Bharat Coking Coal Limited-BCCL has published Hiring Of Hemm For Removal Of Ob , Extraction And Transportation Of Coal With Firefighting From Xiii , Xi/Xii , Viiic/Ix/X , Viiib , Viiia , Viii And V/Vi/Vii Seams Of New Benedih Patch Of Amalgamated Block Ii Ocp , Block Ii Area Of Bccl. Submission Date for this Tender is 21-08-2020. Explosives Tenders in CMC DEPARTMENT,BCCL HQ Jharkhand. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 06-Aug-2020 | Critical Date Extension Corrigendum | Date | 21-08-2020 |
2 | 06-Aug-2020 | Corrigendum | Other | 21-08-2020 |
Name of Work: | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically and disposed off outside the working zone/ surface OB dump/in the in-pit dump in proper manner including spreading, dozing, lighting, water sprinkling, grading, fire-fighting and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\n(Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.)\nRemoval and disposal of overburden also includes fire-fighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper fire-fighting at OB faces and OB dumps as per instructions/directions of Engineer In-charge.\nThe tenderer has to make arrangements of manpower and fire-fighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of OB, continuously spraying water over the blasted OB to quench fire etc.\nTenderer has to ensure that fire is absolutely quenched before loading of OB etc.\nCarriage Lead: (0-1) KM from face to surface/ in-pit OB dump.\n\n | ITEM 1 | 1.32174e+07 | Cum |
2 | 1.1 | Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically and disposed off outside the working zone/surface OB dump in proper manner including spreading, dozing, lighting, water sprinkling, grading, fire-fighting and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\n(Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.)\nRemoval and disposal of overburden also includes fire-fighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper fire-fighting at OB faces and OB dumps as per instructions/directions of Engineer In-charge.\nThe tenderer has to make arrangements of manpower and fire-fighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of OB, continuously spraying water over the blasted OB to quench fire etc. \nTenderer has to ensure that fire is absolutely quenched before loading of OB etc.\nCarriage Lead: (1-2) KM from face to surface OB dump.\n | ITEM 2 | 1.13545e+07 | Cum |
3 | 1.2 | Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically and disposed off outside the working zone/surface OB dump in proper manner including spreading, dozing, lighting, water sprinkling, grading fire-fighting and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.(Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.)\nRemoval and disposal of overburden also includes fire-fighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper fire-fighting at OB faces and OB dumps as per instructions/directions of Engineer In-charge.\nThe tenderer has to make arrangements of manpower and fire-fighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of OB, continuously spraying water over the blasted OB to quench fire etc. \nTenderer has to ensure that fire is absolutely quenched before loading of OB etc.\nCarriage Lead: (2-3) KM from face to surface OB dump.\n | ITEM 3 | 5.5191e+06 | Cum |
4 | 1.3 | Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically and disposed off outside the working zone in surface OB dump in proper manner including spreading, dozing, lighting, water sprinkling, grading fire-fighting and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\n(Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.)\nRemoval and disposal of overburden also includes fire-fighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper fire-fighting at OB faces and OB dumps as per instructions/directions of Engineer In-charge.\nThe tenderer has to make arrangements of manpower and fire-fighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of OB, continuously spraying water over the blasted OB to quench fire etc. \nTenderer has to ensure that fire is absolutely quenched before loading of OB etc.\nCarriage Lead: (3-4) KM from face to surface OB dump.\n | ITEM 4 | 585000 | Cum |
5 | 2 | Removal of dumped loose overburden by mechanical means in all kinds of soil, rock including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite/ stone boulders, soft or hard rock etc., removal of slushy earth, mud & slurry as required, loading, transporting & unloading the excavated materials mechanically and disposed offin the in-pit dump in proper manner on the dumping yard including spreading, dozing, lighting, water sprinkling, grading fire-fighting& other ancillary mining activities etc., all complete as per instructions/directions of Engineer- in charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete. Removal and disposal of overburden also includes fire-fighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper fire-fighting at OB faces and OB dumps as per instructions/directions of Engineer In-charge.\nThe tenderer has to make arrangements of manpower and fire-fighting including hoses to deal with fire during all operations such as digging and loading of OB, continuously spraying water over the blasted OB to quench fire etc.\nTenderer has to ensure that fire is absolutely quenched before loading of OB etc.\nCarriage Lead:(0-1) KM from face to in-pit OB dump.\n | ITEM 5 | 4.745e+06 | Cum |
6 | 2.1 | Removal of dumped loose overburden by mechanical means in all kinds of soil, rock including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite/ stone boulders, soft or hard rock etc., removal of slushy earth, mud & slurry as required, loading, transporting & unloading the excavated materials mechanically and disposed off outside the working zone in surface OB dump in proper manner on the dumping yard including spreading, dozing, lighting, water sprinkling, grading, fire-fighting& other ancillary mining activities etc., all complete as per instructions/directions of Engineer- in charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\nThe tenderer has to make arrangements of manpower and fire-fighting including hoses to deal with fire during all operations such as digging and loading of OB, continuously spraying water over the blasted OB to quench fire etc.\nTenderer has to ensure that fire is absolutely quenched before loading of OB etc.\nCarriage Lead:(1-2) KM from face to surfaceOB dump.\n | ITEM 6 | 1.824e+07 | Cum |
7 | 2.2 | Removal of dumped loose overburden by mechanical means in all kinds of soil, rock including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite/ stone boulders, soft or hard rock etc., removal of slushy earth, mud & slurry as required, loading, transporting & unloading the excavated materials mechanically and disposed off outside the working zone in surface OB dump in proper manner on the dumping yard including spreading, dozing, lighting, water sprinkling, grading, fire-fighting& other ancillary mining activities etc., all complete as per instructions/directions of Engineer- in charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\nThe tenderer has to make arrangements of manpower and fire-fighting including hoses to deal with fire during all operations such as digging and loading of OB, continuously spraying water over the blasted OB to quench fire etc.\nTenderer has to ensure that fire is absolutely quenched before loading of OB etc.\nCarriage Lead:(2-3) KM from face to surface OB dump.\n | ITEM 7 | 4.927e+06 | Cum |
8 | 3 | Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.) including mechanical loading of coal free from extraneous materials into tippers/ dumpers including removal of slushy earth / slurry and removal/ segregating/picking and removal of unwanted band stones/ extraneous materials, lighting, water sprinkling, dozing, grading, fire-fighting and other ancillary mining activities and transportation of coal from face to surface coal dump etc. complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal. \nExtraction and transportation of coal also includes fire-fighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at coal faces as per instructions/directions of Engineer In-charge. The tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of coal, continuously spraying water over the blasted coal to quench fire etc. Tenderer has to ensure that fire is absolutely quenched before transportation of coal from face and fire does not reappear subsequently. \nCarriage Lead: (0-1) KM from face to surface coal dump.\n | ITEM 8 | 190000 | MT |
9 | 3.1 | Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.) including mechanical loading of coal free from extraneous materials into tippers/ dumpers including removal of slushy earth / slurry and removal/ segregating/picking and removal of unwanted band stones/ extraneous materials, lighting, water sprinkling, dozing, grading and other ancillary mining activities and transportation of coal from face to surface coal dump etc. complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal. Extraction and transportation of coal also includes fire-fighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at coal faces as per instructions/directions of Engineer In-charge.The tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of coal, continuously spraying water over the blasted coal to quench fire etc.Tenderer has to ensure that fire is absolutely quenched before transportation of coal from face and fire does not reappear subsequently. \n\nCarriage Lead: (1-2) KM from face to surface coal dump.\n | ITEM 9 | 406000 | MT |
10 | 3.2 | Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.) including mechanical loading of coal free from extraneous materials into tippers/ dumpers including removal of slushy earth / slurry and removal/ segregating/picking and removal of unwanted band stones/ extraneous materials, lighting, water sprinkling, dozing, grading and other ancillary mining activities and transportation of coal from face to surface coal dump etc. complete job as per instructions/directions of Engineer-in-charge.The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal. Extraction and transportation of coal also includes fire-fighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at coal faces as per instructions/directions of Engineer In-charge. The tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of coal, continuously spraying water over the blasted coal to quench fire etc. Tenderer has to ensure that fire is absolutely quenched before transportation of coal from face and fire does not reappear subsequently. \n\nCarriage Lead: (2-3) KM from face to surface coal dump.\n\n | ITEM 10 | 200000 | MT |
11 | 3.3 | Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.) including mechanical loading of coal free from extraneous materials into tippers/ dumpers including removal of slushy earth / slurry and removal/ segregating/picking and removal of unwanted band stones/ extraneous materials, lighting, water sprinkling, dozing, grading and other ancillary mining activities and transportation of coal from face to surface coal dump etc. complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal.\nExtraction and transportation of coal also includes fire-fighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at coal faces as per instructions/directions of Engineer In-charge. The tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of coal, continuously spraying water over the blasted coal to quench fire etc. Tenderer has to ensure that fire is absolutely quenched before transportation of coal from face and fire does not reappear subsequently. \n\nCarriage Lead: (3-4) KM from face to surface coal dump.\n | ITEM 11 | 104000 | MT |
12 | 3.4 | Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.) including mechanical loading of coal free from extraneous materials into tippers/ dumpers including removal of slushy earth / slurry and removal/ segregating/picking and removal of unwanted band stones/ extraneous materials, lighting, water sprinkling, dozing, grading and other ancillary mining activities and transportation of coal from face to Old Madhuban Washery raw coal hopper including weighment at weighbridge (at NKSSY dump more), complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal.Extraction and transportation of coal also includes fire-fighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at coal faces as per instructions/directions of Engineer In-charge. The tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of coal, continuously spraying water over the blasted coal to quench fire etc.Tenderer has to ensure that fire is absolutely quenched before transportation of coal from face and fire does not reappear subsequently. \n\nCarriage Lead: (3-4) KM from face to Old Madhuban Washery raw coal hopper including weighment at weighbridge (at NKSSY dump more).\n | ITEM 12 | 1.44e+06 | MT |
13 | 3.5 | Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.) including mechanical loading of coal free from extraneous materials into tippers/ dumpers including removal of slushy earth / slurry and removal/ segregating/picking and removal of unwanted band stones/ extraneous materials, lighting, water sprinkling, dozing, grading and other ancillary mining activities and transportation of coal from face to Old Madhuban Washery raw coal hopper including weighment at weighbridge (at NKSSY dump more), complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal.\nExtraction and transportation of coal also includes fire-fighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at coal faces as per instructions/directions of Engineer In-charge.\nThe tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of coal, continuously spraying water over the blasted coal to quench fire etc.Tenderer has to ensure that fire is absolutely quenched before transportation of coal from face and fire does not reappear subsequently. \n\nCarriage Lead: (4-5) KM from face to Old Madhuban Washery raw coal hopper including weighment at weighbridge (at NKSSY dump more).\n\n | ITEM 13 | 300000 | MT |
14 | 3.6 | Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.) including mechanical loading of coal free from extraneous materials into tippers/ dumpers including removal of slushy earth / slurry and removal/ segregating/picking and removal of unwanted band stones/ extraneous materials, lighting, water sprinkling, dozing, grading and other ancillary mining activities and transportation of coalfrom face to New Madhuban Washery raw coal hopper including weighment at weighbridge (at New Madhuban Coal washery) through mobile crusher etc. complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal.Extraction and transportation of coal also includes fire-fighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at coal faces as per instructions/directions of Engineer In-charge. The tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of coal, continuously spraying water over the blasted coal to quench fire etc.Tenderer has to ensure that fire is absolutely quenched before transportation of coal from face and fire does not reappear subsequently.\nCarriage Lead: (4-5) KM from face to New Madhuban Washery raw coal hopper including weighment at weighbridge (at New Madhuban Coal washery) through mobile crusher etc. | ITEM 14 | 832000 | MT |
15 | 3.7 | Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.) including mechanical loading of coal free from extraneous materials into tippers/ dumpers including removal of slushy earth / slurry and removal/ segregating/picking and removal of unwanted band stones/ extraneous materials, lighting, water sprinkling, dozing, grading and other ancillary mining activities and transportation of coal from face to New Madhuban Washery raw coal hopper including weighment at weighbridge (at New Madhuban Coal washery) through mobile crusher etc. complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal.Extraction and transportation of coal also includes fire-fighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at coal faces as per instructions/directions of Engineer In-charge. The tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of coal,continuously spraying water over the blasted coal to quench fire etc.Tenderer has to ensure that fire is absolutely quenched before transportation of coal from face and fire does not reappear subsequently. \n\nCarriage Lead: (5-6) KM from face to New Madhuban Washery raw coal hopper including weighment at weighbridge (at New Madhuban Coal washery) through mobile crusher etc.\n | ITEM 15 | 9.036e+06 | MT |
16 | 3.8 | Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.) including mechanical loading of coal free from extraneous materials into tippers/ dumpers including removal of slushy earth / slurry and removal/ segregating/picking and removal of unwanted band stones/ extraneous materials, lighting, water sprinkling, dozing, grading and other ancillary mining activities and transportation of coal from face to New Madhuban Washery raw coal hopper including weighment at weighbridge (at New Madhuban Coal washery) through mobile crusher etc. complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal.\nExtraction and transportation of coal also includes fire-fighting for which the tenderer has to provide adequate number of pumps of suitable capacity including electricals along with M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at coal faces as per instructions/directions of Engineer In-charge. \nThe tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of coal, continuously spraying water over the blasted coal to quench fire etc. \nTenderer has to ensure that fire is absolutely quenched before transportation of coal from face and fire does not reappear subsequently. \n\nCarriage Lead: (6-7) KM from face to New Madhuban Washery raw coal hooper including weighment at weighbridge (at New Madhuban Coal washery) through mobile crusher etc.\n | ITEM 16 | 3.132e+06 | MT |
17 | 4 | Crushing of coal to (-) 200mm Size (all dimensions) by electrically operated mobile crusher with spreader including feeding of coal into mobile crusher. The elements include providing & installing suitable & matching mobile crushing arrangement as per NIT requirement with all infrastructures including operation, repair & maintenance of crushing arrangement (Electricity will be supplied free of cost by BCCL) etc. complete job as per instructions/ directions of Engineer-in-charge. | ITEM 17 | 1.3e+07 | MT |
18 | 5 | Loading of coal in to Tipper/Dumper from stock pile at discharge end of mobile crusher by pay loader including cost of all materials, labor and ancillary works etc. complete job as per instructions/directions of Engineer-in-charge. | ITEM 18 | 1.3e+07 | MT |
19 | 6 | Drilling in Coal and OB by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil or hard rock, coal etc. water sprinkling, dozing and other ancillary mining activities etc. all complete. Tenderer has to make all necessary arrangement also for firefighting as per instruction of Engineer-in-charge. | ITEM 19 | 3.4035e+06 | Mtr |
20 | 7 | Total impact of GST for the purpose of CTC | ITEM 20 | 1 | Nos |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy