}

Up Keeping Of Control Room, Control Equipment Room, Das Room, Ppts, Boiler And Turbine Side Field Equipments (Including Cpp, Mix Bed Wtp, Regeneration Room Of Cpp) Of Unit 4&5, Btps, Anpara., Anpara-Uttar Pradesh

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited has published Up Keeping Of Control Room, Control Equipment Room, Das Room, Ppts, Boiler And Turbine Side Field Equipments (Including Cpp, Mix Bed Wtp, Regeneration Room Of Cpp) Of Unit 4&5, Btps, Anpara.. Submission Date for this Tender is 08-10-2020. Housekeeping Services Tenders in Anpara Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

25378995
Up Keeping Of Control Room, Control Equipment Room, Das Room, Ppts, Boiler And Turbine Side Field Equipments (Including Cpp, Mix Bed Wtp, Regeneration Room Of Cpp) Of Unit 4&5, Btps, Anpara.
Tender
Indian
Uttar Pradesh
Anpara
08-10-2020

Tender Details

Up Keeping Of Control Room, Control Equipment Room, Das Room, Ppts, Boiler And Turbine Side Field Equipments ( Including Cpp, Mix Bed Wtp, Regeneration Room Of Cpp ) Of Unit 4&5, Btps, Anpara. - 1.01 Dailyremoval Of Dust Particles By Thorough Cleaning & Mopping From Out Side Of The Following Panels & Control Equipments Installed In Unit Control Room No. 4&5 Btps. A. Unit Control Desks. B. Unit Control Panels. C. Water Quality Monitoring Panels. D. Electrical Protection Relay Panels. E. Fire System Panels. F. Soot Blower Panels, Apc Printers. G. Vibration Monitoring System Console. H. Apc Operator Station / Key Board. 365.00 1.02 Alternate Day Removal Of Dust Particles By Thorough Cleaning & Mopping From Out Side Of The Following Control Panels & Equipments Installed In Control Equipment Room & Apc Operator Station Room Of Unit No. 4&5 Btps. A. Apc Cabinets. B. Bms Cabinets With Rc Feeder, Flame Scanner & Mft Cabinets. C. Vibration Monitoring Panels. D. Bfp Control & Measurement Cabinets. E. Bsq Panels. F. Boiler & Turbine Interlock Relay Panels. G. Main Turbine Dehc Cabinets. H. Tsi Cabinets. I. On-Line Vibration Monitoring Panels. J. Turbine Measurement Cabinet. K. Tsq Panels. L. Boiler Annunciation Aux. Cabinets. M. Turbine Annunciation Aux. Cabinets. N. Tlc Power Electronic Control Cabinets. O. Tlc Tosmap Panels. P. Annunciation Cabinets. Q. Electronics Master Clock Cabinets. R. Inverter Cabinets Of Apc Operator Station. S. Max_1 Control Station Equipments. T. Bfp-T-Ehg Maintenance Tool ( Computer ) . U. Rms Maintenance Facility Console ( Computer ) 183.00 1.03 Weekly Removal Of Dust Particles By Thorough Cleaning & Mopping From Out Side Of The Following Local Control Panels / Cabinets, Junction Boxes & Control Equipments Mounted At Side / Field On Turbine Side Including Cpp Mixed Beds Of Both Unit No. 4&5 Btps. A. Blps Of Bfp – 6 Nos. B. Bfp Gauge Panels – 8 Nos. C. Bfp Local Control Panels – 2 Nos. D. T-Bfp Test Panels – 2 Nos. E. Oil Tank Gauge Panels Of Bfp & Mot.-5 Nos. F. Debris Filter Control Panels – 2 Nos. G. Condenser Tube Cleaning Control Panels-2Nos H. Turbine Local Monitoring Panels – 2 Nos. I. Turbine Local Panels – 93 Nos. J. Turbine Marshalling Board Panels – 12 Nos. K. Local Junction Boxes & Terminal Boxes. L. Field Equipments & Local Panels Of Regeneration System Of Cpp & Wtp 52.00 1.04 Twice A Day Cleaning And Mopping Of Pvc Tile’S Floors Of Unit Control Room, Control Equipment Room. Apc Operator Room Of Unit No. 4&5 Btps Including Analyzer Rooms And Sample Water Table Room Of Units ( Total Floor Area About 600 Sq. Meter. ) 730.00 1.05 Weekly Proper Cleaning Of Dust, Dirt And Webs From Side Walls, False Ceiling, Door, Windows And Ventilators Of These Rooms ( Total Side Walls False Ceiling Etc. Area About 1350 Sq. Meter ) . 52.00 1.06 Alternate Day Removal Of Dust Particles By Cleaning & Mopping From Outside The Cabinets / Panels Inside Telephone Exchange Room ( Shb Ground Floor ) . 183.00 1.07 Removal Of Dust Particles By Cleaning & Mopping From Out Side The Following Panels / Equipments Inside Intrasite Communication Equipment Room ( +7M ) . A. P&P Master Equipment Panel 0.6X1.8X2.4 M B. P&P Master Panels – 2 Sets 0.6X1.8X2.4 M. Each C. Ups Panel 0.8X1.8X2.4 Meters. 52.00 1.08 Cleaning And Mopping Of Pvc / Tiled Floors Of Room At Sl.No. 1 To 6 Above, 03 Nos. C&I Lab Rooms & One No., C&I Spares Parts Room Including Cleaning Of Jalas From Walls And False Ceiling & Cleaning Of Glass Panels Of Windows Ventilators Doors So As To Provide Dust Free Atmosphere Inside Various Rooms Total Floors Area 670 Sq. Mtr. Of Unit 4&5 Btps 52.00 1.09 Removal Of Dust Particles By Cleaning & Mopping Room Out Side The Following Das Cabinets Of Unit 4 & 5: - A ) Each Das Room Consists Of Das Input Termination Cabinets. B ) Das Main Cabinets. C ) Das Power Distribution Board Cabinet. D ) Programmers Console & Printer With Crt Desk Etc. E ) Crts And Panels Etc. In Shift Engineer’S Room. 365.00 1.10 Unit Control Room, Cer, Apc Operator Station Room Floor Of Unit #4&5 ( Approx. Area 607 M² / Unit. ) 730.00 1.11 C&I Operating Staff Room And Site Store 21 M Floor ( 03 Rooms ) 365.00 1.12 Removal Of Dust Particles By Cleaning & Mopping From Outside The Following Computer System ( Service House Building ) Aes Room ( A ) Computer Desk, Console, Key Board ( B ) Main Cpu Cabinet Etc. 183.00 1.13 Removal Of Dust Particles By Cleaning & Mopping From Inside & Out Side The Computer Cabinets ( 14 Nos. ) , Apc Cabinets ( 02 Nos. ) Program Instructor Console ( 06 Nos. ) , Printer, 09 Nos., Hard Copiers ( 02 Nos. ) Field Terminal Device ( 01 Nos. ) Fire Protection And Alarm Panels ( 01 No ) Power Distribution Board Panels ( 01 No ) Relay Panel ( 01 No ) Ucp One Set Of 04 Nos., Vcd One Set Of 04 Nos. ) Station Control Panels ( One Set Of 03 Nos. ) Various Instruments Mentioned There And All Other Left Over Equipment Inside Computer Room, Simulator Room And Instructor Console Room. 183.00 1.14 Cleaning And Mopping Of Pvc Tiled Jack Floor Of Simulator Room, Computer Room And Instructor Console Room Including Cleaning Of Wall, False Ceiling And Windows Ventilators And Partition Walls Etc. So As To Provide Best Cleaned Dust Free Atmosphere For Continuous Working Of Sophisticated Electronics / Computer Equipments. 52.00 2.00 Part B 2.01 16 Nos. Of Oil Firing Control System Instrumentation ( Igniters, Oil Gun Solenoids And Associated Equipments ) 52.00 2.02 6 Nos. Of Firing Station Valves. 12.00 2.03 ( A ) Coal Mill Control System ( Bunker Feeder Outlet Ball Filling Gates Inlet & Bypass Air Damper ) - 32 Nos ( B ) Cold Hot Air Damper-16 Nos ( C ) Pc Pipe Mill Outlet Gates.- 32 Nos. ( D ) Cold & Hot Air Pneumatic Shutoff Gates & Air Filter And Pressure Regulator Metallic Pipe Connection Limit Switches Power Cylinder And Air Lines.- 16 Nos 52.00 2.04 Instruments Panels Related To Coal Mills Delta P Measurement System Noise Level System. Oil Station Gauges And Switches And Switch Boards.- 8 Nos. 104.00 2.05 Secondary Air Control Damper Along With Associated Regulator Filters Etc.- 68 Nos. 52.00 2.06 Other Electrically, Pneumatically Operated Control Valves And Dampers.- 128 Nos 52.00 2.07 Soot Blowers Panels. 52.00 2.08 Gates Valves, Dampers, Pbs, Jbs Etc. 24.00 2.09 Hp Bypass Station And Field Panel. 24.00 2.10 Control Panels In Ucr, Cer Of Unit #4&5. Approx. Area 950 M². 52.00 2.11 Other Local Control Panel Bjbs, Bmbs, Mmbs, Blps Etc. 52.00 2.12 Side Walls And Ceilings Of Ucr, Cer & Apc Operator Station Room Of #4&5 Approx. Area 1350 M². 12.00 2.13 Semi Transparent Light Diffuser Sheet Of Ucr, Cer, Apc Operator Station ( 450 Nos. ) 6.00 2.14 Removal Of Dust Particles By Cleaning & Mopping From Outside The Following Ups Cabinets Of Unit 4 & 5. Each Ups Room Cabinets: - ( A ) Das Ups Cabinets: 04 Nos. ( B ) Boiler Ups Cabinets: 04 Nos. ( C ) Turbine Ups Cabinets: 04 Nos 52.00 2.15 Removals Of Dust Particles By Cleaning & Mopping From Outside The Panels / Equipments Inside Cw Pump House Das Room Inside Ht Switch Gear. 52.00 2.16 Cleaning And Washing On Both Sides Of 160 Nos. Acrylic Covers Of Flush Type Tube Light Fittings Installed In Various Rooms At Sl. No. 1 To 6, C&I Lab ( 21 M ) And C&I Spare Parts Room, So As Give Clear Visibility. The Cleaning Is To Be Done Very Carefully So As To Avoid Damage Of Acrylic Covers. 12.00 2.17 Cleaning And Mopping Of Both Sides Of 351 Nos. Acrylic Sheets Each Of Size 0.6X0.6 Sq. Meter Installed In Simulator Room. The Cleaning Is To Be Done Very Carefully So As To Avoid Damage Of Acrylic Sheets And Covers. 12.00 2.18 Cleaning And Washing On Both Sides Of Acrylic Sheets Of Each Size 0.6X0.6 Sq. Meter Installed In Ucb No. 4&5 Btps, So As To Give Clear Visibility Inside Control Room ( 331 Nos. ) 12

Key Value

Document Fees
INR 590 /-
EMD
INR 14000.0 /-
Tender Value
INR 6.99 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail