Water Supply Maintenance And Repairing Works In Ward No . 66 , 70 , 71 , 72 , 73 , 100P , 103P , 104P In Zone No 09 , Excavation For Foundation / Pipe Trenches In Earth , Soils Of All Types , Sand , Gravel And Soft Murum , Including Removing The Excavated Material Upto A Distance Of 50 Metres And Lifts As Below , Stacking And Spreading As Directed , Normal Dewatering , Preparing The Bed For Foundation And Excluding Backfilling , Etc Comp . Lift 0 To 1 . 50 M Mjp/Dsr/2019-20/Page No . 34 I . No . 1 , Excavation For Foundation / Pipe Trenches In Hard Murum And Boulders , W . B . M . Road Including Removing The Excavated Material Upto A Distance Of 50 Metres And Lifts As Below , Stacking And Spreading As Directed , Normal Dewatering , Preparing The Bed For Foundation And Excluding Backfilling , Etc Comp . Lift 0 To 1 . 50 M Mjp/Dsr/2019-20/ Page No . 34 I . No . 3 , Excavation For Foundation / Pipe Trenches In Soft Rock And Old Cement And Lime Masonry Foundation Asphalt Road By All Means Including Removing The Excavated Material Upto A Distance Of 50 Metres And Lifts As Below , Stacking And Spreading As Directed , Normal Dewatering , Preparing The Bed For Foundation And Excluding Backfilling , Etc Comp . Lift 0 To 1 . 50 M Mjp/Dsr/2019-20/ Page No . 34 I . No . 5 , Providing And Supplying Asbestos Cement Pressure Pipes Manufactured And Tested As Per Iso-160 Standards Of Following Class And Diameter In Standard Lengths Including Cost Of All Taxes ( Central And Local ) , Insurance , Railway Freight , Inspection Charges , Unloading From Railway Wagon , Loading Into Truck , Transporting To Departmental Store/Site , Unloading , Stacking Etc . Complete Mjp/Dsr/2019-20/Page No . 57 . I . No . 1 , 80Mm , 100Mm , 150Mm , 200Mm , Lowering , Laying And Jointing With Cid Joints , A . C . Pressure Pipes And Ci Or Ms Specials Of Following Class And Diameters Including Conveyance From Stores To Site Of Works , Cost Of Labour And Material , Giving Satisfactory Hydraulic Testing , Etc . As Per Isi Code , Etc . Complete But Excluding Cost Of C . I . D . Joints , Nut Bolts , Rubber Rings . Mjp/Dsr/2019-20/ P . No . 59 I . No . 4 ( A ) , 100Mm , 150Mm , 200Mm , Cutting And Champhering Of Pipes Of Following Diameters Including Cost Of All Materials And Labour Involved , Etc . Complete As Directed By Engineer-In-Charge . ( For All Class Of Pipes ) Mjp/Dsr/2019-20/Page No . 228 I . No . 20 , 100 Mm , 150 Mm , 200 Mm , Providing And Supplying C . I . Detachable Joints Suitable For A . C . Pressure Pipes Manufactured As Per Is- 1538 / 1993 Standards Of Following Class And Dimeter Including Cost Of Insurance , Railway Freight , Inspection Charges , Unloading From Railway Wagon , Loading Into Truck , Transporting To Departmental Store , Unloading , Stacking And Cost Of Rubber Rings , Nut Bolts , Excluding Gst Levied By Goi & Gom In All Respect Etc . Complete . Mjp/Dsr/2019-20/Page No . 69 I . No . 13 , 100 Mm , 150 Mm , 200 Mm , Checking And Repairing Private Water Connection And Reconnecting The Same Disconnection Of Unauthorise Private Connection Etc Complete , Removing Existing Cross Connection And Remaking The Same Etc Complete ( 70% Rate Of Making Cross Connection . ) Mjp/Dsr/2018-2019/Page No . 47 . I . No . 10 , 100 Mm , 150 Mm , 200 Mm , Removing And Refixing The Half Body Of Sluice Valves Including Excavation , Refilling , Cost Of Rubber Packing , Nut Bolts , With Gate , Gland Rope , Repair By Welding Etc Complete ( 70 % Rate Of Laying Sluice Valves ) Mjp/Dsr/2019-20/ Page No . 131 I . No . 4 , 100 Mm , 150 Mm , 200 Mm , Providing And Supplying S . S . Spindle Rod As Per Standard Specifications And Suitable For Sluice Valves Etc Complete . ( As Per Market Rate ) , 100Mm , 150Mm , 200Mm , Providing And Supplying Gun Metal Check Nut Of Following Diameter Of Sluice Valves As Per Standard Specifications , Etc . Complete , 100Mm , 150Mm , 200Mm , Providing And Supplying M . S . Clamp For Pipes Of Following Diameters Etc Comp . ( As Per Market Rate ) , 100 Mm , 150 Mm , 200 Mm , Welding In All Position With Required Number Of Runs , For M . S . Pipes Internally And Externally Including Wherever Necessary , Fixing Appurtenances And Other Accessories In Connection With Pipe Laying Work As Per Specification , As Per Mjp Dsr 2019-20 , Page No 280 , 10 Mm , Refilling The Trenches With Available Excavated Stuff With Soft Material First Over Pipeline And Then Hard Material In 15 Cm Layers With All Leads And Lifts Including Consolidation , Surcharging , Etc . Complete . Mjp/Dsr/2019-20/Page No . 37 I . No . 15