| 1 | 1 | (i)Excavating trenches upto a depth of 1.65M in Non Rocky Soil and back filling the excavated trenches after laying the HDPE / PLBpipe with or without protection as per tender specification. | BI01010001010000000000000515BI0100001115 | 7258 | Meter |
|---|
| 2 | 2 | Laying of PLB pipe duct through HDD/Manual tunneling/Bucky method at a Depth of 2M or more. | BI01010001010000000000000515BI0100001116 | | |
|---|
| 3 | 2.01 | i) Single PLB pipe. | BI01010001010000000000000515BI0100001117 | 4930 | Meter |
|---|
| 4 | 2.02 | i) Laying of single HDPE / PLBPipes/Coils, coupled with coupler. | BI01010001010000000000000515BI0100001118 | 7258 | Meter |
|---|
| 5 | 2.03 | The department will supply HDPE /PLB Pipe in coils of various length, HDPE / PLBSockets/Coupler, End caps. | BI01010001010000000000000515BI0100001119 | | |
|---|
| 6 | 2.04 | The Department will supply G.I. Pipes in lengths of approx. 6 M, HDPE / PLBPipes/Coils. | BI01010001010000000000000515BI0100001120 | | |
|---|
| 7 | 3 | (ii)Opening of Manholes, Pulling of O.F. Cable Sealing of HDPE / PLB Pipes by Rubber Bushes in Manholes, providing HDPE/RCC/DWC Split Pipes in manhole/Back Filling of Manholes. | BI01010001010000000000000515BI0100001121 | 27062 | Meter |
|---|
| 8 | 3.01 | The Department will supply O.F. Cable, Rubber Bush, Split RCC/DWC, HDPE / PLBPipes Clamps. All other materials required for the work shall be arranged by the contractor. | BI01010001010000000000000515BI0100001122 | | |
|---|
| 9 | 4 | Splicing of all the fibres of OF cable laid at every joint and making terminations at the ends (a) For 24 F | BI01010001010000000000000515BI0100001123 | 14 | per Joint termination |
|---|
| 10 | 4.01 | The Department will supply Jointing Kit only. All other materials required for the work shall be arranged by the contractor. | BI01010001010000000000000515BI0100001124 | | |
|---|
| 11 | 5 | Digging of pit for jointing chamber construction of brick chamber, fill- ing of brick Chamber with clean sand, supply and placing of stone slabs on brick chamber, and back filling of jointing pit. | BI01010001010000000000000515BI0100001125 | 14 | per Jointing Chamber |
|---|
| 12 | 5.01 | All materials required for the work shall be arranged by the contractor. | BI01010001010000000000000515BI0100001126 | | |
|---|
| 13 | 6 | i) Digging of pit 1 meter towards jungle side on each manhole/joint chamber for fixing of route/joint indicator ,fixing and concreting route/joint indicator, Painting and sign writing of route/joint indicators.The work should be done as per tender speci | BI01010001010000000000000515BI0100001127 | 135 | Per Indicator |
|---|
| 14 | 6.01 | Supply of route indicator as per tender specification at site. | BI01010001010000000000000515BI0100001128 | 135 | per No. |
|---|
| 15 | 7 | Documentation (6 set of bound hard copies of documents & one soft copy for each route. | BI01010001010000000000000515BI0100001129 | 12.188 | Per Km. |
|---|
| 16 | 7.01 | The contractor shall arrange all materials required for the work. | BI01010001010000000000000515BI0100001130 | | |
|---|
| 17 | 8 | Splicing of all the fibers of 24 F OF Cable in the fiber Termination Box at the Gram Penchants and testing all the fibers for continuity. This will also include installation /mounting of the FTB and spare cable Chamber as specified | BI01010001010000000000000515BI0100001131 | 11 | Per FTB |
|---|