| 1 | 1 | Erection of Auxiliary structure as per drawing and tightening of nuts and bolts with proper alignment including shifting of structure from store to site and proper stacking (BTI- 01 No., BCT-06 No., ALP-05 No., BTM-05 No., ATM-02 No., BBR-03 NO., AXM-02 No., TI-01 No., ALP-02 No.). | BI01010001010000000000000515BI0100001113 | 26 | MT |
|---|
| 2 | 2 | Making of bus bar of Zebra conductor including cutting and making proper in shape, fitting of tension fitting with insulator string. | BI01010001010000000000000515BI0100001114 | 12 | Job |
|---|
| 3 | 3 | Stringing of 3 phase prepaired bus bar length 22 Mtr. including all labour & T&P etc. | BI01010001010000000000000515BI0100001115 | 3 | Job |
|---|
| 4 | 4 | Stringing of 3 phase prepaired bus bar length 33 Mtr. including all labour & T&P etc. | BI01010001010000000000000515BI0100001116 | 2 | Job |
|---|
| 5 | 5 | Jointing of each bus section with Zebra conductor jumper including cutting & making in proper shape all labour & T&P etc. | BI01010001010000000000000515BI0100001117 | 9 | Job |
|---|
| 6 | 6 | Erection of following equipments as per instruction manual of various equipments and technical specification including shifting of material / equipments from store to erection site including all other associates work to complete the job. | BI01010001010000000000000515BI0100001124 | | |
|---|
| 7 | 6.1 | 132 KV SF-6 Breaker | BI01010001010000000000000515BI0100001125 | 1 | Nos |
|---|
| 8 | 6.2 | 132 KV CT | BI01010001010000000000000515BI0100001126 | 3 | Nos |
|---|
| 9 | 6.3 | 132 KV LA | BI01010001010000000000000515BI0100001127 | 3 | Nos |
|---|
| 10 | 6.4 | 132 KV Isolator BI, LI & Tandem | BI01010001010000000000000515BI0100001128 | 3 | Nos |
|---|
| 11 | 6.5 | 132 KV PT | BI01010001010000000000000515BI0100001128 | 3 | Nos |
|---|
| 12 | 6.6 | 132 KV Post Insulator (Solid Core) | BI01010001010000000000000515BI0100001128 | 21 | Nos |
|---|
| 13 | 6.7 | 132 KV Control & relay panel | BI01010001010000000000000515BI0100001128 | 1 | Nos |
|---|
| 14 | 7 | Complete interconnection of 132 KV bay with ACSR panther conductor consisting of all the 132 KV bay equipments & bus bar including cutting bending of associated works to complete the job satisfactorily as per drawing and technical specification. | BI01010001010000000000000515BI0100001128 | 1 | Job |
|---|
| 15 | 8 | Excavation of earth for laying of earthing MS rod of dia 40mm in extended 132 KV switchyard of 132 KV S/S, Chhutmalpur for Const. of 132 KV bay including all labour and T&P etc. at 132 KV S/S, Chhutmalpur. | BI01010001010000000000000515BI0100001128 | 380 | RMT |
|---|
| 16 | 9 | Laying of MS Rod, 40 mm dia length 12 M in excavated tunnel with proper alignment | BI01010001010000000000000515BI0100001128 | 46 | Job |
|---|
| 17 | 10 | Fixing of 3 mtr. Length electrode of MS Rod, 40 mm dia under earth with hammering | BI01010001010000000000000515BI0100001128 | 33 | Job |
|---|
| 18 | 11 | Welding of each MS rod, 40mm dia to each other and with earthing electrod including all material, labour & T&P etc. | BI01010001010000000000000515BI0100001128 | 90 | Job |
|---|
| 19 | 12 | Cutting, Strengthening, bending, laying 800mm below in ground and above ground of following size of MS flat for earthing of auxiliary structure equipment structure etc. including jointing by welding with main earth mat and with object to be earthed /excavation of trenches its back filling. | BI01010001010000000000000515BI0100001124 | | |
|---|
| 20 | 12.1 | 75x10 mm MS flat | BI01010001010000000000000515BI0100001128 | 200 | RMT |
|---|
| 21 | 12.2 | 50x6 mm MS flat | BI01010001010000000000000515BI0100001128 | 750 | RMT |
|---|
| 22 | 13 | Painting of MS flat by one coat of anti-corrosive red oxide (primer) and two coats of green pain after proper cleaning by sand paper. | BI01010001010000000000000515BI0100001124 | | |
|---|
| 23 | 13.1 | 75x10 mm MS flat | BI01010001010000000000000515BI0100001128 | 166 | RMT |
|---|
| 24 | 13.2 | 50x6 mm MS flat | BI01010001010000000000000515BI0100001128 | 600 | RMT |
|---|
| 25 | 14 | Making delta earthing LA's of R, Y, B phase work including digging of earth upto 2.5m and cutting & welding work MS Rod, 40mm dia and MS flat 75x10mm including all material, labour & T&P etc. | BI01010001010000000000000515BI0100001128 | 3 | Job |
|---|
| 26 | 15 | Preparation of cable laying schedule for bay and cable inter connection diagram for complete operation with the job satisfactory. | BI01010001010000000000000515BI0100001128 | 1 | Job |
|---|
| 27 | 16 | Laying of following sizes of control cable in the cable trench from control relay panel to various equipments/ marshlling boxes and JB etc. in switchyard as per cable schedule. | BI01010001010000000000000515BI0100001124 | | |
|---|
| 28 | 16.1 | 2Cx2.5 Sq.mm Control cable | BI01010001010000000000000515BI0100001128 | 500 | MTR |
|---|
| 29 | 16.2 | 4Cx2.5 Sq.mm Control cable | BI01010001010000000000000515BI0100001128 | 500 | MTR |
|---|
| 30 | 16.3 | 6Cx2.5 Sq.mm Control cable | BI01010001010000000000000515BI0100001128 | 500 | MTR |
|---|
| 31 | 17 | Termination of cable as per cable schedule including making necessary holes in glands plates or box where ever required supply and fixing of cable glands of appropriate size, supply & providing ferrules & nos. for each core of cable and its termination with crimping type lugs of dowell/ tension make and all other associated work to complete the job satisfactory. | BI01010001010000000000000515BI0100001128 | 300 | Nos |
|---|
| 32 | 18 | Providing and laying of 1.5\" dia GI pipe from CT/PT junction box for 132 KV Solar feeder meter cubical by using proper size of GI \"T\" and \"Elbow\" as per requirement of site & direction of Supervising Engineer and all other associated work to complete the job. | BI01010001010000000000000515BI0100001128 | 98 | RMT |
|---|