| 1 | 1 | WOODEN FLOORING\nDismantling plank flooring. | BI01010001010000000000000515BI0100001113 | 496.28 | Sqm |
|---|
| 2 | 2 | Screed of 40mm thick cement concrete 1:8:16 to be laid below the topping. | BI01010001010000000000000515BI0100001114 | 496.28 | Sqm |
|---|
| 3 | 3 | Cement Concrete 1:2:4 with stone ballast or shingle. using Concrete mixer volumetric type. | BI01010001010000000000000515BI0100001115 | 17.39 | Cum |
|---|
| 4 | 4 | Supply and Installation of Synthetic PU flooring approved by International Basketball/Badminton/handball fedrations. Supply and Installation of one layer of Conipur 70 primer over concrete/bituminous surface @ 0.15 Kg/sqm. Supply and Installation of Conica Point Elastic PU flooring having thickness of 7mm SBR prefab rubber rolls followed by 2 mm PU coating. Supply and installation of one layer sealing coat with conipur 220 @ 750 gm/sqm over the SBR. Supply and installation of 2-3 mm Conipur 227 PU. Supply and Applying of Paint coat is Green and RAL. No. of this Colour is 6017. line marking as peu international norms | BI01010001010000000000000515BI0100001116 | 496.28 | Sqm |
|---|
| 5 | 5 | Credit of Old Material Teak Wood Members, Fuel Wood.. | BI01010001010000000000000515BI0100001117 | 98.46 | Qtl |
|---|
| 6 | 6 | Credit of Old Material Hor. Member of Salwood, Ver. Member of Salwood. | BI01010001010000000000000515BI0100001118 | 32.89 | Qtl |
|---|
| 7 | 7 | 20mm thick cement plaster 1:5 in two coat work | BI01010001010000000000000515BI0100001119 | 176.56 | Sqm |
|---|
| 8 | 8 | Scraping White wash and colour wash | BI01010001010000000000000515BI0100001120 | 3531.23 | Sqm |
|---|
| 9 | 9 | Preparation of plastered or concrete surface for painting (including sand papering the surface) using ready mixed cement based wall putty by applying two coats to get required finish. | BI01010001010000000000000515BI0100001121 | 3531.23 | Sqm |
|---|
| 10 | 10 | Distempering with Acrylic washable oil bound distemper (of approved manufacture) two coats over one priming coat to give an even shade. | BI01010001010000000000000515BI0100001122 | 3531.23 | Sqm |
|---|
| 11 | 11 | Painting two coats with synthetic enamel paints in all shades on old wood work or metallic or plastered or concrete surface to give an even shade including rubbing down old paint... With ordinary quality paint | BI01010001010000000000000515BI0100001123 | 565.43 | Sqm |
|---|
| 12 | 12 | Chowkats of commercial hard wood such as Hollock confirming to ISI specification no 1003 m kiln seasoned of doors and windows including iron hold fasts, corner straps cleats, stops, bolts for hold fasts etc, complete fixed in position Double Rebate (60mm x 150mm). | BI01010001010000000000000515BI0100001124 | 16.46 | Rmt |
|---|
| 13 | 13 | Chowkats of commercial hard wood such as Hollock confirming to ISI specification no 1003 m kiln seasoned of doors and windows including iron hold fasts, corner straps cleats, stops, bolts for hold fasts etc, complete fixed in position Single Rebate (60mm x 150mm). | BI01010001010000000000000515BI0100001125 | 10.36 | Rmt |
|---|
| 14 | 14 | Factory manufactured flush door fixed in position iron hinges, etc (excluding the cost of any fittings other than specified above but including labour for fixing the same in position (Code : II Revision IS-2191 Part-I) 1973 Commercial with elm or gurjan facing on both \ Sides with laminated core and lipped edges:-35 mm thick | BI01010001010000000000000515BI0100001126 | 9.6 | Sqm |
|---|
| 15 | 15 | Renewing glass panes with putty and nails wherever necessary :-- Glass panes weighing 10.75 kg/sqm | BI01010001010000000000000515BI0100001127 | 119.77 | Sqm |
|---|
| 16 | 16 | Supplying and fixing open able steel windows of standards rolled steel sections, joints mitred and electrically flash welded with iron fittings, necessary iron handles, peg stay, catchers bolts, iron lugs and pressed steel projected hinges and glazing clips and labour for fixing during masonry complete (excluding glazing) and finished with two coats of ready mixed paint, red lead non-setting primer Up to One sqm Area | BI01010001010000000000000515BI0100001128 | 275.4 | Kg |
|---|
| 17 | 17 | Dismantling wire gauge with frame work including separating frame work and putting wire gauge into rolls. | BI01010001010000000000000515BI0100001129 | 25.59 | Sqm |
|---|
| 18 | 18 | Providing and laying four courses of water proofing treatment with bitumen felt over roofs consisting of first and third courses of blown type bitumen grade 85/25 applied hot @1.20kg per sqm of area for each course, second course on roofing felt type 3 grade-I (Hessian base self finished bitumen felt) and fourth and final course of stone grit 6mm and down size or pea-sized grit spread at 0.006 cu.m per sq.m including preparation of surface complete. | BI01010001010000000000000515BI0100001130 | 332.92 | Sqm |
|---|
| 19 | 19 | Top khurra 0.6m x 0.6m for rain water pipe in 25mm thick cement concrete 1:2:4 over 50mm thick cement concrete 1:8:16. | BI01010001010000000000000515BI0100001131 | 14 | Each |
|---|
| 20 | 20 | Bottom Khurra on ground 1.2m x 0.6m consisting of brick on-edge laid in cement mortar 1:3 over 75mm cement concrete 1:8:16 including 12.5mm thick cement plaster 1:3 | BI01010001010000000000000515BI0100001132 | 4 | Each |
|---|