}

Works Contract In Respect Of West/Attur Sub- Division, Attur-Tamil Nadu

Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Works Contract In Respect Of West/Attur Sub- Division. Submission Date for this Tender is 06-07-2020. Miscellaneous Fasteners Tenders in Attur Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

24656948
Works Contract In Respect Of West/Attur Sub- Division
Open Tender
Indian
Tamil Nadu
Attur
06-07-2020

Tender Details

Works Contract In Respect Of West / Attur Sub- Division-1 Transporting of poles/Materials/Conductors 2 Below 8 Kms 3 Above 8 Kms for additional Km 4 Transporting of poles from road side to pole pit for 30 and above including RSJ Pole 5 Loading/Unloading of Poles 6 Loading of Poles upto 27 7 Loading of Poles upto 30/RSJ Pole 8 Unloading of Poles upto 27 9 Unloading of Poles upto 30/RSJ Pole 10 Excavation of Pole/Stay pits 11 Excavation of pole pit up to 27”(8.0m) pole 12 Stay bit 4.5” to 5” depth 13 Excavation of pole pit up to 9.14 Mtr pole 14 Excavation of RSJ Pole pit above 36 15 Hard rock with out blasting 16 Hard Rock Requires Blasting 17 Medium rock and Dense Medium rock requires blasting 18 Erection of Poles 19 RCC poles/Metal pole up to 8.00m (27’) 20 RCC poles/Metal pole up to 9.14.m(30’) 21 RSJ Rail fabricated poles above 30 (9.14 mtr) 22 RSJ Rail fabricated poles above 36 23 Erection of stay set complete 24 Concreting of Poles 25 Mass concreting including materials ( Cement 1/2 bag + river sand and blue metals and watering) 26 Sleeve concreting 27 Fixing of line materials 28 HT V Cross arms / Channel Cross arms / Guarding Cross arm 4 1/2 29 LT 3 Phase cross arm 30 LT single Phase cross arm 31 HT / LT TI Fitting 32 Fixing of HT Pin Insulators (11/22/33KV) 33 Fixing of HT 11KV strain disc 34 Fixing of LT Pin Insulators 35 Fixing of LT Shackle 36 Fixing of Aluminium knob 37 Earthing of Pole with Pin Including burying looping and binding 38 Paving and Stringing of conductor 39 Paving of conductor ,Stringing , binding , Jumpering etc..7/4.09mm ACSR 40 7/3.35mm ACSR 7/3.15mmAAAC 41 7/2.59mm ACSR & 7/2.11mm ACSR 42 Guarding Arrangements 43 LT Split neutral guarding 44 HT Guarding 45 Structure Erection 46 Structure poles ,fixing of top channel seating ,wiring earthing , fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos, earth pits with tubes including painting of metal parts, structure poles, fixing of top channel seating channel, belting angle (except erection of transformer ) 47 DP Erection 48 Erection of D.P structure with AB switch top channel , cross bracing ,Earthing, Painting, providing stay and pole concreting 49 Erection of Transformer 50 Loading and unloading of Transformer upto 200 KVA 51 Loading and unloading of Transformer above 200 KVA 52 Erection of New Transformer upto 200 KVA 53 Replacement of failed Transformers upto 200 KVA 54 Loading & Erection of HT Metering Set 55 Conversion of Pin Point to Cut Point 56 (A) L.T 57 Removing the Pin 58 Fixing the shackle 59 Re-Sagging (LT) 60 (B) H.T 61 Removing the Pin 62 Fixing the Strain Disc 63 Service Connections 64 Erection of street light including fixture fitting 65 Erection of Street light service 66 Fixing of new SV/MV lamp fittings 67 Releasing of grills from RCC Poles 68 Agriculture service fixing/Service 69 Releasing of Single Phase service wire and refixing 70 Releasing of Three Phase service wire and refixing 71 Labour Charges for Alteration of Clamps to suit for the works 72 Back Clamp 73 Stay Clamp 74 Erection of new earth pipe by replacing the corroded earth pipe 75 Re-stringing of LT line for all sizes of conductor 76 Re-stringing of HT line for all sizes of conductor 77 Provinding LT Bus bar arrangement in Distn.Tr Structures 78 Fencing of Distribution Transformer Structure at Road side fabrication and erection 79 Erection of New 10 Earthh pipe replacing carroded earth pipe and renewal of earthing including burying looping and binding 80 Renewal of Jumper from 22/11 KV line to AB switch to HG fuse to Distn. Transformer with PG Clamps 81 Cutting of Coconut leaves 82 Drilling of hoe in channel only 3/4 & 1 per hole 83 Cutting of flat 84 Cutting of Channel 85 Cutting of Angle 86 Cutting of Pipe 87 Dismantling of Line Materials 88 Dismantling of pole (9.14mtr) 89 Dismantling of pole (7.5mtr & 8mtr) 90 Dismantling of HT Pin Insulator 91 Dismantling of HT /LT TI Fitting 92 Dismantling of 3 PH X arm 93 Dismantling of Tapping X arm, V X arm & Guarding X arm 94 Dismantling of 1 PH X arm 95 Dismantling of Alu Knob 96 Dismantling of LT pin Insulator 97 Dismantling of LT Shackle Insulator 98 Dismantling of Stayset Complete 99 Dismantling of Line Materials & Transformers 100 Dismanlting of Single Pole Structure 101 Releasing of Conductor ACSR 7/2.11 mm & 7/2.59 mm 102 Releasing of Conductor ACSR 7/3.00 mm & 7/3.35 mm 103 E.S.I. @ 3.25 % should be Entered by the Bidder. 104 E.P.F. @ 13 % should be Entered by the Bidder. 105 G.S.T. @ 18% should be Entered by the Bidder.

Key Value

Document Fees
Refer document
EMD
INR 24800.0 /-
Tender Value
INR 24.78 Lakhs /-

BOQ Items

Name of Work: - Works Contract in respect of West/Attur Sub- Division
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Transporting of poles/Materials/Conductors
2 2 Below 8 Kms 100 Per Tonne
3 3 Above 8 Kms for additional Km 120 Per Tonne
4 4 Transporting of poles from road side to pole pit for 30 " and above including RSJ Pole 250 Per Pole
5 5 Loading/Unloading of Poles
6 6 Loading of Poles upto 27" 250 Per Pole
7 7 Loading of Poles upto 30"/RSJ Pole 120 Per Pole
8 8 Unloading of Poles upto 27" 250 Per Pole
9 9 Unloading of Poles upto 30"/RSJ Pole 120 Per Pole
10 10 Excavation of Pole/Stay pits
11 11 Excavation of pole pit up to 27”(8.0m) pole 250 Each Pit
12 12 Stay bit 4.5” to 5” depth 250 Each Pit
13 13 Excavation of pole pit up to 9.14 Mtr pole 100 Each Pit
14 14 Excavation of RSJ Pole pit above 36" 20 Each Pit
15 15 Hard rock with out blasting 30 Each Pit
16 16 Hard Rock Requires Blasting 30 Each Pit
17 17 Medium rock and Dense Medium rock requires blasting 25 Each Pit
18 18 Erection of Poles
19 19 RCC poles/Metal pole up to 8.00m (27’) 250 Each Pole
20 20 RCC poles/Metal pole up to 9.14.m(30’) 100 Each Pole
21 21 RSJ Rail fabricated poles above 30" (9.14 mtr) 10 Each Pole
22 22 RSJ Rail fabricated poles above 36" 10 Each Pole
23 23 Erection of stay set complete 250 Each Stay
24 24 Concreting of Poles
25 25 Mass concreting including materials ( Cement 1/2 bag + river sand and blue metals and watering) 20 Per Pole
26 26 Sleeve concreting 10 Per Pole
27 27 Fixing of line materials
28 28 HT V Cross arms / Channel Cross arms / Guarding Cross arm 4 1/2 150 Each
29 29 LT 3 Phase cross arm 400 Each
30 30 LT single Phase cross arm 350 Each
31 31 HT / LT TI Fitting 100 Each
32 32 Fixing of HT Pin Insulators (11/22/33KV) 630 Each
33 33 Fixing of HT 11KV strain disc 270 Each
34 34 Fixing of LT Pin Insulators 400 Each
35 35 Fixing of LT Shackle 600 Each
36 36 Fixing of Aluminium knob 550 Each
37 37 Earthing of Pole with Pin Including burying looping and binding 150 Each
38 38 Paving and Stringing of conductor
39 39 Paving of conductor ,Stringing , binding , Jumpering etc..7/4.09mm ACSR 500 Per Wire Per Span
40 40 7/3.35mm ACSR 7/3.15mmAAAC 500 Per Wire Per Span
41 41 7/2.59mm ACSR & 7/2.11mm ACSR 600 Per Wire Per Span
42 42 Guarding Arrangements
43 43 LT Split neutral guarding 120 Per Span
44 44 HT Guarding 30 Per Span
45 45 Structure Erection
46 46 Structure poles ,fixing of top channel seating ,wiring earthing , fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos, earth pits with tubes including painting of metal parts, structure poles, fixing of top channel seating channel, belting angle (except erection of transformer ) 10 Per Str
47 47 DP Erection
48 48 Erection of D.P structure with AB switch top channel , cross bracing ,Earthing, Painting, providing stay and pole concreting 6 Per Str
49 49 Erection of Transformer
50 50 Loading and unloading of Transformer upto 200 KVA 10 Each
