Work Against Sanctiond Package No. 17 / 2020-21 & 21 / 2020-21 ( Under Deposit Scheme ) Under Electricity Urban Distribution Circle, Gorakhpur-2 Loading, unloading and Carriage of following material from Store Centre, Gorakhpur to work site:-11/0.4 KV 3-Phase 25 KVA Transformer- 1 No., ST Pole 11 Mtr long- 02 Nos., Cable Aluminium 3X70 mm2 11 KV XLPE - 220 Mtr., LT XLPE Cable Al. 3.5X70 mm2- 10 Mtr., Cable Jointing Kit (3X70 Mm2 XLPE 11 KV)- 4 Nos., ACSR Dog Conductor - 0.03 Km., 11 KV Pin Insulator with Pin- 3 Nos., 11 KV Disc Insulator with fitting- 3 Nos., Sub station base Angle- 2 No., 11 KV Top Channel- 02 No. 3 The excavation of 2 nos. foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of double Pole with fixing of necessary clamps & accessories (Top Channel, Substation base Channel etc.) as per required. All required materials such as Holding clamp/STP/LT clamp, F-Bracket, LT shackle insulator, Nuts & Bolts off size etc will be provided by the contractor. nGrouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). nMaking plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. nAll work will be done as per RESPO norms & relevent IS Specification. 4 Painting of Pole by double coating Aluminium & Red oxide paint. Paint will be provided by contractor 5 Laying of 11 KV XLPE 3.5x70 sq. mm by HDD method as per RESPO norms 6 Errection of Cable Jointing Kit 3X70 Sq.mm. & Hoisting of cable on existing double pole using G.I. Pipe 4dia (G.I. Pipe 4 Dia and other Necessary Materials excluding 11 KV XLPE Cable 3X70 mm² provided by Contractor) 7 Fabrication, errection, commissioning & testing of 25 KVA T/F on Double Pole with all accessories including make its LT and HT connection. All necessary materials such as Holding clamp, Al.Lugs, Nuts & Bolts will be supplied by the Contractor. 8 Chemical earthing of Transformer (Body+Neutral) as per IS Code 3043 - 1987 specification 9 fo|qr uxjh; forj.k [k.M&prqFkZ] xksj[kiqj ds vUrxZr tek ;kstuk ys[kkkhkZ esa Lohd`r iSdst la[;k 17@2020&21 ¼esfMdy dkyst] eksxygk] xksj[kiqj esa V~;wcosy ds fo|qrhdj.k dk dk;Z½ ds dk;ksZ dks lseh VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%& 10 Loading, unloading and Carriage of following material from Store Centre, Gorakhpur to work site:-11/0.4 KV 63 KVA Transformer- 1 No., ST Pole 11 Mtr long- 03 Nos., ACSR Weasel Conductor - 0.170 Km., 11 KV Pin Insulator with Pin- 15 Nos., 11 KV Disc Insulator with fitting- 6 Nos., Sub station base Angle- 2 No., 11 KV Top Channel- 01 No., 11 KV Dropper Angle - 2 Nos., 11 KV T-off Channel- 2 Nos., 11 KV X-arm - 1 No., 11 KV TPMO- 1 No., 11 KV Fuse set- 1 No., Stay Complete- 1 No., Earthing Complete- 3 Nos. 11 The excavation of 2 nos. foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of double Pole with fixing of necessary clamps & accessories (Dropper angle, Top Channel, Substation base Channel etc.) as per required. All required materials such as Holding clamp/STP/LT clamp, F-Bracket, LT shackle insulator, Nuts & Bolts off size etc will be provided by the contractor. nGrouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). nMaking plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. nAll work will be done as per RESPO norms & relevent IS Specification. 12 The excavation of foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of Pole with fixing of necessary clamps & accessories as per required. All required materials such as Holding clamp/STP/LT clamp, F-Bracket, LT shackle insulator, Nuts & Bolts off size etc will be provided by the contractor. nGrouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). nMaking plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. nAll work will be done as per RESPO norms & relevent IS Specification. 13 Laying, stringing, sagging, binding and jumpering of ACSR weasel conductor of LT/HT Line with providing and fixing of LT Clamps/other clamps, Shackle insulator and nuts&bolts off size by the contractor 14 Earthing of ST Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO norms. 15 Erection and grouting of stay in CC ratio 1:4:8 of Cement, Sand and Stone Ballast including cost of grouting material with nozelling and binding of stay wire (Complete work) 16 Painting of Pole by double coating Aluminium & Red oxide paint. Paint will be provided by contractor 17 Fabrication, errection, commissioning & testing of 63 KVA T/F on Double Pole with all accessories including make its LT and HT connection. All necessary materials such as Holding clamp, Al.Lugs, Nuts & Bolts will be supplied by the Contractor. 18 Erection TPMO and Fuse set 19 Chemical earthing of Transformer (Body+Neutral) as per IS Code 3043 - 1987 specification 20