}

Construction Of Interpretation Shed In Wadiyaram Reserved Forest Cluster At Wadiyaram / Chegunta, MEDAK-Telangana

Hyderabad Metropolitan Development Authority-HMDA has published Construction Of Interpretation Shed In Wadiyaram Reserved Forest Cluster At Wadiyaram / Chegunta. Submission Date for this Tender is 21-07-2020. Shed Construction Tenders in MEDAK Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

24804804
Construction Of Interpretation Shed In Wadiyaram Reserved Forest Cluster At Wadiyaram / Chegunta
Open Tender
Indian
Telangana
MEDAK
21-07-2020

Tender Details

Construction Of Interpretation Shed In Wadiyaram Reserved Forest Cluster At Wadiyaram / Chegunta

Key Value

Document Fees
Refer document
EMD
INR 5200.0 /-
Tender Value
INR 5.18 Lakhs /-

BOQ Items

S.No Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)
1 Construction of Interpretation Shed in Wadiyaram Reserved Forest Cluster at Wadiyaram / Chegunta Special Specification 40.63 Sqm 107.65 4373.82
Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over an existing steel primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors
2 Construction of Interpretation Shed in Wadiyaram Reserved Forest Cluster at Wadiyaram / Chegunta Special Specification 81.25 Sqm 642.09 52169.81
Flooring with 25 mm thick polished shabad stone set over base coat of CM (1:8) over already laid CC bed / RCC Roof slab, including neat cement slurry of honey like consistency spread @ 3.30 Kg per sqm and jointed with neat cement to full depth including cost of all materials like cement, sand and water and flooring stones etc complete including all charges for dressing of stones for finished item of work complete
3 Construction of Interpretation Shed in Wadiyaram Reserved Forest Cluster at Wadiyaram / Chegunta Special Specification 63.00 Sqm 215.94 13604.22
Painting to wall faces with 2 coats of plastic emulsion paint of approved shade and make over one primer coat of approved cement primer exterior grade including cost of all materials labour charges etc complete for finished item of work and as directed by Engineer In Charge
4 Construction of Interpretation Shed in Wadiyaram Reserved Forest Cluster at Wadiyaram / Chegunta 901, 903 & 904 63.00 Sqm 438.24 27609.12
Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing including cost and conveyance of all materials, like cement, sand, water, bricks, etc to site excluding seigneorage charges on all materials and inclusive of all operational incidentals, labour charges curing etc complete for finished item of work and as directed by Engineer In Charge
5 Construction of Interpretation Shed in Wadiyaram Reserved Forest Cluster at Wadiyaram / Chegunta 309 & 310 46.80 Sqm 313.67 14679.76
Filling with Carted Earth (excluding rock ) in trenches, sides of foundations and basement with intial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering, tamping including cost and conveyance of all materials all operational, incidental, labour charges etc complete for finished item of work
6 Construction of Interpretation Shed in Wadiyaram Reserved Forest Cluster at Wadiyaram / Chegunta Special Specification 124.00 Sqm 823.71 102140.04
Roofing: - Roofing will be provided with 0.5mm thick galvanized / pre painted G.I. profiledsheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anticapillary grove.
7 Construction of Interpretation Shed in Wadiyaram Reserved Forest Cluster at Wadiyaram / Chegunta Special Specification 850.00 Kgs 95.42 81107.00
Supply & Labour charges for cutting fabricatin, welding making and fixing MS pipes of different sizes in round or sqare shape including cost and conveyance of all materials (Mild steel tubes & pipes of all dia meters as per standard specifications.
8 Construction of Interpretation Shed in Wadiyaram Reserved Forest Cluster at Wadiyaram / Chegunta Special Specification 3.97 Cum 5947.55 23611.77
Brick Masonery in CM 1:6(Cement :Sand) mix using 2nd class bricks of 23x11x7Cms size having a minimum comprssive strentth of 35 Kg per Sqm including cost and conveyance of all materials, like cement, sand, water, bricks, etc to site excluding segneorage charges on all materials and inclusive of all operational incidentals, labour charges curing etc complete for finished item of work and as directed by Engineer In Charge
9 Construction of Interpretation Shed in Wadiyaram Reserved Forest Cluster at Wadiyaram / Chegunta Special Specification 16.07 Cum 4346.68 69851.15
Course Rubble stone masonery in CM 1:6 Mix (Cement : Sand) 2nd sort using fair size granite stones including bond stones from approved quarry including cost and conveyance of all materials like cement, sand, stones, water etc., to site and excluding segneorage charges on all materials and inclusive of all operational incidentals, labour charges curing etc complete for finished item of work and as directed by Engineer In Charge
10 Construction of Interpretation Shed in Wadiyaram Reserved Forest Cluster at Wadiyaram / Chegunta Special Specification 15.12 Cum 3793.23 57353.64
Random Rubble stone masonery in CM 1:8 Mix (Cement : Sand) using fair size granite stones including bond stones from approved quarry including cost and conveyance of all materials like cement, sand, stones, water etc., to site and excluding seigneorage charges on all materials and inclusive of all operational incidentals, labour charges curing etc complete for finished item of work and as directed by Engineer In Charge
11 Construction of Interpretation Shed in Wadiyaram Reserved Forest Cluster at Wadiyaram / Chegunta Special Specification 15.71 Cum 4248.01 66736.24
Plain Cement concrete 1:4:8 nominal mixing (Cement:Sand: Metal) as per IS 456 using 40MM size machine crushed hard granite metal (Course aggregate ) from approved Quarry / source including cost and conveyance of all materials like Cement , sand, Metal Water etc to site and exclusive of seignerage charges on all materials inclusive of all operational incidental , labour charges like machine , mixing placing of concrete compacting, curing etc complete for foundations flooring footings bed etc.
12 Construction of Interpretation Shed in Wadiyaram Reserved Forest Cluster at Wadiyaram / Chegunta 308.0 23.94 Cum 224.53 5375.25
Earth work Excavation for foundations and depositing on sides with all lifts and initial lead of 10.0 Mts including all operational incidentals, labour charges like shoring, sheeting planking, shuttering etc., complete by manual means upto 3Mts depth in all soils including overhead charges & Contractor\s profit & excluding Seignorage charges (APSS 308)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail