Construction Of First Floor To Central Library In Adilabad. (Reserved For Sc, St, Waddar Labour Cont. Co-Operative Socieities Only). (4Th Call), ADILABAD-Telangana

Municipalities-M has published Construction Of First Floor To Central Library In Adilabad. (Reserved For Sc, St, Waddar Labour Cont. Co-Operative Socieities Only). (4Th Call). Submission Date for this Tender is 10-07-2020. Building Work Tenders in ADILABAD Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

24789273
Construction Of First Floor To Central Library In Adilabad. (Reserved For Sc, St, Waddar Labour Cont. Co-Operative Socieities Only). (4Th Call)
Open Tender
Indian
Telangana
ADILABAD
10-07-2020

Tender Details

Construction Of First Floor To Central Library In Adilabad. (Reserved For Sc, St, Waddar Labour Cont. Co-Operative Socieities Only). (4Th Call)

Key Value

Document Fees
Refer document
EMD
INR 57176.0 /-
Tender Value
INR 57.17 Lakhs /-

BOQ Items

S.No Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)
1 Construction of First Floor to Central Library APSS / Morth Cl. Number ( upto 200 Characters) 0 UOM ( upto 50 C 0 0
Item Detailed Specification Description
2 Construction of First Floor to Central Library 304 MORTH 236.95 1 Cum 220.84 52328.00
Earthwork excavation in all kinds of soil by manually for foundation as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete Manual Means
3 Construction of First Floor to Central Library As per department / standard specifications 17.03 1 Cum 3867.05 65856.00
Laying of Plain cement concrete (1:4:8) prop using 40mm HB metal including the cost and conveyances of all materials and labour chargesi such as mixing mortar, placing ,vibrating , finishing , curring etc., complete
4 Construction of First Floor to Central Library As per SS 611 38.40 1 Cum 4332.20 166356.00
Construction of in CRS Masonary using 2nd Sort granite stone in Cement Mortor 1:6 Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, Etc., including Cost of on all Materials, Labour for cutting Stones to required size and shape mixing of Cement Mortor Construction, Scaffolding Charges curing Etc., Complete for Finished item of Work . (As per SS 611)
5 Construction of First Floor to Central Library APSS No.402 28.61 1 Cum 8651.17 247510.00
Supply and placing of the M25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. (i).For Footings
6 Construction of First Floor to Central Library APSS No.402 8.37 1 Cum 9229.70 77253.00
Supply and placing of the M25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. (ii).For Pedastals for column footings
7 Construction of First Floor to Central Library APSS No.402 11.50 1 Cum 11635.38 133807.00
Supply and placing of the M25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. (iii).For Columns
8 Construction of First Floor to Central Library APSS No.402 7.84 1 Sqm 11176.60 87625.00
Supply and placing of the M25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. (iv).For Plinth Bheams
9 Construction of First Floor to Central Library APSS No.402 1.45 1 Cum 11638.79 16876.00
Supply and placing of the M25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. (v).For Lintels
10 Construction of First Floor to Central Library APSS No.402 26.46 1 Sqm 1006.47 26631.00
Supply and placing of the M25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. (vi).For Sunshade
11 Construction of First Floor to Central Library APSS No.402 8.47 1 Cum 10974.85 92957.00
Supply and placing of the M25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. (vi).For Roof beams
12 Construction of First Floor to Central Library APSS No.402 167.95 1 Cum 1436.68 241290.00
Supply and placing of the M25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. (vii).For Slabs 150mm thick
13 Construction of First Floor to Central Library APSS No.126 8998.21 1 K 61.01 548981.00
Supplying, fitting and placing of HYSD Fe-500 bars as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded. HYSD-Fe500, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all materials etc., complete for finished item of work in all floors.( APSS No.126)
14 Construction of First Floor to Central Library 305.3.9 MORD & 304 MORTH 107.11 1 Cum 270.00 28920.00
Supply and filling the foundation and basement with Gravel with standard specification for finished item of work.including material, labour charges such as spredding ,watering, ramming 15cm th layer by layer , Levelling including cost & conveyance of Material , labour charges etc.com as per standard specification. Clause 305.3.9 MORD & 304 MORTH
15 Construction of First Floor to Central Library As per department / standard specifications 16.06 1 Cum 5654.22 90807.00
Brick Masonry with common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cm in CM (1:6) prop having a crushing strength of not less than 35.00kg/cm2 including cost and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete for finished item of work as per BLD-CSTN-3-1 (230mm thick walls)
16 Construction of First Floor to Central Library As per department / standard specifications 39.93 1 Sqm 714.43 28527.00
11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, including conveyance charges of materials.
17 Construction of First Floor to Central Library As per department / standard specifications 19.20 1 Rmt 7860.40 0
Manufacturing, supply and errection of Stainless steel hand rails using 60.30mm dia, 2.90mm thick Mirror polished Seamless tubes with two horizontal rails and verticle posts spaced not more than 1.0 m as directed by departmental officers, including fabrication buffing, polishing, lacquer finishing, welding with stainless steel welding rods and transportation to site, fixing with 100mm dia 8mm thick SS base plate including cost and conveyance of all materials, SS welding rods, fabrication charges, and labour charges for fixing in position and all other incidental and operational charges etc., complete for finished item of work.
18 Construction of First Floor to Central Library As per SS 904 247.00 1 Sqm 430.42 106314.00
Plastering to external walls in 20mm thick in two coats with base coat of 16mm thick in C.M. (1:6) and topcoat of 4mm thick in C.M (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand,. Water, etc., to site all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls, (As per SS 904)
19 Construction of First Floor to Central Library As per SS 904 345.08 1 Cum 418.23 144323.00
Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing. including cost & conveyance of all materials like cement, Sand,. Water, etc., to site all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls, (As per SS 904)
20 Construction of First Floor to Central Library As per SS 904 132.78 1 Sqm 443.10 58835.00
Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing. including cost & conveyance of all materials like cement, Sand,. Water, etc., to site cost of seigniorage charges on all materials, all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls, (As per SS 904) ceiling
21 Construction of First Floor to Central Library As per SS 912 247.00 1 Sqm 214.79 53053.00
Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls
22 Construction of First Floor to Central Library As per department / standard specifications 477.86 1 Sqm 199.22 95199.00
Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work
23 Construction of First Floor to Central Library As per department / standard specifications 132.78 1 Sqm 594.81 78979.00
Flooring with 25mm thick polished shabad stones set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including labour charges for dressing of flooring stones etc., complete for finished item of work, including the cost of conveyance of all materials.
24 Construction of First Floor to Central Library As per department / standard specifications 5.27 1 Sqm 620.27 3269.00
Providing skirting to internal walls to 15 cm height/risers of steps with 25 mm thick polished Cuddapah stone length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like Cuddapah stone, cement, sand and water etc., complete for finished item of work.
25 Construction of First Floor to Central Library As per department / standard specifications 149.76 1 Sqm 64.82 9707.00
Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work & New Iron Work to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, including conveyance charges of materials
26 Construction of First Floor to Central Library As per department / standard specifications 167.95 1 Sqm 470.66 79047.00
Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, including conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work
27 Construction of First Floor to Central Library As per department / standard specifications 2.00 Each 10293.69 20587.00
Supply and Fixing of single leaf shutter, Door Size 1.20x2.10 mtrs with salwood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood block board type with commercial ply on both faces of 35mm thick including cost of fixtures such as MS Powder coated Tower Bolts 250mm long 1 Nos, MS Powder coated Handles 150mm long 2 Nos, 300mm long MS Powder coated Aldrops 1No, 125mm long M.S.Powder Coated butt hinges 3Nos, 300 mm long MS Powder coated Flat latch 1No, Door stopper 1 Nos, MS Hold fasts 6 Nos 230mm long , cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.
28 Construction of First Floor to Central Library As per department / standard specifications 5.00 Each 8937.74 44689.00
Supply and Fixing of single leaf shutter, Door Size 0.90x2.10 mtrs with salwood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood block board type with commercial ply on both faces of 35mm thick including cost of fixtures such as MS Powder coated Tower Bolts 250mm long 1 Nos, MS Powder coated Handles 150mm long 2 Nos, 300mm long MS Powder coated Aldrops 1No, 125mm long M.S.Powder Coated butt hinges 3Nos, 300 mm long MS Powder coated Flat latch 1No, Door stopper 1 Nos, MS Hold fasts 6 Nos 230mm long , cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.
29 Construction of First Floor to Central Library As per department / standard specifications 32.40 1 Sqm 8262.08 267691.00
Supply and fixing of Pre Laminated Cement Bonded Particle Board (as per IS-14276) WINDOWS with Pre-Painted Steel Sections fabricated from pre-painted Cold rolled formed sections made of galvanized steel color coated sections {Base steel as per 15-512 quality, galvanized as per IS-277 with Zinc of 120 gram/sqm) with total coated thickness of 0.58mm primer coated with epoxy primer of 5-7 microns thick, finish painted with polyester paint of 12-16 microns and back coated with alkyd backer of 5-7 microns), the sections for outer frame and centre mullion (duly filled with PU form of 40 kg/Cum) should be of 60mm x 50mm, with provision for fixing glazed shutter. The section for glazed/paneled shutter should be of size 48mm x 25 mm and another section of size 60mm x 23mm should be provided for separating glazed and paneled portion 5 mm thick colour pin headed glass is to be provided for glazing and providing guard bars of 10mm square rods duly welded at 150mm pitch to MS flat section of size 18mm and 3mm thick. Windows are to be fixed to wall by means of self expansion nylon Cap (75) and electroplated wooden screws of size 100mm, including aluminum powder coated fittings, A) 75mm long grip handles 1 no per shutter, B) 75 mm long tower bolts 2 nos. per shutter, C) Heavy duty 55 Pivot hinges 2 nos per shutter, D) MS Powder coated telescopic stay 1no per shutter. Pre Laminated Cement Bonded Particle Board (as per IS-14276) WINDOWS WITH PPS SECTIONS ? Double shutter 4\0"x4\0" outer frame section size of 50mm x 60mm shutter frame section size of 48mm x 25mm Mullion section size of 50mm x 60mm for outer frame
30 Construction of First Floor to Central Library APSS No.402 4.35 1 Cum 11905.90 51755.00
Supply and placing of the Design Mix M25 Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. (a). Columns
31 Construction of First Floor to Central Library APSS No.402 0.82 1 Cum 12502.26 10264.00
Supply and placing of the Design Mix M25 Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. 2nd Floor Head Room
32 Construction of First Floor to Central Library APSS No.402 9.33 1.0 11201.83 104513.00
Supply and placing of the Design Mix M25 Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. First Floor (a) Roof Beams
33 Construction of First Floor to Central Library APSS No.402 1.04 1 Cum 11247.52 11697.00
Supply and placing of the Design Mix M25 Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. 2nd Floor Head Room
34 Construction of First Floor to Central Library APSS No.402 0.93 1 Cum 11831.48 11003.00
Supply and placing of the Design Mix M25 Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. ii.First Floor (a) Lintels
35 Construction of First Floor to Central Library APSS No.402 202.89 1 Sqm 1462.36 296698.00
Supply and placing of the Design Mix M25 Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. iii.First Floor (a) Slabs 150mm thick
36 Construction of First Floor to Central Library APSS No.402 11.25 1 Sqm 1519.40 17093.00
Supply and placing of the Design Mix M25 Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. 2nd Floor Head Room
37 Construction of First Floor to Central Library APSS No.402 7.35 1 Sqm 1032.15 7586.00
Supply and placing of the Design Mix M25 Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. iv.First Floor (a) Sunshades 75mm thickness
38 Construction of First Floor to Central Library APSS No.402 15.90 1 Sqm 1624.07 25823.00
Supply and placing of the Design Mix M25 Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. FOR COLUMNS, LINTELS, WATER TANKS, RCC WALLS in BUILDINGS. iv.First Floor (b) Slab-175mm thickness
39 Construction of First Floor to Central Library APSS No. 126 4854.00 1 Kg 61.01 296143.00
Supplying, fitting and placing of HYSD Fe-500 bars as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded. HYSD-Fe500, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all materials etc., complete for finished item of work in all floors. (APSS No.126)
40 Construction of First Floor to Central Library As per department / standard specifications 63.31 1 Cum 5361.82 339457.00
Brick Masonry in CM (1:6) with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894- 1990 - CLASS - 7.5 290 x 225 x 140 mm 1990 - CLASS - 7.5 290 x 225 x 140 mm including cost and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete for finished item of work as per SS First Floor
41 Construction of First Floor to Central Library As per department / standard specifications 16.05 1 Cum 6432.72 103245.00
Brick Masonry in CM (1:6) with Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894- 1990 - CLASS - 7.5 290 x 225 x 140 mm 1990 - CLASS - 7.5 290 x 225 x 140 mm including cost and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete for finished item of work as per SS Head Room
42 Construction of First Floor to Central Library As per department / standard specifications 20.79 1 Sqm 824.54 17142.00
11.5 cm wide Brick masonry for super-structure on First floor in cm (1:3) using second class traditional size bricks including cost of all materials, labour and all operations for constructing half brick masonry, mixing cement mortar, curing, scaffolding etc., complete for finished item of work
43 Construction of First Floor to Central Library APSS No. 403 & 903 16.60 1 Sqm 1498.43 24874.00
RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal reinforcement as directed by Engineer-in-charge with dubara sponge finishing, including cost & conveyance of all materials to site, operational & incidental, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift charges etc., complete for finished items of work for finished item of work. (APSS No.403 & 903)
44 Construction of First Floor to Central Library As per SS 904 210.28 1 Sqm 418.23 87945.00
Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing. including cost & conveyance of all materials like cement, Sand,. Water, etc., to site cost of seigniorage charges on all materials, all taxes, all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls, (As per SS 904) First Floor
45 Construction of First Floor to Central Library As per SS 904 151.02 1 Sqm 430.79 65058.00
Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing. including cost & conveyance of all materials like cement, Sand,. Water, etc., to site cost of seigniorage charges on all materials, all taxes, all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls, (As per SS 904) Head Room
46 Construction of First Floor to Central Library As per SS 904 405.23 1 Sqm 430.79 174569.00
Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing. including cost & conveyance of all materials like cement, Sand,. Water, etc., to site cost of seigniorage charges on all materials, all taxes, all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls, (As per SS 904)
47 Construction of First Floor to Central Library As per SS 904 176.97 1 Sqm 443.10 78415.00
Plastering to ceiling in 12mm thick in two coats with base coat of 8mm thick in C.M. (1:4) and top coat of 4mm thick in C.M (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand,. Water, etc., to site all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls, (As per SS 904)
48 Construction of First Floor to Central Library As per department / standard specifications 6.00 Each 8937.74 53626.00
Supply and Fixing of single leaf shutter, Door Size 0.90x2.10 mtrs with salwood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood block board type with commercial ply on both faces of 35mm thick including cost of fixtures such as MS Powder coated Tower Bolts 250mm long 1 Nos, MS Powder coated Handles 150mm long 2 Nos, 300mm long MS Powder coated Aldrops 1No, 125mm long M.S.Powder Coated butt hinges 3Nos, 300 mm long MS Powder coated Flat latch 1No, Door stopper 1 Nos, MS Hold fasts 6 Nos 230mm long , cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.
49 Construction of First Floor to Central Library As per department / standard specifications 27.00 Each 8262.08 223076.00
Supply and fixing of Pre Laminated Cement Bonded Particle Board (as per IS-14276) WINDOWS with Pre-Painted Steel Sections fabricated from pre-painted Cold rolled formed sections made of galvanized steel color coated sections {Base steel as per 15-512 quality, galvanized as per IS-277 with Zinc of 120 gram/sqm) with total coated thickness of 0.58mm primer coated with epoxy primer of 5-7 microns thick, finish painted with polyester paint of 12-16 microns and back coated with alkyd backer of 5-7 microns), the sections for outer frame and centre mullion (duly filled with PU form of 40 kg/Cum) should be of 60mm x 50mm, with provision for fixing glazed shutter. The section for glazed/paneled shutter should be of size 48mm x 25 mm and another section of size 60mm x 23mm should be provided for separating glazed and paneled portion 5 mm thick colour pin headed glass is to be provided for glazing and providing guard bars of 10mm square rods duly welded at 150mm pitch to MS flat section of size 18mm and 3mm thick. Windows are to be fixed to wall by means of self expansion nylon Cap (75) and electroplated wooden screws of size 100mm, including aluminum powder coated fittings, A) 75mm long grip handles 1 no per shutter, B) 75 mm long tower bolts 2 nos. per shutter, C) Heavy duty 55 Pivot hinges 2 nos per shutter, D) MS Powder coated telescopic stay 1no per shutter.
50 Construction of First Floor to Central Library As per department / standard specifications 2.00 Each 4810.38 9621.00
Supply and fixing door shutter with frame made out of PVC section and panels conforming to IS:10151-1982 having panel sizes of 100 mm x 30 mm with self extruded grooves at 40 mm x 50 mm grooves on front face and the infill panel dimension is 610 mm x 20 mm seamless hallow multi chambered PVC single panel for finished item of work.
51 Construction of First Floor to Central Library As per department / standard specifications 0.90 1 Sqm 4759.33 4283.00
Providing and fixing of louvered Ventilators made of pre-painted steel as per IS 513 of 0.80 mm thick galvanized as per IS 277 with a polyester paint with and fitted with 4 mm thick plain float glass including fixing the frames in concrete/masonry wall by means of self expanding screws, etc., complete for finished item of work for (i) Single fixed Louvers Ventilator size of 2? 0? x 2? 0? (609.6 x 609.6mm) outer frame box section size of 80 x 45mm and (ii) Double fixed Louvers ventilator Size of 4? 0? x 2? 0? (1219.2mm x 609.6mm) outer frame box section size of 80 x 45mm, vertical mullion section size of 80 x 60 mm and (iii) Double fixed Louvers Ventilator size of 4?0? x 3?0? (1219.2mm x 914.4mm outer frame box section size of 80 x 45mm , Vertical mullion section size of 80 x 60 mm including Fabrication & all fixtures charges
52 Construction of First Floor to Central Library As per department / standard specifications 394.50 1 Sqm 214.79 84735.00
Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls
53 Construction of First Floor to Central Library As per department / standard specifications 582.20 1 Sqm 199.22 115986.00
Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work
54 Construction of First Floor to Central Library As per department / standard specifications 178.70 1 Sqm 594.81 106293.00
Flooring with 25mm thick polished shabad stones set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including labour charges for dressing of flooring stones etc., complete for finished item of work, including the cost of conveyance of all materials.
55 Construction of First Floor to Central Library As per department / standard specifications 17.85 1 Sqm 620.27 11072.00
Providing skirting to internal walls to 15 cm height/risers of steps with 25 mm thick polished Cuddapah stone length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like Cuddapah stone, cement, sand and water etc., complete for finished item of work.
56 Construction of First Floor to Central Library As per department / standard specifications 37.80 1 Sqm 64.82 2450.00
Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work & New Iron Work to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, including conveyance charges of materials
57 Construction of First Floor to Central Library As per department / standard specifications 25.92 1 Sqm 522.16 13534.00
Providing skirting to internal walls to 15 cm height/risers of steps with ceramic tiles 7.30 mm thick length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete for finished item of work, including the cost of conveyance of all materials
58 Construction of First Floor to Central Library As per department / standard specifications 12.96 1 Sqm 817.44 10594.00
Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, complete for finished item of work,including the cost of conveyance of all materials.
59 Construction of First Floor to Central Library As per department / standard specifications 202.89 1 Sqm 470.66 95492.00
Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, including conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work
60 Construction of First Floor to Central Library As per department / standard specifications 40.00 Each 808.94 32358.00
Sanitary items Supplying, laying, jointing & testing of 152.40m SWG SP-I pipes as per IS make confirming 651&4127 with air tight cement joints in CM 1:5:1 prop including earth work excavation of trenches of required width and depth upto 1.52mts and socket pits in all kinds of soils refilling the excavated soil including watering and tamping etc. and laying the pipes true to alignment and gradient and testing of joints including cost & conveyance, of all materials to worksite, all labour charges etc., complete as per special specification and as directed by the Engineer-in-charge for finished item of work
61 Construction of First Floor to Central Library As per department / standard specifications 4.00 Each 7221.37 28885.00
Constructing 914.4 mm x 457.2 mm (3\0"x1\6") brick in CM 1:6 prop. Masonry Inspection chamber up to 914.4 mm (3\0") and fitted with light weight 914.4 mm x 457.2 mm (3\0"x1\6") C.I frame and cover of 40 Kg upto a depth of 914.40mm including excavation in all types of soils laying 100mm thick plain CC (1:5:10) prop. bed making channel in plain CC (1:2:4) prop. 12mm thick plastering in CM (1:4) prop. to inside & outside walls & fitted with light weight 40kgs of 914.40mmx457.20mm CI frame and cover including cost , of all materials , conveyance complete as per special specification and as directed by Engineer-in-charge for finished item of work.
62 Construction of First Floor to Central Library As per department / standard specifications 2.00 Each 3876.54 7753.00
Supplying & Fixing of Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-2004 with "P" or "S" trap 580mm x 440mm including 10 lit. low level porcelain of approved make flushing cistern confirming to IS 7231 with all internal fittings, CI brackets, 31.50mm CP flush pipe, 15mm dia 450mm long PVC connector, 15mm dia CP brass stop cock 300 grams of ISI make, cutting and making grooves the walls and floors wherever required including cost and conveyance, of all material to work site, all labour charges for fixing etc., complete as directed by Engineer-in-charge for finished item of work.(Neycer/Parryware or Hindustan)
63 Construction of First Floor to Central Library As per department / standard specifications 2.00 Each 2554.07 5108.00
Supplying & Fixing Indian make Flat Back Wash HandBasin 1st quality conforming to IS:2556-Part-4:1972 withwaste fittings like rubber plug, chain, 32 mm nominal sizeC.P. Fitting with parallel pipe thread conforming toIS:2963-1979 and fitted with 15 mm nominal boreChromium Plated Pillar Tap of 1st quality Indian make400 grams complete with standard CI brackets includingwooden block: 660 x 460 mm - Single C.P. Pillar cock, including cutting and making grooves in the walls/floors wherever required including cost & conveyance, of all materials to work site, all labour charges for all operations etc., complete. as per special specification and as directed by the engineer-in-chief for finished item of work.
64 Construction of First Floor to Central Library As per department / standard specifications 1.00 Each 4353.73 4354.00
Construction of 457.20mmx457.20mm inspection chamber with brick masonry using 2nd class modular size (19x9x9cm) in CM (1:6) prop. upto a depth of 914.40mm including excavation in all types of soils laying 100mm thick plain CC (1:5:10) prop. bed making channel in plain CC (1:2:4) prop. 12mm thick plastering in CM (1:4) prop. to inside & outside walls & fitted with light weight 457.2 mm x 457.2 mm (1\6"x1\6") C.I frame and cover of 20 Kg including cost of all materials , conveyance complete as per special specification and as directed by Engineer-in-charge for finished item of work.
65 Construction of First Floor to Central Library As per department / standard specifications 4.00 Each 153.38 614.00
Supplying & fixing 4" (101.60mm) Nahani Trap with jali 1st quality ISI marked fixing with white cement as per site requirements with standard practice for nominal dia 100 mm (4") including cost of cutting & making grooves in the walls and floors etc. as directed by Engineer-in-charge including cost & conveyance, of all materials to work site, all labour charges for fixing etc., complete as per s.s for finished item of work
66 Construction of First Floor to Central Library As per department / standard specifications 15.20 1 Rmt 431.74 6562.00
Supply, laying, jointing & testing of the following sizes 3 M double Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/Sudhakar/Kisan/Supreme or any ISI Brand and including cost and conveyance, conveyance of all materisls etc., complete as per s.s. for finished item of work.
67 Construction of First Floor to Central Library As per department / standard specifications 3.60 1 Rmt 938.46 3378.00
Supplying and fixing of C.I. Double Socket soil pipes ISI marked conforming to IS:1729-1979 of reputed make with cement caulked joints and fixing as per site requirements including painting black with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in cement mortar (1½:1) and including fixing of M.S. clamps if necessary with required no. of Bombay nails including cost and conveyance, of all materials , conveyance of all materials and labour charges for fixing of pipes in position as directed by Engineer-in-charge for finished item of work.etc., complete 75mm dia
68 Construction of First Floor to Central Library As per department / standard specifications 3.60 1 Rmt 1259.99 4536.00
Supplying and fixing of C.I. Double Socket soil pipes ISI marked conforming to IS:1729-1979 of reputed make with cement caulked joints and fixing as per site requirements including painting black with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in cement mortar (1½:1) and including fixing of M.S. clamps if necessary with required no. of Bombay nails including cost and conveyance, of all materials , conveyance of all materials and labour charges for fixing of pipes in position as directed by Engineer-in-charge for finished item of work.etc., complete 100mm dia
69 Construction of First Floor to Central Library As per department / standard specifications 1.00 Each 332.89 333.00
Supplying & fixing CI Plain bends Ist quality ISI marked conforming to IS:1729-1979 with cement caulked joints and fixing as per site requirements with standard practice including painting black with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in cement mortar (1½:1) and including fixing of M.S. clamps if necessary with required no. of Bombay nails including cost and conveyance, of all materials , conveyance of all materials and labour charges for fixing of pipes in position as directed by Engineer-in-charge for finished item of work.etc., complete 75mm dia
70 Construction of First Floor to Central Library As per department / standard specifications 1.00 Each 424.92 425.00
Supplying & fixing CI Plain bends Ist quality ISI marked conforming to IS:1729-1979 with cement caulked joints and fixing as per site requirements with standard practice including painting black with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in cement mortar (1½:1) and including fixing of M.S. clamps if necessary with required no. of Bombay nails including cost and conveyance, of all materials , conveyance of all materials and labour charges for fixing of pipes in position as directed by Engineer-in-charge for finished item of work.etc., complete 100mm dia
71 Construction of First Floor to Central Library As per department / standard specifications 1.00 Each 414.69 415.00
Supplying & fixing CI plug (door) bends Ist quality ISI marked conforming to IS:1729-1979 with cement caulked joints and fixing as per site requirements with standard practice including painting black with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in cement mortar (1½:1) and including fixing of M.S. clamps if necessary with required no. of Bombay nails including cost and conveyance of all materials , conveyance of all materials and labour charges for fixing of pipes in position as directed by Engineer-in-charge for finished item of work.etc., complete 75mm dia
72 Construction of First Floor to Central Library As per department / standard specifications 1.00 Each 513.54 514.00
Supplying & fixing CI plug (door) bends Ist quality ISI marked conforming to IS:1729-1979 with cement caulked joints and fixing as per site requirements with standard practice including painting black with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in cement mortar (1½:1) and including fixing of M.S. clamps if necessary with required no. of Bombay nails including cost and conveyance of all materials , conveyance of all materials and labour charges for fixing of pipes in position as directed by Engineer-in-charge for finished item of work.etc., complete 100mm dia
73 Construction of First Floor to Central Library As per department / standard specifications 1.00 Each 521.49 521.00
Supplying & fixing of CI soil plain single junction of Ist quality ISI marked conforming to IS:1729-1979 with cement caulked joints and fixing as per site requirements with standard practice including painting black with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in cement mortar (1½:1) and including fixing of M.S. clamps if necessary with required no. of Bombay nails including cost and conveyance,of all materials , conveyance of all materials and labour charges for fixing of pipes in position as directed by Engineer-in-charge for finished item of work.etc., complete 75mm dia
74 Construction of First Floor to Central Library As per department / standard specifications 1.00 Each 812.35 812.00
Supplying & fixing of CI soil plain single junction of Ist quality ISI marked conforming to IS:1729-1979 with cement caulked joints and fixing as per site requirements with standard practice including painting black with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in cement mortar (1½:1) and including fixing of M.S. clamps if necessary with required no. of Bombay nails including cost and conveyance,of all materials , conveyance of all materials and labour charges for fixing of pipes in position as directed by Engineer-in-charge for finished item of work.etc., complete 100mm dia
75 Construction of First Floor to Central Library As per department / standard specifications 25.00 1 Rmt 189.74 4744.00
Water Supply Items Supply, laying, jointing & testing ISI mark `B\ class GI pipes of the following sizes with corresponding GI specials such as tees, bends, elbows, reducing tees, extension pieces, reducers check nuts etc., and including cost and conveyance, sales tax royalties of all materials , conveyance of all materisls threading clamps, nails wherever necessary etc., complete as per s.s. for finished item of work. i. 15mm dia GI Pipe
76 Construction of First Floor to Central Library As per department / standard specifications 35.00 1 Rmt 217.00 7595.00
Supply, laying, jointing & testing ISI mark `B\ class GI pipes of the following sizes with corresponding GI specials such as tees, bends, elbows, reducing tees, extension pieces, reducers check nuts etc., and including cost and conveyance, sales tax royalties of all materials , conveyance of all materisls threading clamps, nails wherever necessary etc., complete as per s.s. for finished item of work. ii. 20mm dia GI Pipe
77 Construction of First Floor to Central Library As per department / standard specifications 25.00 1 Rmt 285.17 7129.00
Supply, laying, jointing & testing ISI mark `B\ class GI pipes of the following sizes with corresponding GI specials such as tees, bends, elbows, reducing tees, extension pieces, reducers check nuts etc., and including cost and conveyance, sales tax royalties of all materials , conveyance of all materisls threading clamps, nails wherever necessary etc., complete as per s.s. for finished item of work. iii. 25mm dia GI Pipe
78 Construction of First Floor to Central Library As per department / standard specifications 6.00 Each 46.58 279.00
Supply, laying, jointing & testing ISI mark GI unions of the following sizes with corresponding GI specials such as tees, bends, elbows, reducing tees, extension pieces, reducers check nuts etc., and including cost and conveyance, of all materials , conveyance of all materisls threading clamps, nails wherever necessary etc., complete as per s.s. for finished item of work. i.15mm dia
79 Construction of First Floor to Central Library As per department / standard specifications 4.00 Each 55.67 223.00
Supply, laying, jointing & testing ISI mark GI unions of the following sizes with corresponding GI specials such as tees, bends, elbows, reducing tees, extension pieces, reducers check nuts etc., and including cost and conveyance, of all materials , conveyance of all materisls threading clamps, nails wherever necessary etc., complete as per s.s. for finished item of work. ii.20mm dia
80 Construction of First Floor to Central Library As per department / standard specifications 4.00 Each 84.08 336.00
Supply, laying, jointing & testing ISI mark GI unions of the following sizes with corresponding GI specials such as tees, bends, elbows, reducing tees, extension pieces, reducers check nuts etc., and including cost and conveyance, of all materials , conveyance of all materisls threading clamps, nails wherever necessary etc., complete as per s.s. for finished item of work. iii.25mm dia
81 Construction of First Floor to Central Library As per department / standard specifications 2.00 Each 253.36 507.00
Suply & fixing of 12.70mm NP Bib tap of Indian make heavy duty Seiko/ Senior/ Nice/ Senior/ Nice or equivalent at all levels including cost & conveyance, of all materials, labour charges for finished item of work as per special specification and as directed by the Engineer-in-charge for finished item of work.
82 Construction of First Floor to Central Library As per department / standard specifications 1000.00 1 Ltr 7.95 7950.00
Providing and placing on pedestal polythelene water storage tank with double layer approved brand with cover and suitable locking arragements making necessary holes for inlet and out let arrangments and over flow pipes but without fittings etc complete
83 Construction of First Floor to Central Library As per department / standard specifications 300.00 1 Rmt 86.57 25971.00
Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.
84 Construction of First Floor to Central Library As per department / standard specifications 270.00 1 Rmt 91.16 24613.00
Supply and Fixing of 25mm dia 2mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.
85 Construction of First Floor to Central Library As per department / standard specifications 180.00 1 Rmt 83.94 15109.00
Supply and Fixing of 20mm dia 1.5mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.
86 Construction of First Floor to Central Library As per department / standard specifications 14.00 Each 314.96 4409.00
Supply and fixing of P.V.C fan hooks of 15mm dia M.S bar grouted in R.C.C slab with making the site as original incluidng fixing charges etc complete
87 Construction of First Floor to Central Library As per department / standard specifications 46.00 Each 610.11 28065.00
Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings
88 Construction of First Floor to Central Library As per department / standard specifications 16.00 Each 867.67 13883.00
Wiring with 2 of 14/0.3mm (1.0 Sq.mm) P.V.C. insulated F.R. flexible copper cable (ISI MARK) in existing pipe with 6A switch control and 3/2 pin sockets fixing on separate board including all labour charges etc., complete.
89 Construction of First Floor to Central Library As per department / standard specifications 14.00 Each 140.00 1960.00
Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete.
90 Construction of First Floor to Central Library As per department / standard specifications 7.00 Each 218.37 1529.00
Supply and fixing of 16A 3pin / 6A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (5 in one) on decolam sheet covered board separate including earth connection and all labour charges etc., complete on wall.
91 Construction of First Floor to Central Library As per department / standard specifications 450.00 1 Rmt 52.26 23517.00
Supply and run of 2 of 22/0.3mm (1.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.
92 Construction of First Floor to Central Library As per department / standard specifications 450.00 1 Rmt 67.62 30429.00
Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.
93 Construction of First Floor to Central Library As per department / standard specifications 450.00 1 Rmt 26.52 11932.00
Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for earth continuity including all labour charges etc., complete.
94 Construction of First Floor to Central Library As per department / standard specifications 14.00 Each 2292.30 32092.00
Supply of 900 mm (36") / 1200 mm (48") / 1400 mm (56") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessories.
95 Construction of First Floor to Central Library As per department / standard specifications 4.00 Each 3518.29 14073.00
Supply and erecting exhaust fan heavy duty 250V A.C 50 cycles 375mm (15") 1400 RPM with condensor and without regulator complete errected in position with necessary materials, fan motar with moiture proof treatment and "E" class insulation and painted with lattering by enamel paint the Sr. No. and date of errection including cost and conveyance of all materials and labour charges etc complete (Item No.9.7.20)
96 Construction of First Floor to Central Library As per department / standard specifications 46.00 Each 604.43 27804.00
Supply and Transportation of 1x36/40W box type tube light luminaire with copper / VPIT Choke, condensor, starters etc., and 1No 36/40W tube etc., complete.
97 Construction of First Floor to Central Library As per department / standard specifications 3.00 Each 3970.84 11913.00
Supply and fixing SPN Distribution board with IP-20 protection suitable for single phase Earth Leakage Circute Braker (ELCB) / Residual Current Circute Braker (RCCB) / Double Pole (DP) Isolator as incomer and 10kA SP MCBs as out going including internal connections , cost and conveyance of all materials and labour charges etc., complete for finished item of work.
98 Construction of First Floor to Central Library As per department / standard specifications 1.00 Each 3541.35 3541.00
Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia \B\ class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail