South East Central Railway-SECR has published Tender For S&T Cables Clearance In The Yard (Home To Home Signal) To Facilitate The Engineering Earthwork , Yard Remodeling Work And Installation/Testing/Commissioning Of New Distributed Electronic Interlocking Of Robertson, Kharsia, Jharadih & Sakti Stat. Submission Date for this Tender is 23-07-2020. Railway Signaling Systems Tenders in Chhattisgarh. Bidders can get complete Tender details and download the document.
0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | |
---|---|---|---|---|---|---|---|---|---|
0 | S.No. | Item\rCode | Item Qty | Qty Unit | Unit Rate | Basic Value | Escl.(%) | Amount | Bidding\rUnit |
1 | Schedule A-Execution of Out Door Signalling work | 43727110.00 | Above/\rBelow/Par | ||||||
2 | 1 | 1 | 8.00 | Kilometre | 89000.00 | 712000.00 | AT Par | 712000.00 | |
3 | Description:- Excavation\roftrenchandclearingofrootsoftrees,bushes,ballastandreconditioningetc.,\rincluding bailing out water and disposal of extra soil. (i) all soils including soft rocky area. (a) Depth 1.2 Mtr. &\rwidth 0.3 Mtr. | ||||||||
4 | 2 | 2 | 16.00 | Kilometre | 74000.00 | 1184000.00 | AT Par | 1184000.00 | |
5 | Description:- Excavation\roftrenchandclearingofrootsoftrees,bushes,ballastandreconditioningetc.,\rincluding bailing out water and disposal of extra soil. (i) all soils including soft rocky area. (b) Depth 1.0 Mtr. &\rwidth 0.3 Mtr. | ||||||||
6 | 3 | 3 | 4.00 | Kilometre | 178000.00 | 712000.00 | AT Par | 712000.00 | |
7 | Description:- Excavation\roftrenchandclearingofrootsoftrees,bushes,ballastandreconditioningetc.,\rincluding bailing out water and disposal of extra soil.(i) all soils including soft rocky area. (c) Depth 1.2 Mtr. & width\r0.6 Mtr. | ||||||||
8 | 4 | 4 | 4.00 | Kilometre | 148000.00 | 592000.00 | AT Par | 592000.00 | |
9 | Description:- Excavation\roftrenchandclearingofrootsoftrees,bushes,ballastandreconditioningetc.,\rincluding bailing out water and disposal of extra soil. (i) all soils including soft rocky area. (d) Depth 1.0 Mtr. &\rwidth 0.6 Mtr. | ||||||||
10 | 5 | 5 | 100.00 | Metre | 111.00 | 11100.00 | AT Par | 11100.00 | |
11 | Description:- Excavation\roftrenchandclearingofrootsoftrees,bushes,ballastandreconditioningetc.,\rincluding bailing out water and disposal of extra soil.(ii) Hard rocky area including concreting.(a) Chase cutting and\rsmoothening of inside surface of sizes 0.08 m deep and 0.17 m width at platform and cemented floor area. | ||||||||
12 | 6 | 6 | 1000.00 | Metre | 152.00 | 152000.00 | AT Par | 152000.00 | |
13 | Description:- Excavation\roftrenchandclearingofrootsoftrees,bushes,ballastandreconditioningetc.,\rincluding bailing out water and disposal of extra soil. (ii) Hard rocky area including concreting.(b) Chiseling up to a\rdepth of 0.7 M and width 0.3 M at the bottom (for multiple cable) with JCB/mechnical means for soft rocky area/\rmurum/concrete structure etc. | ||||||||
14 | 7 | 24.00 | Numbers | 548.00 | 13152.00 | AT Par | 13152.00 |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail