| 1 | 1 | Removal of Mill rejection, coal dust, debris, earth etc. and Disposal of Stone Boulders & Assorted refuses at BTPS. | | | |
|---|
| 2 | 1.01 | Supply of unskilled workman (17 nos. Listed) for carriage & removal of Coal, mill rejects, boulders, coal-reject boulders, stone metals, stone chips, gravels, stone coals, slag metal, shingles, cinder, stone, brick bats, debris, garbage, rubbish mixed earth, minor scrap materials including iron scrap, accumulated ash etc. into trucks from different lifting points & unloading at disposal points and also for shifting of boulders from bottom of different conveyor belts and to attend odd jobs when required as per direction of E. I. C. Loading at first point and unloading at site manually.\nCategory I.\nNote: - i) In case of enjoying C. L (Max. 14 days), this rate will be reduced by Rs. 75. 37 per day for each worker. Mandays means physical attendance & CL if any. ii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates.\nCategory I.\nIncluding profit on basic and including supply/ hire charges of necessary tools & tackles.\n | 1 | 9991 | Manday |
|---|
| 3 | 1.02 | Provision of overtime for emergency works against engagement of worker. Category I | 2 | 9624 | Hours |
|---|
| 4 | 1.03 | Cost of Listed Holidays including PF & Bonus (considering Max.\n14 mandays/ year/ head) Category I.\n | 3 | 469 | Manday |
|---|
| 5 | 1.04 | House rent allowance for 17 nos workmen. This allowance @ 20 % of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month. Category I | 4 | 401 | Months |
|---|
| 6 | 1.05 | Statutory component (ESI, PF, Bonus) against workman. Category I | 5 | 9991 | Manday |
|---|
| 7 | 1.06 | Supply of unskilled workman (11 nos. Listed) for carriage & removal of Coal, mill rejects, boulders, coal-reject boulders, stone metals, stone chips, gravels, stone coals, slag metal, shingles, cinder, stone, brick bats, debris, garbage, rubbish mixed earth, minor scrap materials including iron scrap, accumulated ash etc. into trucks from different lifting points & unloading at disposal points and also for shifting of boulders from bottom of different conveyor belts and to attend odd jobs when required as per direction of E. I. C. Loading at first point and unloading at site manually.\nCategory II.\nNote: - i) In case of enjoying C. L (Max. 14 days), this rate will be reduced by Rs. 75. 37 per day for each worker. Mandays means physical attendance & CL if any. ii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates.\nCategory II.\nIncluding profit on basic and including supply/ hire charges of necessary tools & tackles.\n | 6 | 6055 | Months |
|---|
| 8 | 1.07 | Provision of overtime for emergency works against workman. Category II | 7 | 5832 | Hours |
|---|
| 9 | 1.08 | Cost of Listed Holidays including PF & Bonus (considering Max. 14 mandays/year/head) Category II | 8 | 285 | Manday |
|---|
| 10 | 1.09 | House rent allowance for 11 nos worker. This allowance @ 20 % of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month. Category II | 9 | 243 | Months |
|---|
| 11 | 1.1 | Statutory component (ESI, PF, Bonus) against worker. Category II | 10 | 6055 | Manday |
|---|
| 12 | 1.11 | Supply of unskilled workman (01 no. Listed) for carriage & removal of Coal, mill rejects, boulders, coal-reject boulders, stone metals, stone chips, gravels, stone coals, slag metal, shingles, cinder, stone, brick bats, debris, garbage, rubbish mixed earth, minor scrap materials including iron scrap, accumulated ash etc. into trucks from different lifting points & unloading at disposal points and also for shifting of boulders from bottom of different conveyor belts and to attend odd jobs when required as per direction of E. I. C. Loading at first point and unloading at site manually.\nCategory III.\nNote: - i) In case of enjoying C. L (Max. 14 days), this rate will be reduced by Rs. 75. 37 per day for each worker. Mandays means physical attendance & CL if any. ii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates.\nCategory III.\nIncluding profit on basic and including supply/ hire charges of necessary tools & tackles.\n | 11 | 374 | Manday |
|---|
| 13 | 1.12 | Provision of overtime for emergency works against worker. Category III | 12 | 360 | Hours |
|---|
| 14 | 1.13 | Cost of Listed Holidays including PF & Bonus (considering Max. 14 mandays/year/head) Category III | 13 | 19 | Manday |
|---|
| 15 | 1.14 | House rent allowance for 01 nos worker. This allowance @ 20 % of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month. Category III\n | 14 | 15 | Months |
|---|
| 16 | 1.15 | Statutory component (ESI, PF, Bonus) against worker. Category III | 15 | 374 | Manday |
|---|
| 17 | 1.16 | Supply of unskilled workman (01 no. Listed) for carriage & removal of Coal, mill rejects, boulders, coal-reject boulders, stone metals, stone chips, gravels, stone coals, slag metal, shingles, cinder, stone, brick bats, debris, garbage, rubbish mixed earth, minor scrap materials including iron scrap, accumulated ash etc. into trucks from different lifting points & unloading at disposal points and also for shifting of boulders from bottom of different conveyor belts and to attend odd jobs when required as per direction of E. I. C. Loading at first point and unloading at site manually.\nCategory IV.\nNote: - i) In case of enjoying C. L (Max. 14 days), this rate will be reduced by Rs. 75. 37 per day for each worker. Mandays means physical attendance & CL if any. ii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates. Category IV.\nIncluding profit on basic and including supply/ hire charges of necessary tools & tackles. \n\n | 16 | 598 | Manday |
|---|
| 18 | 1.17 | Provision of overtime for emergency works against worker. Category - IV | 17 | 576 | Hours |
|---|
| 19 | 1.18 | Cost of Listed Holidays including PF & Bonus (considering Max. 14 mandays/year/head) Category IV | 18 | 28 | Manday |
|---|
| 20 | 1.19 | House rent allowance for 01 no worker. This allowance @ 20 % of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month. Category IV | 19 | 24 | Months |
|---|
| 21 | 1.2 | Statutory component (ESI, PF, Bonus) against worker. Category IV | 20 | 598 | Manday |
|---|
| 22 | 1.21 | Supply of unskilled workman (01 no. Listed) for carriage & removal of Coal, mill rejects, boulders, coal-reject boulders, stone metals, stone chips, gravels, stone coals, slag metal, shingles, cinder, stone, brick bats, debris, garbage, rubbish mixed earth, minor scrap materials including iron scrap, accumulated ash etc. into trucks from different lifting points & unloading at disposal points and also for shifting of boulders from bottom of different conveyor belts and to attend odd jobs when required as per direction of E. I. C. Loading at first point and unloading at site manually.\nCategory V.\nNote: - i) In case of enjoying C. L (Max. 14 days), this rate will be reduced by Rs. 75. 37 per day for each worker. Mandays means physical attendance & CL if any. ii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates.\nCategory V.\nIncluding profit on basic and including supply/ hire charges of necessary tools & tackles.\n | 21 | 598 | Manday |
|---|
| 23 | 1.22 | Provision of overtime for emergency works against engagement of worker. Category V | 22 | 576 | Hours |
|---|
| 24 | 1.23 | Cost of Listed Holidays including PF & Bonus (considering Max. 14 mandays/year/head) Category V | 23 | 28 | Manday |
|---|
| 25 | 1.24 | House rent allowance for 1 no workmen. This allowance @ 20 % of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month. Category V | 24 | 24 | Months |
|---|
| 26 | 1.25 | Statutory component (ESI, PF, Bonus) against workman. Category V | 25 | 598 | Manday |
|---|
| 27 | 1.26 | Supply of unskilled workman (01 no. Listed) for carriage & removal of Coal, mill rejects, boulders, coal-reject boulders, stone metals, stone chips, gravels, stone coals, slag metal, shingles, cinder, stone, brick bats, debris, garbage, rubbish mixed earth, minor scrap materials including iron scrap, accumulated ash etc. into trucks from different lifting points & unloading at disposal points and also for shifting of boulders from bottom of different conveyor belts and to attend odd jobs when required as per direction of E. I. C. Loading at first point and unloading at site manually.\nCategory VI.\nNote: - i) In case of enjoying C. L (Max. 14 days), this rate will be reduced by Rs. 75. 37 per day for each worker. Mandays means physical attendance & CL if any. ii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates.\nCategory VI.\nIncluding profit on basic and including supply/ hire charges of necessary tools & tackles.\n | 26 | 598 | Manday |
|---|
| 28 | 1.27 | Provision of overtime for emergency works against engagement of worker. Category VI. | 27 | 576 | Hours |
|---|
| 29 | 1.28 | Cost of Listed Holidays including PF & Bonus (considering Max.14 mandays/year/head) Category VI | 28 | 28 | Manday |
|---|
| 30 | 1.29 | House rent allowance for 01 no workmen. This allowance @ 20% of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month. Category VI\n | 29 | 24 | Months |
|---|
| 31 | 1.3 | Statutory component (ESI, PF, Bonus) against workman. CategoryVI\n | 30 | 598 | Manday |
|---|
| 32 | 1.31 | Supply of unskilled workman (01 no. Listed) for carriage & removal of Coal, mill rejects, boulders, coal-reject boulders, stone metals, stone chips, gravels, stone coals, slag metal, shingles, cinder, stone, brick bats, debris, garbage, rubbish mixed earth, minor scrap materials including iron scrap, accumulated ash etc. into trucks from different lifting points & unloading at disposal points and also for shifting of boulders from bottom of different conveyor belts and to attend odd jobs when required as per direction of E. I. C. Loading at first point and unloading at site manually.\nCategory VII.\nNote: - i) In case of enjoying C. L (Max. 14 days), this rate will be reduced by Rs. 75. 37 per day for each worker. Mandays means physical attendance & CL if any. ii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates.\nCategory VII.\nIncluding profit on basic and including supply/ hire charges of necessary tools & tackles.\n | 31 | 598 | Manday |
|---|
| 33 | 1.32 | Provision of overtime for emergency works against engagement of worker. Category VII | 32 | 576 | Hours |
|---|
| 34 | 1.33 | Cost of Listed Holidays including PF & Bonus (considering Max.14 mandays/year/head) CategoryVII | 33 | 28 | Manday |
|---|
| 35 | 1.34 | House rent allowance for 01 no workmen. This allowance @ 20% of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month. Category VII | 34 | 24 | Months |
|---|
| 36 | 1.35 | Statutory component (ESI, PF, Bonus) against workman. CategoryVII | 35 | 598 | Manday |
|---|
| 37 | 1.36 | Supply of unskilled workman (01 no. Non-Listed) for carriage & removal of Coal, mill rejects, boulders, coal-reject boulders, stone metals, stone chips, gravels, stone coals, slag metal, shingles, cinder, stone, brick bats, debris, garbage, rubbish mixed earth, minor scrap materials including iron scrap, accumulated ash etc. into trucks from different lifting points & unloading at disposal points and also for shifting of boulders from bottom of different conveyor belts and to attend odd jobs when required as per direction of E. I. C. Loading at first point and unloading at site manually.\nCategory VIII.\nNote: - i) Mandays means physical attendance & CL if any. ii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates.\nCategory VIII.\nIncluding profit on basic and including supply/ hire charges of necessary tools & tackles.\n | 36 | 612 | Manday |
|---|
| 38 | 1.37 | Provision of overtime for emergency works against engagement of worker. Category VIII | 37 | 576 | Hours |
|---|
| 39 | 1.38 | Cost of Listed Holidays including PF & Bonus (considering Max.7 mandays in a year/head) Category VIII | 38 | 14 | Manday |
|---|
| 40 | 1.39 | House rent allowance for 01 no workmen. This allowance @ 19% of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month. Category VIII | 39 | 24 | Months |
|---|
| 41 | 1.4 | Statutory component (ESI, PF, Bonus) against workman. CategoryVIII | 40 | 612 | Manday |
|---|
| 42 | 1.41 | Welfare allowance for 33 Nos Listed workers. This allowance @400/- per month shall be paid to these workers subject to minimum 06 days work per month by the worker. Payment will be made accordingly by per head per month\n[Category-I, II, III, IV, V, VI, VII]\n | 41 | 755 | Months |
|---|
| 43 | 1.42 | Carriage of mill rejects, other debris like earth, brick bats, stone metals, stone chips, gravels, slag metal, shingles, stone etc. & similar miscellaneous materials, scrap mixed with iron scrap, rubbish, dry leaves, lopped tree branches, grasses, cinder, accumulated ash etc. from bottom ash hopper, coal mill area, ESP area, crusher house 8A-8B, 1A-1B, 11A-11B, guest house, cement go-down, Intake pump house and other different areas inside & outside of plant area and assorted other materials by trucks up to a distance of 5KM. within the plant area including loading in to the truck at the lifting point and unloading at destination (including dressing & carriage by head load 30 Mtr. at each of the two point and sprinkling water during loading, transit & unloading if required including tools & tackles and incidental charges all complete) dumping the same at low lying area of WBPCDL' s land completed as per direction of the EIC.\n(Measurement will be taken on truck or stack measurement /lorry & usual 1/8th shrinkage will be deducted). The contractor shall have to maintain at his own cost the temporary approach road to different points for plying trucks.\n\n | 42 | 30000 | Cubic Meter |
|---|
| 44 | 1.43 | Carriage & removal of Coal reject boulders & big coal from Wagon Tripler area to reject yard and coal yard respectively and coal form Coal Mill area to coal yard or any other area inside & outside of plant premises including tools & tackles and incidental charges all complete. Distance carried not exceeding 5 km.\n | 43 | 15000 | Tonne |
|---|
| 45 | 1.44 | Annual Cost of PPE(on reimbursement basis at actual) for 33 Nos Listed workers. For each worker; soap (06 nos per month), Duster (04nos per year), Helmet(01 no / 2 year), Safety shoe( BATA make, Model-ENDURA L/C, Model No. 825-6051) ( 01 No/2 years), Gumboot (01 pair / 2 year), Hand gloves (01 pair per month) , Nose guard (02 nos per month) to be supplied in consultation with Fire & Safety Deptt., HR & A Deptt., and Utilizer Deptt., BTPS. | 44 | 1 | Lumpsum |
|---|
| 46 | 1.45 | Annual Cost of PPE (on reimbursement basis at actual) for 01 No Non-Listed workers. For each worker; Helmet(01 no / 2 year), Safety shoe( BATA make, Model-ENDURA L/C, Model No. 825-6051) (01 No/2 years), Gumboot (01no. / 2 year), Hand gloves (01 pair per month) , Nose guard (02 nos per month) to be supplied in consultation with Fire & Safety Deptt., HR & A Deptt., and Utilizer Deptt., BTPS.\n | 45 | 1 | Lumpsum |
|---|
| 47 | 1.46 | Hire Charges of JCB on the basis of emergency requirement as per written instruction of EIC including driver & fuel charges all complete. | 46 | 160 | Hours |
|---|
| 48 | 1.47 | Provision of EL for 01 No Non-listed worker against Category VIII. | 47 | 30 | Manday |
|---|
| 49 | 1.48 | GST @ 18% SAC Code 995429 | 48 | 1 | Lumpsum |
|---|