51 51 Loading and unloading of Transformer above 200 KVA 10 Each
52 52 Erection of New Transformer upto 200 KVA 10 Each
53 53 Replacement of failed Transformers upto 200 KVA 10 Each
54 54 Loading & Erection of HT Metering Set 10 Each
55 55 Conversion of Pin Point to Cut Point
56 56 (A) L.T
57 57 Removing the Pin 250 Each
58 58 Fixing the shackle 500 Each
59 59 Re-Sagging (LT) 1330 Per Wire Per Span
60 60 (B) H.T
61 61 Removing the Pin 250 Each
62 62 Fixing the Strain Disc 250 Each
63 63 Service Connections
64 64 Erection of street light including fixture fitting 50 Each
65 65 Erection of Street light service 100 Each
66 66 Fixing of new SV/MV lamp fittings 50 Each
67 67 Releasing of grills from RCC Poles 500 Each
68 68 Agriculture service fixing/Service 30 Each
69 69 Releasing of Single Phase service wire and refixing 50 Each
70 70 Releasing of Three Phase service wire and refixing 45 Each
71 71 Labour Charges for Alteration of Clamps to suit for the works
72 72 Back Clamp 25 Each
73 73 Stay Clamp 25 Each
74 74 Erection of new earth pipe by replacing the corroded earth pipe 10 Each
75 75 Re-stringing of LT line for all sizes of conductor 25 Per Wire Per Span
76 76 Re-stringing of HT line for all sizes of conductor 10 Per Wire Per Span
77 77 Provinding LT Bus bar arrangement in Distn.Tr Structures 15 Per DT
78 78 Fencing of Distribution Transformer Structure at Road side fabrication and erection 5 Per Struct
79 79 Erection of New 10' Earthh pipe replacing carroded earth pipe and renewal of earthing including burying looping and binding 10 Per Struct
80 80 Renewal of Jumper from 22/11 KV line to AB switch to HG fuse to Distn. Transformer with PG Clamps 10 Per Struct
81 81 Cutting of Coconut leaves 50 Per Tree
82 82 Drilling of hoe in channel only 3/4" & 1" per hole 300 Each
83 83 Cutting of flat 20 Each
84 84 Cutting of Channel 20 Each
85 85 Cutting of Angle 20 Each
86 86 Cutting of Pipe 10 Each
87 87 Dismantling of Line Materials
88 88 Dismantling of pole (9.14mtr) 25 Each
89 89 Dismantling of pole (7.5mtr & 8mtr) 200 Each
90 90 Dismantling of HT Pin Insulator 125 Each
91 91 Dismantling of HT /LT TI Fitting 40 Each
92 92 Dismantling of 3 PH X arm 50 Each
93 93 Dismantling of Tapping X arm, V X arm & Guarding X arm 50 Each
94 94 Dismantling of 1 PH X arm 150 Each
95 95 Dismantling of Alu Knob 100 Each
96 96 Dismantling of LT pin Insulator 200 Each
97 97 Dismantling of LT Shackle Insulator 100 Each
98 98 Dismantling of Stayset Complete 50 Each
99 99 Dismantling of Line Materials & Transformers 2 Per DT
100 100 Dismanlting of Single Pole Structure 10 Per Struct
101 101 Releasing of Conductor ACSR 7/2.11 mm & 7/2.59 mm 56 Per Wire Per Span
102 102 Releasing of Conductor ACSR 7/3.00 mm & 7/3.35 mm 70 Per Wire Per Span
103 103 E.S.I. @ 3.25 % should be Entered by the Bidder. 1 Percentage
104 104 E.P.F. @ 13 % should be Entered by the Bidder. 1 Percentage
105 105 G.S.T. @ 18% should be Entered by the Bidder. 1 Percentage
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail