacement of unservicable parts including necessary lathe work fixing, testing the DG set on full load all as directed \nNote:\n(a) All T&P items should be brought at site by the contractor.\n(b) Grease,lubrication are to be measure in general servicing charges of DG set and no extra cost will be paid by Deptt to the contractor.\n(c) Parts to be replaced shall be measured and paid separately. The makes of spares shall be of respective DG set manufacturer and as approved by Engineer in charge conforming to the OEM machine.\n(d) The rate quoted shall be excluding servicing of alternator & selt starter which shall be measured and paid separately under relevent items here-in-after. 2 Each Job
136 136 Material and Labour for general servicing of Diesel Engine of DG set including greasing, lubrication, calibratiuon of PT pump etc of DG sets of capacity of 62.5 KVA, after replacement of unservicable parts including necessary lathe work fixing, testing the DG set on full load all as directed \nNote:\n(a) All T&P items should be brought at site by the contractor.\n(b) Grease,lubrication are to be measure in general servicing charges of DG set and no extra cost will be paid by Deptt to the contractor.\n(c) Parts to be replaced shall be measured and paid separately. The makes of spares shall be of respective DG set manufacturer and as approved by Engineer in charge conforming to the OEM machine.\n(d) The rate quoted shall be excluding servicing of alternator & selt starter which shall be measured and paid separately under relevent items here-in-after. 1 Each Job
137 137 Supply only cup injector suitable for DG set 50 KVA complete all as specified and as directed . 4 Each
138 138 Supply only injector spring suitable for DG set 50 KVA complete all as specified and as directed . 4 Each
139 139 Supply only seal 'O' ring suitable for DG set 50 KVA complete all as specified and as directed . 4 Each
140 140 Supply only Barrel and Plunger suitable for DG set 50 KVA complete all as specified and as directed . 4 Each
141 141 Supply only Seat injector suitable for DG set 50 KVA complete all as specified and as directed . 4 Each
142 142 Supply only Valve intake suitable for DG set 50 KVA complete all as specified and as directed . 5 Each
143 143 Supply only Valve Exhaust suitable for DG set 50 KVA complete all as specified and as directed . 5 Each
144 144 Supply only Tube water transfer for DG set 50 KVA complete all as specified and as directed . 2 Each
145 145 Supply only Gasket exhaust manifold complete all as specified and as directed . 2 Each
146 146 Supply only Governer weight for DG set 50 KVA complete all as specified and as directed . 2 Each
147 147 Supply only Carrier weight for DG set 50 KVA complete all as specified and as directed . 2 Each
148 148 Supply only Pin pivot for DG set 50 KVA complete all as specified and as directed . 2 Each
149 149 Supply only generator battery lead set for DG set complete all as specified and as directed . 6 Each
150 150 Supply only Grease of standard make complete all as specified and directed. 5 Kilogram
151 151 Supply only Lubricating oil (10W40) complete all as specified and directed. \nMake : Castrol/Hindustan Petroleum/Indian oil 40 Litre
152 152 Supply only Coolant. \nMake : Castrol/Hindustan Petroleum/Indian oil 4 Litre
153 153 Dismantling the alternator of 50 KVA DG Set from its position from the foundation after disconnection of electric connection with the help of chain pully, removing the bearing with the help of bearing pullar and shifting the alternator to authorised workshop for repair and servicing complete checking of connections , terminals, lugs tightning of connections replacement of bushes complete and refixing again after in original position and proper alingment complete all as specified and directed. 2 Each Job
154 154 Dismantling the alternator of 62.5 KVA DG Set from its position from the foundation after disconnection of electric connection with the help of chain pully, removing the bearing with the help of bearing pullar and shifting the alternator to authorised workshop for repair and servicing complete checking of connections , terminals, lugs tightning of connections replacement of bushes complete and refixing again after in original position and proper alingment complete all as specified and directed. 1 Each Job
155 155 Dismantling old unservicable Air cleaner elements and supply and fixing new Air cleaner elements inner and outer including dust cap suitable for 50 KVA DG Set complete all as specified and as directed . 2 Each Set
156 156 Dismantling old unservicable Air cleaner elements and supply and fixing new Air cleaner elements inner and outer including dust cap suitable for 62.5 KVA DG Set complete all as specified and as directed . 1 Each Set
157 157 Disconnecting and dismounting the self starter 12 Volts of 50 KVA DG Set from the engine transporting it to workshop for further dismantling for repair reassembling after repair/replacement of unservicable parts, transporting back the self from workshop to E/M installation fixing with the DG set, testing complete all as specified and directed. 2 Each
158 158 Supply and fixing in repairs Heavy duty Acid lead battery 12 volt, capacity of 180 Ah for DG set 160 KVA complete all as specified and directed. \nMake: Battery Model No FXP0-XP1800 of EXIDE or Equivalent in Luminous/Amron. 1 Each
159 159 Disconnecting existing PVC water tank not exceeding 250 Ltrs capacity and Cleaning water tank with wire brush, cloth, bleaching powder, removing dirt, scale from the tank and from mouths of circulating pipes etc through drain pipe or by manually all as specified and directed by Engineer-in-Charge (Tank shall be cleaned quarterly and writing with white paint over black base on the tank as "TANK CLEANED ON" with date with 5 cm high letters/ numbers and reconnecting and refixing in the same position after cleaning and testing for leakages of service tanks complete all as specified and directed. 2 Each
160 160 All as per item No. 159 above but exceeding 250 but not exceeding 500 Ltrs capacity. 20 Each
161 161 All as per item No. 159 above but exceeding 500 but not exceeding 1000 Ltrs capacity. 6 Each
162 162 All as per item No. 159 above but exceeding 1000 but not exceeding 2000 Ltrs capacity. 12 Each
163 163 Taking down existing unserviceable water tank after disconnecting water supply line and supply and fix new Rotational moulded polyethylene water storage tanks having capacity 500 Ltrs (cylindrical vertical with closed top) hoisted and fixed in position all as specified and directed. 3 Each
164 164 All as per item No. 163 above but 1000 Ltrs capacity. 2 Each
165 165 All as per item No. 163 here-in-before but 2000 Ltrs capacity. 2 Each
166 166 Supply and fix in repairs Gun-metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed 25 mm bore complete all as specified and directed. 30 Each
167 167 All as per item No. 166 here-in-before but 40 mm bore 25 Each
168 168 All as per item No. 166 here-in-before but 50 mm bore 10 Each
169 169 Taking out old unserviceable Foot valve and supply and fixing new CI Foot valve 100mm dia approved make including jointing complete all as specified and directed at site of the following sizes:- 2 Each
170 170 All as per item No. 169 here-in-before but 80mm dia 2 Each
171 171 Supplying and laying 25mm outer dia CPVC pipes SDR 11 & Plain CPVC SDR 11 fittings fixed complete to walls or in floors etc. after taking out unserviceable pipe complete all as specified and directed. 25 Running Metre
172 172 Supply and fixing in repairs CI sluice valve both end flanged, gun metal spindle, iron wheel head including jointing, size of Sluice Valve Class PN 1.6 , 100 mm dia approved make complete all as specified and directed. 2 Each
173 173 All as per item No. 172 above but 80 mm dia. 1 Each
174 175 Supply and fixing galvanised steel water tubing medium grade 25 mm bore including all necessary fittings laid in trenches including inter connection between buildings/pumps/pump houses, including taking out unserviceable tubing complete complete all as specified and as directed.\nNOTE: Earth work and excavtion shall be measured and paid separately. 6 Running Metre
175 176 All as per item No. 175 above but 40mm bore. 6 Running Metre
176 177 All as per item No. 175 above but 50mm bore. 6 Running Metre
177 178 All as per item No. 175 above but 80mm bore. 6 Running Metre
178 179 Supply and fixing galvanised steel water tubing medium grade 25 mm bore including all necessary fittings, fixed to walls and ceilings including interconnection between buildings/pumps/pump houses including taking out unserviceable tubing complete complete all as specified and as directed. 12 Running Metre
179 180 All as per item No. 179 here-in-before but 40mm bore. 12 Running Metre
180 181 All as per item No. 179 here-in-before but 50mm bore. 6 Running Metre
181 182 Material and labour for Cleaning of underground reservoir by closing of all valves in distribution and dewatering of complete tank and cleaning with wire brush, cloth, bleaching powder, removing dirt, scale from the tank and from mouths of circulating pipes etc through drain pipe or by manually, and washing of inner surface using lime and bleaching powder and removing the same until clean surface is obtained, all as specified and directed by Engineer-in-Charge (Tank shall be cleaned yearly and writing with white paint over black base on the tank as "TANK CLEANED ON" with date with 5 cm high letters/ numbers and connecting all connections after cleaning and testing for leakages of tank of capacity 75000 Ltrs complete all as directed. \nNote: Tank shall be cleaned yearly as directed by Engineer-in-Charge. 1 Each Job
182 183 All as per item No. 182 above but UG sump capcity of 50,000 litres. 2 Each Job
183 184 Material and labour for Cleaning of Above ground reservoir by closing of all valves in distribution and dewatering of complete tank and cleaning with wire brush, cloth, bleaching powder, removing dirt, scale from the tank and from mouths of circulating pipes etc through drain pipe or by manually, and washing of inner surface using lime and bleaching powder and removing the same until clean surface is obtained, all as specified and directed by Engineer-in-Charge (Tank shall be cleaned yearly and writing with white paint over black base on the tank as "TANK CLEANED ON" with date with 5 cm high letters/ numbers and connecting all connections after cleaning and testing for leakages of tank of capacity 50000 Ltrs complete all as directed. \nNote: Tank shall be cleaned yearly as directed by Engineer-in-Charge. 2 Each Job
184 185 Material and labour for Cleaning of rain water sand filter tank of 50,000 Ltrs capacity by removing the sediments and old sand & aggregated from inside the tank, refill the sand and aggregates after sun drying to required level and adding additional sand and aggregates to the fillter tank if required including washing the tank using bleaching powder, removing sludge from tank until a clean bottom surface obtained and writing the capacity of sump and date of cleaning with synthetic enamel paint complete all as specified and as directed. 1 Each Job
185 186 Disconnecting existing water/electric connections, dismantling unservicable electric Motor pump set having capacity 40 HP 3 Phase, opening carefully, taking out old burnt windings, cleaning of solts of motor stater and rotor complete, rewinding the same with super enamelled winding wire of existing gauge/size as per exisitng pattern with proper insulating material apply two coats of varnish and heating of windings reassemble the motor with proper sealing, including necessary lathe work to made the pump high efficiency, etc. refixing the same location, including necessary plumbing work, etc., testing and commissioning of motor pump set on full load to the entire satifcation of the Engineer-in-Charge. 1 Each job
186 187 All as per item No. 186 above but having capacity 20HP. 2 Each job
187 188 All as per item No. 186 above but having capacity 5/7.5HP. 2 Each job
188 189 All as per item No. 186 above but having capacity 3HP. 2 Each job
189 190 All as per item No. 186 above but having capacity 1.5/2HP. 1 Each job
190 191 Material and Labour for general servicing of Electrical Driven main pump of 40HP capacity including cleaning, greasing, checking alignments, meggaring, with and including replacing gland, packing, capacitors, terminal blocks etc complete all as specified and as directed.\nNote : The servicing shall be carried out once in a month.\n 22 Each Job
191 192 Material and Labour for general servicing of Electrical Driven main pump of 20HP capacity including cleaning, greasing, checking alignments, meggaring, with and including replacing gland, packing, capacitors, terminal blocks etc complete all as specified and as directed.\nNote : The servicing shall be carried out once in a month. \n 44 Each Job
192 193 Material and Labour for general servicing of Electrical Driven main pump of 5 to 7.5 HP capacity including cleaning, greasing, checking alignments, meggaring, with and including replacing gland, packing, capacitors, terminal blocks etc complete all as specified and as directed.\nNote : The servicing shall be carried out once in a month. \n 44 Each Job
193 194 Material and Labour for general servicing of Electrical Driven main pump of 0.5 to 3 HP capacity including cleaning, greasing, checking alignments, meggaring, with and including replacing gland, packing, capacitors, terminal blocks etc complete all as specified and as directed.\nNote : The servicing shall be carried out once in a month. \n 55 Each Job
194 195 Supply and fix in repairs DOL Starter having capacity 3 HP 415 volt, 3 phase relay max range 9-15 Amps complete all as specified and directed. 2 Each
195 196 Supply and fix in repairs DOL Starter having capacity 7.5 HP 415 volt, 3 phase relay max range 9-15 Amps complete all as specified and directed. 2 Each
196 197 Supply and fix in repairs Star delta starter including all accessories suitable for 20 HP Pump set 415 volt, 3 phase relay max range 9-15 Amps complete all as specified and directed. 2 Each
197 198 Cleaning the vegetation including grass, bushes, small trees & all vegetation growth complete incl digging out roots of bushes around installation/Sump/OH tanks/ valve chamber including leveling the surface by removing debris to a distance n.exc 50 mtr all as directed. 60 Square Metre
198 199 Supply only alum crystal complete all as specified. 10 Kilogram
199 200 Material and labour for General servicing of solar water heater, 100-300 ltrs capacity by checking functioning of thermostate, safety valve, indicator lamp, electric connection, water flow etc and replace the unserviceable parts if necessary and keep the geyser in serviceable condition complete all as specified.\nNote : The cost of labour and consumables required for replacement of parts shall deem to include in the unit rate quoted by the contractor. 3 Each
200 201 Schedule of Credit (Minus) Rs. 76,908.00 \nNOTE: Bidder shall insert credit amount of Rs. 76,908.00 as rate in Green field under Col-13. 1 Each
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail