Urgent Cable Laying And Allied Works In Am East Area Of Jaipur Ssa , Boring , Road Crossing Through Mechanised Horizontal Boring ( 40 / 65 / 120 Mm Dia . ) Method The Minimum Depth Of Cable Pulled / Laid Will Be 100 Cm . For More Than 18 Meter Wide Road Crossings Only , Horizontal Boring By Manual Moling Of 40 / 65 / 110 Mm Dia At Depth Of 100 Cm Depth . , Horizontal Boring By Manual Moling Of 40 / 65 / 110 Mm Dia At Depth Of 60 Cm Depth . , Laying & Fixing Of Gi Pipes On Bridges & Culverts . ( The Department Will Supply Only Gi Pipes In Length Of Approximately 6Meters ) , Above 80 Mm Dia , Cable Laying / Recovery / Protection , Pulling & Laying U / G Cables In Trenches , Boring / Molinigs & Pipes ( The Department Will Supply Only U . G . Cables ) , 100 / 200 Pairs , 400 Pairs , 800 Pairs , Jointing Of Cables:- ( Straight And Branch Joints ) And End To End Testing . , 200 Pairs , 400 Pairs , 800 Pairs , 1200 Pairs , Teeing , Testing And Release Of Tee ( The Department Will Supply Only Jointing Kits And Modular Connectors , If Teeing Is Asked To Be Done Using Modular Connectors . The Contractor Shall Arrange Required Tools And Other Miscellaneous Materilas Vizpvc Sleeves , Consumables Etc ) , Teeing , Testing And Release Of Tee , Pillar Work:- Construction / Shifting Of New Pillar / Cabinet Of Plinth And Earthing For Pillar ( With Matterial ) . In Construction A Cement , Sand , Concreate Plinth With Ratio 1:2:4 With Plingth Painting & Making Earth Including Cost Of Copper Wire & G . I Plate , Mini Pillar Up To 400 Pairs , Above 400 Pairs And Up To 1000 Pairs , Pillar Rearrangement By Doing Straight Jumpering Including Documentation ( One Jumper Means Jumpering Of One Pair From Primary Side To One Pair Of Distribution Side In The Pillar ) , Miscellenous Work , Fixing Of Crone Type Ct Box On Wall And Termination Of 20 / 50 / 100 Pair Cable ( With Material For Fixing ) , Other Maintenance Items ( Only For Mtce . Tender ) , Excavation Pits For Cable Joints ( In All Kind Of Soil ) Size Of Pits ( 1 . 2 X 1 . 2 X 1 . 2 Metre . ) , Care Taking Of Cable Joints For ( Store , Tent And Tools Etc . ) Exposed Cable / Joints , Preparation For Cable Joints For Preparation Of Cable And Testing Including Opening And Closing Of Joints , ( 3 ) Up To 400 Pairs , ( 4 ) Above 400 Pairs , Preparation For Cable Joints For Teeing Of Cable Including Teeing , ( 1 ) Up To 400 Pairs , ( 2 ) Above 400 Pairs