| 1 | 1 | Descaling the condenser by recommended chemical cleaning agent by soaking method, disconnecting condenser from the system by taking out nuts bolts, studs 2 Nos valves and MS/GI pipe line from both sides cover, cleaning each tube with nylon brush, flushing with alkaline solution connecting back both side cover including replacing leather gasket 4 mm thick suitable for AC plants installed as indicated below :- | | | |
|---|
| 2 | 1.01 | (a) Condenser at OT MH | | 9 | Each |
|---|
| 3 | 1.02 | (b) Condenser at ICU MH | | 3 | Each |
|---|
| 4 | 1.03 | (c) Condenser at Maternity ward | | 3 | Each |
|---|
| 5 | 1.04 | (d) Condenser at Signal Center | | 3 | Each |
|---|
| 6 | 2 | Cleaning of Air cooled Condenser by recommended chemical cleaning agent and with high pressure water machine at following :-\n(a) Air cooled Condenser at Raina Auditorium\n | | 1 | Each |
|---|
| 7 | 2.01 | (b) Air cooled Condenser at Cold Storage MH | | 1 | Each |
|---|
| 8 | 3 | Descaling the Chiller by recommended chemical cleaning agent by soaking method, disconnecting condenser from the system by taking out nuts, bolts, studs 2 Nos valves and MS/GI pipe line from both sides cover, cleaning each tube with nylon brush, flushing with alkaline solution connecting back both side cover including replacing leather gasket 4 mm thick capacities of condensers suitable for AC plants installed as indicated below :- | | | |
|---|
| 9 | 3.01 | (a) Chiller at OT MH | | 3 | Each |
|---|
| 10 | 3.02 | (b) Chiller at ICU MH | | 3 | Each |
|---|
| 11 | 3.03 | (c) Chiller at Raina Auditorium | | 2 | Each |
|---|
| 12 | 4 | Descaling and cleaning of AHU by recommended chemical cleaning agent by soaking method, disconnecting condenser from the system by taking out nuts bolts, studs 2 Nos valves and MS/GI pipe line from both sides cover, cleaning each tube with nylon brush, flushing with alkaline solution connecting back both side cover including replacing leather gasket 4 mm thick suitable for AC plants installed as indicated below :- | | | |
|---|
| 13 | 4.01 | (a) AHU at OT MH | | 2 | Each |
|---|
| 14 | 4.02 | (b) AHU at ICU MH | | 1 | Each |
|---|
| 15 | 4.03 | (c) AHU at Raina Auditorium | | 2 | Each |
|---|
| 16 | 5 | Rewinding of electric motor and changing of bearings and other parts of motor and servicing of capacity 15 HP , 3 phase operating on 50 HZ 415 volt supply comprising following activities :- | | 1 | Each Job |
|---|
| 17 | 5.01 | (a) Disconnecting & removing the electric motor or mono block type pump motor of water pump/ Cooling tower from the installed position and loading / unloading transporting to contractor’s workshop for repairs | | | |
|---|
| 18 | 5.02 | (b) Dismantling existing burnt winding from the motor, preparing for rewinding complete with super enameled copper winding wire of existing gauge including all insulating materials such as insulation paper, sleeves, tape, varnish etc and painting with two coats of super enamel paint over a coat of primer and greasing of bearings. | | | |
|---|
| 19 | 5.03 | (c) Loading/unloading/transporting motor/pump set to the site, installing in position, alignment, electric connection, commissioning and testing in actual working condition for 8 hours continuously. | | | |
|---|
| 20 | 5.04 | (d) Motors shall be handed over during the currency of contract on as required basis. | | | |
|---|
| 21 | 6 | Description all as per item No 5.00 above but capacity of motor 5 to 10 HP. | | 2 | Each Job |
|---|
| 22 | 7 | Description all as per item No 5.00 above but capacity of motor 1 to 5 HP. | | 4 | Each Job |
|---|
| 23 | 8 | Removing the unserviceable impeller from pumpset /monoblock pump and Supply & fixing new cast iron impeller including water seal or gland packing, packing set, metalling, grinding/turning of pump shaft and Ball bearing of both ends of existing size for 15 HP capacity pump sets complete all as specified and as directed. | | 1 | Each job |
|---|
| 24 | 9 | Description all as per item No 8.00 above but for 5 to 10 HP capacity | | 1 | Each Job |
|---|
| 25 | 10 | Description all as per item No 8.00 above but for 1 to 5 HP capacity | | 2 | Each Job |
|---|
| 26 | 11 | Dismantling of worn out part of FRP cooling tower of AC Plants, cleaning of water tanks and body of cooling tower to make the cooling tower functional and serviceable in all respect including rectification of minor leakages from the cooling tower with M Seal/adhesive complete all as specified and directed by Eng-in-Charge | | 2 | Each Job |
|---|
| 27 | 12 | Supply & fix in replacement side cover jalli for cooling tower for any capacity as per existing size and pattern all as specified and directed by Engr-in-Charge | | 2 | Each Job |
|---|
| 28 | 13 | Supply & fix in replacement of sprinkler and other accessories like Aluminium distributor, PVC pipes, supporting fastener etc.of cooling tower complete as per existing make, type and design complete all as specified and directed by Engr-in-Charge for undermentioned cooling towers. | | | |
|---|
| 29 | 13.01 | (a) Cooling tower at OT MH | | 1 | Each Job |
|---|
| 30 | 13.02 | (b) Cooling tower at ICU MH | | 1 | Each Job |
|---|
| 31 | 13.03 | (c) Cooling tower at Maternity ward | | 1 | Each Job |
|---|
| 32 | 13.04 | (d) Cooling tower at Signal Center | | 1 | Each Job |
|---|
| 33 | 14 | Supply & fixing in replacement MS class \"B\" pipe line of size 100 mm bore including welding work in the duct for OT and Raina auditorium complete all as specified and directed by Engr-in-Charge. | | 10 | RM |
|---|
| 34 | 15 | Desciption all as per item No 14.00 above but 80mm dia pipe for OT, ICU & Raina Audi | | 10 | RM |
|---|
| 35 | 16 | Desciption all as per item No 14.00 above but 50mm dia pipe for Maternity, Signal & ICU | | 10 | RM |
|---|
| 36 | 17 | Supply & fix in replacement GI Pipe Medium grade of size 50 mm bore including fittings such as bend, Tee etc, work in the duct all as specicfied and directed by Engr-in-Charge. | | 10 | RM |
|---|
| 37 | 18 | Desciption all as per item No 17.00 above but 40mm dia pipe. | | 10 | RM |
|---|
| 38 | 19 | Desciption all as per item No 17.00 above but 25mm dia pipe. | | 10 | RM |
|---|
| 39 | 20 | Painting of all pipelines of AC plants by removing pealed old paint with scrapper painting two coat of synthetic enamel paint of Ist quality as per standred shade and colour complete all as approved and directed by Engr-in-Charge. | | 100 | RM |
|---|
| 40 | 21 | Supply and fix matalic viscos filter in replacement made out of GI wire mesh interspaced with two crimp layers and three flat layers and housed in 2\" deep metal frame efficiency 65% as per existing size and pattern AC Plant air handling unit Make - Athlete or equivelent | | 8 | Each |
|---|
| 41 | 22 | Supply & fix in replacement water pressure gauge 100mm dia range 0-100 Lbs/sqr inch complete all as specified and directed by Engr-in-Charge. Make- Fiebig or equivalent | | 5 | Each |
|---|
| 42 | 23 | Supply & fix in replacement water tempreture gauge range 0-50 degree centigrade complete all as specified and directed by Engr-in-Charge. Make- Fiebig or equivalent | | 5 | Each |
|---|
| 43 | 24 | Supply in fix in replacement chiller water temp sensor for AC Plants at OT,Raina Audi, ICU as per exisiting size and make complete all as specified and directed by Engr-in-Charge. Make- VOLTAS | | 2 | Each |
|---|
| 44 | 25 | S&F in replacement expansion valve suitable for following AC Plants all as specified and directed by Engr-in-Charge:- | | | |
|---|
| 45 | 25.01 | (a) OT MH 12 TR (one compressor) with gas R-22 Make: Danfoss/Sporlon | | 2 | Each |
|---|
| 46 | 25.02 | (b) ICU MH 12 TR (one compressor) with gas R-407 Make: Danfoss/Sporlon | | 1 | Each |
|---|
| 47 | 25.03 | (c) Maternity MH 5TR (one compressor) with gas Make: Danfoss/Sporlon | | 2 | Each |
|---|
| 48 | 25.04 | (d) Signal center 7.5 TR (one compressor) with gas Make: Danfoss/Sporlon | | 1 | Each |
|---|
| 49 | 25.05 | (e) Raina Auditorium 23 TR (one compressor) Make: Danfoss/Sporlon | | 1 | Each |
|---|
| 50 | 26 | S&F in replacement the top protector cover to the CT fan motor at the top of the cooling tower made of GI sheet 20 SWG, conical shape including iron flat of required size complete to protect the CT fan motor from rain water all as specified and directed by Engr-in-Charge. | | 4 | Each |
|---|
| 51 | 27 | S&F 3 way Modulating (motrised) valve suitable for following AC Plants as per existing size and type and making system functional by changing control wiring and control system all as specified and directed by Engr-in-Charge. Make - Honybell/Siemens | | | |
|---|
| 52 | 27.01 | (a) OT MH | | 1 | Each |
|---|
| 53 | 27.02 | (b) Raina Auditorium | | 1 | Each |
|---|
| 54 | 28 | Taking down old unserviceable air grills and supply and fixing new air gills made out of GI sheet as per existing size and pattern complete including nuts, bolts, clamps and MS frame made out of angle iron of required size damper for opening and closing of grills complete all as specified and directed by Engr-in-Charge, | | 5 | Each |
|---|
| 55 | 29 | Taking down old unserviceable pipe insulations and M&L insulation the pipe line with 25mm thick closed cell chemically cross linked fire retradant polyethylene foam instulation of density 30 Kg/Cum. The thermal conductivity of the material should not exceed 0.035 W/Mk at an average temp of 40 deg C, covered with aluminium faced complete application with rubber based adhesive pidilite SR 998 and 50 mm x 3 mm thick self adhesive tape on both longituddinal and traverse joints complete all as specified and directed by Engr-in-Charge | | 10 | Sqm |
|---|
| 56 | 30 | Taking down old unserviceable duct insulations and M&L insulation the Ducts with 13 mm thick closed cell chemically cross linked fire retradant polyethylene foam instulation of density 30 Kg/Cum. The thermal conductivity of the material should not exceed 0.035 W/Mk at an average temp of 40 deg C, covered with aluminium faced complete application with rubber based adhesive pidilite SR 998 and 50 mm x 3 mm thick self adhesive tape on both longituddinal and traverse joints complete all as specified and directed by Engr-in-Charge | | 10 | Sqm |
|---|
| 57 | 31 | Supply and Fix in replacement Butter Fly valve 100 mm dia. | | 1 | Each |
|---|
| 58 | 32 | Supply and Fix in replacement Butter Fly valve 80 mm dia. | | 1 | Each |
|---|
| 59 | 33 | Supply and Fix in replacement Butter Fly valve 50 mm dia. | | 2 | Each |
|---|
| 60 | 34 | Supply and Fix in replacement Y stainer of size 100 mm dia Make: Rapid strain/Emerald/Leader | | 2 | Each |
|---|
| 61 | 35 | Supply and Fix in replacement Y stainer of size 80 mm dia Make: Rapid strain/Emerald/Leader | | 1 | Each |
|---|
| 62 | 36 | Supply and Fix in replacement Y stainer of size 50 mm dia Make: Rapid strain/Emerald/Leader | | 1 | Each |
|---|
| 63 | 37 | Supply and Fix in replacement Gate valve brass of size 50 mm dia. | | 1 | Each |
|---|
| 64 | 38 | Supply and Fix in replacement Gate valve brass of size 40 mm dia. | | 1 | Each |
|---|
| 65 | 39 | Supply and Fix in replacement Gate valve brass of size 25 mm dia. | | 1 | Each |
|---|
| 66 | 40 | Supply and Fix in replacement Float valve of size 25 mm dia. | | 1 | Each |
|---|
| 67 | 41 | Supply and Fix in replacement Float valve of size 20 mm dia. | | 1 | Each |
|---|
| 68 | 42 | Supply & fix in replacement of V belts of following sizes: | | | |
|---|
| 69 | 42.01 | (a) B-87 | | 2 | Each |
|---|
| 70 | 42.02 | (b) B-90 | | 2 | Each |
|---|
| 71 | 42.03 | (c) B-81 | | 2 | Each |
|---|
| 72 | 42.04 | (d) B-82 | | 2 | Each |
|---|
| 73 | 42.05 | (e) A- 28 | | 2 | Each |
|---|
| 74 | 43 | Dismantling the rusted body of AHU of any capacity, blower motor, blower shaft , and other spares from AHU for repairing/ Over-hauling the Body of AHU by welding / blazing / fabrication and replacement of defective components to ensure the proper functioning of the AHU, Re-assemble after necessary repairs, Connecting, commissioning and testing complete all as specified and directed. NOTE:- (i) The AHU shall be got repaired / Overhauled from specialized Firm or Agency as approved by the Engineer-in Charge. (ii) Payment for replacement of parts/ components shall be made for separately as \"Supply only\" under relevant items of this schedule here-in-after. (iii) The contract shall be liable for 1 year free guarantee for the repaired/ overhauled units which shall commence from the certified date of completion. | | 4 | Each |
|---|
| 75 | 44 | Supply only the following material/spares/ components required for AHU / Blower shafts of AC Plants \nNote:- Fixing charges shall be deemed to be inclusive in the quoted rate against Serial item No. 43 here in before . | | | |
|---|
| 76 | 44.01 | (a) Galvanized steel sheet of 20 SWG | | 10 | Sqm |
|---|
| 77 | 44.02 | (b) Galvanized steel sheet of 22 SWG \n | | 10 | Sqm |
|---|
| 78 | 44.03 | (c) Galvanized steel sheet of 24 SWG \n | | 10 | Sqm |
|---|
| 79 | 44.04 | (d) Nut bolts & screws, | | 2 | Kg |
|---|
| 80 | 44.05 | (e) Angle iron of size 30x3 mm | | 2 | Kg |
|---|
| 81 | 44.06 | (f) Main bearing/ bushing cat part no.NUP208 E.TVP2-208 | | 2 | Each |
|---|
| 82 | 44.07 | (g Blower shaft bearing unit Cat Part No. UCP 208-24 | | 2 | Each |
|---|
| 83 | 44.08 | (h) Motor Shaft V-Belt Pully with two groove 4\" dia | | 2 | Each |
|---|
| 84 | 44.09 | (i) Blower Shaft V-Belt Pully with two groove 4\" dia | | 2 | Each |
|---|
| 85 | 44.1 | (j) Motor Shaft V-Belt Pully with two groove 6\" dia | | 2 | Each |
|---|
| 86 | 44.11 | (k) Blower Shaft V-Belt Pully with two groove 6\" dia | | 2 | Each |
|---|
| 87 | 44.12 | (l) Motor Shaft V-Belt Pully with two groove 12\" dia | | 2 | Each |
|---|
| 88 | 44.13 | (m) Blower Shaft V-Belt Pully with two groove 12\" dia | | 2 | Each |
|---|
| 89 | 44.14 | (n) Copper Tubing 5/8\" | | 8 | RM |
|---|
| 90 | 44.15 | (o) Copper Tubing 3/4\" | | 8 | RM |
|---|
| 91 | 44.16 | (p) Copper Tubing 1/2\" | | 7 | RM |
|---|
| 92 | 44.17 | (q) Copper Tubing 1/4\" | | 6 | RM |
|---|
| 93 | 44.18 | (r) Flair Nut 5/8\" | | 4 | Each |
|---|
| 94 | 44.19 | (s) Flair Nut 3/4\" | | 4 | Each |
|---|
| 95 | 44.2 | (t) Flair Nut 1/2\" | | 4 | Each |
|---|
| 96 | 44.21 | (u) Flair Nut 1/4\" | | 4 | Each |
|---|
| 97 | 45 | Disconnecting from mains and Taking out existing unserviceable scroll compressor unit from the Air Conditioner Plant of Cap 12.5 TR and Supply , Installing and testing of company made new Scroll Type compressor Model No. SZ 185S4RC Lubricant P.O.E 160 SZ suitable for Refrigerent 407C. Initially charging of Gas 407 and commisioning all as directed by Engg-in-Charge. Make - Danfoss (ICU AC Plant)\n | | 1 | Each Job |
|---|
| 98 | 46 | Supply and fix in replacement the following spares / componants required for AC Plants LT Electric pannel/control system :-. | | | |
|---|
| 99 | 46.01 | (a)MCCB of capacity 32 Amp 25 KA ( 4P) and protection form short circuit and overload. | | 2 | Each |
|---|
| 100 | 46.02 | (b) Voltmeter Digital type suitable for 0-500 volts. | | 5 | Each |
|---|
| 101 | 46.03 | (c) Ammeter Digital type suitable for 0-15 Amps. | | 5 | Each |
|---|
| 102 | 46.04 | (d) Indicator bulbs Red,Blue and yellow Phases. | | 5 | Each |
|---|
| 103 | 46.05 | (e) Selector switch 5 Amp Red,Blue and yellow Phases. | | 5 | Each |
|---|
| 104 | 46.06 | (f) On, Off switch to start and stop the motors (Set of Two) | | 5 | Set |
|---|
| 105 | 46.07 | (g) Contactor 3TS47 AC 1-100A AC3 415 V 50Hz 30 KW / 40 HP Raina Audi)\n | | 1 | Each |
|---|
| 106 | 46.08 | (h) MNO 22E (2NO.+2NC 230 V)\nMake -L&T | | 2 | Each |
|---|
| 107 | 46.09 | (i) 25A MNX Contactor coil 230 V(2No.+2NC) \nMake -L& T | | 2 | Each |
|---|
| 108 | 46.1 | (j) 32A MNX Contactor coil 230 V(2No.+2NC) \nMake -L& T | | 2 | Each |
|---|
| 109 | 46.11 | (k) Timer ETR 550 220 Volt \nMake -L&T | | 2 | Each |
|---|
| 110 | 46.12 | (l) Over load relay MN 9-15A\n Make- L&T | | 1 | Each |
|---|
| 111 | 46.13 | (m) Over load relay MN 14-23A \nMake -L&T | | 1 | Each |
|---|
| 112 | 46.14 | (n) Over load relay MN 6-10A\n Make- L&T | | 1 | Each |
|---|
| 113 | 46.15 | (o) Add on Aux Contact block 2NO.+2NC \nMake- L&T | | 3 | Each |
|---|
| 114 | 47 | Supply & charging of refrigerant gas R-22 in central/package type AC plants after detection & rectification of any leakage in the system by using CO2 gas and flushing the complete system thoroughly with Nitrogen gas including testing and commissioning complete all as directed. Make: Mefron/Refron/Floron\nNote: (i) Gas to be brought by contractor at site from authorised dealer/manufracturer in company sealed cylinder\n(ii) The unit rate quoted is inclusive of cost of Nitrogen gas & CO2 gas required for leakage test & pressure test. | | 150 | Kg |
|---|
| 115 | 48 | Description all as per item no. 47.00 above but R-407 gas. | | 141 | Kg |
|---|
| 116 | 49 | Description all as per item no. 47.00 above but R-404 gas. | | 15 | Kg |
|---|
| 117 | 50 | M&L in replacement of liquid line drier filter for following capacity of AC plant as per existing size make: Danfoss/Syenergy :- | | | |
|---|
| 118 | 50.01 | (a) Raina Auditorium AC plant for 23 TR Compressor | | 1 | Each |
|---|
| 119 | 50.02 | (b) OT MH AC plant for 12.5 TR Compressor | | 1 | Each |
|---|
| 120 | 50.03 | (c) ICU MH AC plant for 12.5 TR Compressor | | 1 | Each |
|---|
| 121 | 50.04 | (d) Maternity MH AC plant for 5 TR Compressor | | 1 | Each |
|---|
| 122 | 50.05 | (e) Signal Center AC plant for 7.5 TR Compressor | | 1 | Each |
|---|
| 123 | 51 | M&L in replacement of liquid line ON/OFF valve for following capacity of AC plant as per existing size make: Danfoss/Syenergy :- | | | |
|---|
| 124 | 51.01 | (a) Raina Auditorium AC plant for 23 TR Compressor | | 1 | Each |
|---|
| 125 | 51.02 | (b) OT MH AC plant for 12.5 TR Compressor | | 1 | Each |
|---|
| 126 | 51.03 | (c) ICU MH AC plant for 12.5 TR Compressor | | 1 | Each |
|---|
| 127 | 51.04 | (d) Maternity MH AC plant for 5 TR Compressor | | 1 | Each |
|---|
| 128 | 51.05 | (e) Signal Center AC plant for 7.5 TR Compressor | | 1 | Each |
|---|
| 129 | 52 | Supply and fix in replacement of PVC pipe 1.5\" for drainage of water from AC plant | | 35 | RM |
|---|
| 130 | 53 | Repair/General servicing of three phase Servo Voltage Stablizer including dismentalling of the AVR, disconnection from AC supply, draining of transformer oil, lifting of AVR from oil tank with the help of chain pulley block and tripod and checking of any fault in the AVR assembly. Replacement of defective parts if any such as electronic control card for voltage regulation , Carbon Brushes , indicator , RC net work, Micro switch, Voltmeters , Rubber gasket & packing whereever required, oven baking of series transformers including re-varnishing & re-taping, Series transformer coil, , General servicing of AVR including cleaning of all contacts tightening of all nuts and bolts, thimbles, all inter connections, making adjustment of Electronic control circuits, indicators, output adjustment potentio meter, voltmeter etc. Filling and top up of transformer oil after dehyderation and filltering of old and used transformer oil at site and testing of AVR for satisfactory operation as required installed at AC plants as per detail given below:-\n | | | |
|---|
| 131 | 53.01 | (i) 50 KVA Three Phase (ICU & Maternity MH) | | 1 | Each Job |
|---|
| 132 | 53.02 | (ii) 30 KVA Three Phase (Signal Center) | | 1 | Each Job |
|---|
| 133 | 53.03 | (iii) 25 KVA Three Phase (Cold Storage) | | 1 | Each Job |
|---|
| 134 | 54 | Supply only the following spares / componants required for replacement of defective spare parts of the Voltage stabilizer/AVR.\nNote:-Fixing charges shall be deemed to be inclusive in the quoted rate against Serial item No 53 here in before.\n | | | |
|---|
| 135 | 54.01 | (a) Carbon Brushes | | 6 | Each |
|---|
| 136 | 54.02 | (b) Electronic Control Card for voltage regulation | | 6 | Each |
|---|
| 137 | 54.03 | (c) Auto variable transformer Coils | | 6 | Each |
|---|
| 138 | 54.04 | (d) Indicator bulbs Red,Blue and Green Phases. | | 10 | Each |
|---|
| 139 | 54.05 | (e) Rubber Gaskets & packings. | | 4 | Each |
|---|
| 140 | 54.06 | (f) Servo Motors | | 4 | Set |
|---|
| 141 | 54.07 | (g) Voltmeter suitable for 0-500 volts 96x96 sqmm. Make- AE or equivelent | | 5 | Each |
|---|
| 142 | 55 | Supply only Transformer oil for Voltage stabiliser installed at AC Plants\nNote :- Transformer oil should be brought by the contractor in sealed barrel procured from the authorised dealer and produced the test certificate. | | 30 | Ltr |
|---|
| 143 | 56 | Taking down old earthing complete and M & L earthing complete with galvanized steel earth plate electrode 60cm x 60cm x 6 mm thick burried directly in ground vertically to a depth not less than 2.25 mtr deep below GL with top edge of the plate not less than 1.5 mtr below normal GL and connected to earth plate surrounded by 15 cm thick packed layers of charcoal dust and common salt and connected to earth GI Strip 25x4mm means of bolts, nuts, check nuts and washers of galvd iron or steel and thimbles and other end of the earth wire connected to DB and protected by galvd iron or steel pipe light grade 15 mm bore and water pipe 20mm bore GI light grade with funnel and wire mesh, including all necessary excavation and earth work PCC chamber in cement concrete 1:3:6 type C-2 and RCC cover and all as shown in electrical plate No. 3 of MES schedule Pt I of 2009. \nNote : RCC pit cover shall be pre-cast of RCC (1:2:4) type B-I , 80mm thick reinforced with XPM weighting not less than 4 KG/sqmm in lieu of CI cover. | | 8 | Each Set |
|---|
| 144 | 57 | Material and labour for earth continuity conductor fix to wall on batten or recess or chases or burried in ground or drown in conduit/pipe for fix to pole or any other indicated situation or loop earthing etc as required 25x4mm galvanised iron strip. | | 20 | RM |
|---|
| 145 | 58 | Cheking and testing of Complete oxygen gas supply line for leakage and rectify the defects by tighting the joint and minor repairs, at OT MH all as directed by Engr-in-charge | | 1 | Each job |
|---|
| 146 | 59 | Supply and fix in replacement Manifiold NRV as per existing make & size/type. | | 2 | Each |
|---|
| 147 | 60 | Supply and fix in replacement Oxygen regulator as per existing make & size/type. | | 4 | Each |
|---|
| 148 | 61 | Supply and fix in replacement isolation valve 22 mm with fiting as per existing make & size/type. | | 2 | Each |
|---|
| 149 | 62 | Supply and fix in replacement Alarm 3 line as per existing make & size/type. | | 1 | Each |
|---|
| 150 | 63 | Supply and fix in replacement Alarm 4 line as per existing make & size/type. | | 1 | Each |
|---|
| 151 | 64 | Supply and fix in replacement flexible tail pipe as per existing make & size/type. | | 6 | Each |
|---|
| 152 | 65 | Supply and fix in replacement seddle for pipeline on walls 22 mm as per existing make & size/type. | | 100 | Each |
|---|
| 153 | 66 | Supply and fix in replacement CT fan blade set 100 TR delta cooling Tower with coupling. | | 3 | Set of Three |
|---|
| 154 | 67 | Disconnecting from mains and Taking out existing unserviceable scroll compressor from the AC plant of Cap 23 TR and Supply , Installing and testing of company made new Scroll Type compressor Model No. SZ 185S4RC Lubricant P.O.E 160 SZ suitable for Refrigerent 407C. Initially charging of Gas 407 and commisioning all as directed by Engg-in-Charge. Make - Danfoss (ICU AC Plant)\n | | 1 | Each Job |
|---|
| 155 | 68 | Disconnecting from mains and Taking out existing unserviceable scroll compressor from the AC plant of Cap 5 TR and Supply , Installing and testing of company made new Scroll Type compressor Model No. SZ 185S4RC Lubricant P.O.E 160 SZ suitable for Refrigerent 407C. Initially charging of Gas 407 and commisioning all as directed by Engg-in-Charge. Make - Danfoss (ICU AC Plant)\n | | 2 | Each Job |
|---|
| 156 | 69 | Note:- Amount of credit of Rs. 156830.00 for retrieved materials as mentioned in Schedule of Credit attached in tender documents in pdf form which will be deducted offline while acceptance of tender. | | | |
|---|