Routine , Breakdown Preventive Mtc . And Overhauling Jobs Of Various Mechanical Auxiliaries Comprising Of Hydrogen Gas Plant , Dm Plant , Fire Fighting System , Vertical And Horizontal Pumps , Air Compressors , Etc . , Connected Lp Piping Valve, Superintending Engineer, MM-1 Circle, GHTP-Punjab

Punjab State Power Corporation Limited-PSTCL has published Routine , Breakdown Preventive Mtc . And Overhauling Jobs Of Various Mechanical Auxiliaries Comprising Of Hydrogen Gas Plant , Dm Plant , Fire Fighting System , Vertical And Horizontal Pumps , Air Compressors , Etc . , Connected Lp Piping Valve. Submission Date for this Tender is 17-08-2020. Fire Fighting Consumable Tenders in Superintending Engineer, MM-1 Circle, GHTP Punjab. Bidders can get complete Tender details and download the document.




Tender Notice

24916257
Routine , Breakdown Preventive Mtc . And Overhauling Jobs Of Various Mechanical Auxiliaries Comprising Of Hydrogen Gas Plant , Dm Plant , Fire Fighting System , Vertical And Horizontal Pumps , Air Compressors , Etc . , Connected Lp Piping Valve
Open Tender
Indian
Punjab
Superintending Engineer, MM-1 Circle, GHTP
17-08-2020

Tender Details

Routine , Breakdown Preventive Mtc . And Overhauling Jobs Of Various Mechanical Auxiliaries Comprising Of Hydrogen Gas Plant , Dm Plant , Fire Fighting System , Vertical And Horizontal Pumps , Air Compressors , Etc . , Connected Lp Piping Valves , Operation Maintenance Of Mechanical Workshop And Plant Drainage Pumps Of Ghtp Stage-I And Ii , On Lump Sum Basis For A Period Of One Year .

Key Value

Document Fees
INR 2360 /-
EMD
INR 274000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Routine maintenance, breakdown mtc., preventive mtc. and overhauling jobs of various mechanical auxiliaries such as Hydrogen gas Plant, DM plant, Water based fire fighting system complete with fire fighting pumps, Air compressors, Self Cleaning Filter’s of ACW, Plate Heat Exchangers of DM Cooling Water, Raw water pumps, Service water pumps, APH wash pumps, Sludge disposal pumps, Re-claimation pumps, Chemical dozing pumps, Acid/Alkali handling pumps, Potable water pumps and Misc. Horizontal/Vertical/ Submersible sump pumps. Various pumps & auxiliaries installed at Hydrogen gas plant, Pre-treatment plant, Water Clarification plant, Effluent treatment plant, Ash water recovery system, Raw water Chlorination & CW Chlorination system. Concerned EOT/HOT cranes/hoists. All connected LP piping, NRVs & valves etc. including LP piping, NRVs & valves etc. before suction & after discharge valve of CW, BACW, TACW, Hot well make up, Stator water make up, Boiler fill, ACW, SGDMCW, TGDMCW and TG cycle make up pumps. Operation and maintenance of mechanical workshop & Plant drainage sump pumps installed at Sump Pump No. 1&2, of 2x210 MW Stage-I & 2x250 MW Stage-II, GHTP, Lehra-Mohabbat, on Lump-sum basis.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Routine maintenance, breakdown mtc., preventive mtc. and overhauling jobs of various mechanical auxiliaries such as Hydrogen gas Plant, DM plant, Water based fire fighting system complete with fire fighting pumps, Air compressors, Self Cleaning Filter’s of ACW, Plate Heat Exchangers of DM Cooling Water, Raw water pumps, Service water pumps, APH wash pumps, Sludge disposal pumps, Re-claimation pumps, Chemical dozing pumps, Acid/Alkali handling pumps, Potable water pumps and Misc. Horizontal/Vertical/ Submersible sump pumps. Various pumps & auxiliaries installed at Hydrogen gas plant, Pre-treatment plant, Water Clarification plant, Effluent treatment plant, Ash water recovery system, Raw water Chlorination & CW Chlorination system. Concerned EOT/HOT cranes/hoists. All connected LP piping, NRVs & valves etc. including LP piping, NRVs & valves etc. before suction & after discharge valve of CW, BACW, TACW, Hot well make up, Stator water make up, Boiler fill, ACW, SGDMCW, TGDMCW and TG cycle make up pumps. Operation and maintenance of mechanical workshop & Plant drainage sump pumps installed at Sump Pump No. 1&2, of 2x210 MW Stage-I & 2x250 MW Stage-II, GHTP, Lehra-Mohabbat, on Lump-sum basis.\n
2 1.01 On lump-sum basis at GHTP, Lehra Mohabbat as per scope of work , considering any one unit running and keeping balance three units available for running as and when required item1 8 Months
3 1.02 On lump-sum basis at GHTP, Lehra Mohabbat as per scope of work for running of all the four units item2 4 Months
4 2 Laying of MS ERW Pipes of following sizes: (Scope of work Section-VIII.E):-
5 3 Above ground
6 3.1 350NB item3 300 meters
7 3.2 300NB item4 400 meters
8 3.3 250NB item5 200 meters
9 3.4 200NB item6 400 meters
10 3.5 150NB item7 300 meters
11 3.6 100NB item8 100 meters
12 3.7 80NB item9 200 meters
13 3.8 50NB item10 100 meters
14 3.9 40NB item11 50 meters
15 4 Underground:
16 4.1 300NB item12 100 meters
17 4.2 250NB item13 100 meters
18 4.3 200NB item14 200 meters
19 4.4 150NB item15 200 meters
20 4.5 100NB item16 100 meters
21 4.6 80NB item17 100 meters
22 5 Deployment of manpower for unforeseen jobs (Scope of work Section-VIII.F):-
23 5.1 Fitter/welder item18 50 man-days
24 5.2 Turner/Machinist item19 60 man-days
25 5.3 Skilled worker item20 100 man-days
26 5.4 Un-Skilled worker item21 150 man-days
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail