| 1 | 1 | Dismantling of following machinery items at Majohla Co-operative Sugar Factory ltd. Majhola, District- Pilibhit (U.P.) Consisting of following | item1 | 1 | 01 Job |
|---|
| 2 | 1.01 | M/s Triveni Make 550 mm model 1.5 mw capacity Power Turbine with all accessories like, Turbine operating panel, oil coolers, cooling water inlet & out let accessories. | | | |
|---|
| 3 | 1.02 | Inlet steam line from common steam Header of Boilers to inlet at turbine with all valve, steam filtering system, vertical support for steam line etc. | | | |
|---|
| 4 | 1.03 | Cooling water line from control valve in power house to inlet at oil coolers with catcher and strainer and valves etc. | | | |
|---|
| 5 | 1.04 | Turbine exhaust line from turbine end to connection at de-super Heating unit with expansion below and spring loaded safety valve, Main valve and outgoing exhaust line with valve and structure for resting the exhaust line etc. | | | |
|---|
| 6 | 1.05 | M/s Jyoti Make 1875 KVA Capacity Power Alternator with exciter unit complete in all respect. | | | |
|---|
| 7 | 1.06 | Power Alternator excitation Panel and AVR Panel complete is all respect. | | | |
|---|
| 8 | 1.07 | Bus bar from power alternator to main panel in all respect. | | | |
|---|
| 9 | 1.08 | Power alternator water Radiator with accessories. | | | |
|---|
| 10 | 1.09 | Main ACB 3200 Amp Capacity from power panel | | | |
|---|
| 11 | 1.1 | Other Accessories of turbo generating set. | | | |
|---|
| 12 | 2 | Shifting of above 2 items in power house of Morna Sugar mills Ltd. Morna (Muzaffarnagar) | item2 | 1 | 01 Job |
|---|
| 13 | 3 | Erection and commissioning of following machinery items in Power House of Morna Sugar Mill. Consisting of following | item3 | 1 | 01 Job |
|---|
| 14 | 3.01 | Erection, Alignment and commissioning of M/s Triveni Make 550 MM model 1.5 MW capacity power turbine along with oil coolers, control panel etc. in all respect. | | | |
|---|
| 15 | 3.02 | Inlet steam line from common steam Header to Inlet of Power Turbine as per IBR specification including valves, drains and supporting structure etc. | | | |
|---|
| 16 | 3.03 | Provision of cooling water system with catcher and strainer for oil coolers. | | | |
|---|
| 17 | 3.04 | Filling, erection and commissioning of cooler water return line from coiler cooler ends to service water tank with supporting structure. | | | |
|---|
| 18 | 3.05 | Fitting, Erection and commissioning of exhaust steam line from turbine and to de-super heating unit with expansion below, main valve, safety valve, exhaust blowing line with valves, drain valve and drain line etc. | | | |
|---|
| 19 | 3.06 | Erection, align ment and commissioning of power alternator with de-exciter. | | | |
|---|
| 20 | 3.07 | Erection and commissioning of alternator excitation Panel and AVR Panel with Laying and fixing of cable and wiring. | | | |
|---|
| 21 | 3.08 | Fitting, Erection and commissioning of Bus bar conductor from power alternator to main Panel with accessories in all respect. | | | |
|---|
| 22 | 3.09 | Fitting, Erection and commissioning of alternator water radiator within coming water line with catcher and strainer and outgoing water line etc. complete in all respect. | | | |
|---|
| 23 | 3.1 | Fitting, Erection and commissioning of 3200 Amp capacity ACB in main panel with bus bar conductor etc. complete in all respect. | | | |
|---|