| 1 | 2 | Group-A, Ashok Nagar GA | Item 0001 | | |
|---|
| 2 | 3 | PE Laying, LMC & DMA - Works in the state of MADHYA PRADESH (ASHOK NAGAR GA) | Item 0002 | | |
|---|
| 3 | 4 | PE Laying, LMC & DMA | Item 0003 | | |
|---|
| 4 | 5 | PART -I (PE Section) | Item 0004 | | |
|---|
| 5 | 6 | PE Pipe line laying in all type of surface using any laying methodology | Item 0005 | | |
|---|
| 6 | 7 | Receiving, handling, loading, transportation and unloading of owner supplied PE pipes from Owner's designated stock yards to Contractor's own stock-yards / work-sites. Proper storing, stacking, identification, providing security and insurance cover for the materials. Procurement and Installation of PE Fittings, PE Valves, Transition Fittings, Warning Mats, HDPE casing Pipes, Half concrete sleeves and other items required for execution shall also be in Contractor's scope. Preparation of detailed route plan, making trial pits to determine the underground utilities/ services etc. {Liasioning shall be carried out by the contractor to complete the project in totality, payment for same will be released as per the separate item rate mentioned in SOR.} Restoration of the abandoned excavation / trial pits (excavated to depth of 1.5 m or more as per satisfaction to Engineer- Inched (EIC)) to original condition, barricading the work area as per the procedures & drawings provided in the tender and as per the directions of EIC. Dewatering of trenches / pits if required as per site condition. Repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner / other utility agencies). Trenching to the required depth in all type of surface (however putting up sufficient protection / casings without any additional cost at locations where proper depth cannot be attained), uncoiling / stringing of pipes, jointing of the pipe ends / fittings / valves by qualified personnel, using approved electro fusion techniques as per the specification. Separate SOR item rate is taken for Hard rock. | Item 0006 | | |
|---|
| 7 | 8 | Preparation and getting approval of schedules, execution procedures, drawings / sketches. Finalizing optimum route with consent of EIC. | Item 0007 | | |
|---|
| 8 | 9 | Lowering the PE pipe line in trench, padding around pipeline with suitable soil, laying of PE warning mat over the pipeline along the complete route and backfilling with available excavated material, if suitable, after screening or procurement of suitable sand / soil as per directions of EIC. Compaction with manual technique / jumping jack compactor and water at subsequent layers of 150mm, placement of all tiles / slabs / kerb stones etc. removed during excavation. Roads, pavements, footpaths etc. shall be made motorable wherever pipeline is laid. Restoration Charges for all tiles / slabs / Kerb stones etc. will be paid over and above with the separate SOR item rate. Cleaning the area of all unserviceable materials, debris, excess earth near trenches to the designated disposal area as per specifications, instructions of land owners / EIC to the complete satisfaction of local authorities. The laying shall be carried out by any methodology as per specification in consultation with EIC. The list of areas where the pipeline to be laid/ allocation of work will be done after awarding of the tender. The quantities are tentative and it may be changed during the tenure of contract as per the requirement of the Owner. | Item 0008 | | |
|---|
| 9 | 10 | Procurement & installation of GI Sleeves, 2.5\" NB x 300 mm length to 3\" NB x 300 mm length GI Sleeve / Half Round Concrete Sleeves for domestic, commercial and industrial installations as per Instruction of EIC for satisfactory completion of job. Excavation, breaking through any obstructions, insertion of pipe, sealing the annulus, firm fixing of the sleeves with concrete mix, preparation of pedestal & restoration of excavated pits within the size of pedestal & the same pit with the laying of pipe as defined in technical specification / instruction of EIC. | Item 0009 | | |
|---|
| 10 | 11 | Preparation, Certification and submission of (DPR) daily progress reports, graphs, As-built drawings, crossings details, utility graphs and deviation statements. Restore all surrounding ground features to that as existing before and as directed by EIC, which would include replanting of any uprooted trees etc. Pneumatic testing and commissioning as per specification and approved procedures, providing all tools and tackles, test ends, Nitrogen, instruments, manpower and other related accessories as per the instructions of the EIC. Returning of all unused material to Owner stores on completion of Gas Charging. Submission of all documents required for contract closure as mentioned in the contract. Any other activities related to operation / safety / statutory / maintenance of the works not mentioned above shall also be covered under the Scope of work and has to be completed by the Contractor within specified schedule without any extra cost to Owner. | Item 0010 | | |
|---|
| 11 | 12 | Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by EIC. | Item 0011 | | |
|---|
| 12 | 13 | Handing over the completed works to Owner for their operation and reconciliation of material area wise | Item 0012 | | |
|---|
| 13 | 14 | Includes laying of pipeline in all type of surface i.e. all kinds including Kutcha, metal, concrete (PCC/RCC), bituminous, tiled, brick lined etc. after raking up of hard surface of any type. Roads, Pavement, Footpaths etc. shall be made motorable once the pipeline is laid. | Item 0013 | | |
|---|
| 14 | 15 | Laying using any method (Open trench including chipping method, Moling and/or HDD) with or without casing, it Includes survey of the under ground utilities, submission of site plans/layout drawings and HDD profiles for approval by EIC, execution of the work as per the specification, including excavation of the pits, moling with hole size not exceeding 20% of the the pipe dia. Jointing and insertion of the carrier pipe in casing pipe (on case to case basis) and subsequent backfilling, compaction, submission of as-graphs and as-built drawings as per the attached specification and the instruction of EIC/ Owner. | Item 0014 | | |
|---|
| 15 | 16 | Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to Owner. All the work shall be executed in accordance with the provision of contract. | Item 0015 | | |
|---|
| 16 | 17 | 20 mm dia.(Service line) | Item 0016 | 912 | M |
|---|
| 17 | 18 | 32 mm dia. | Item 0017 | 4103 | M |
|---|
| 18 | 19 | 63 mm dia. | Item 0018 | 1824 | M |
|---|
| 19 | 20 | PE Pipe line laying in all type of surface by open trench method | Item 0019 | | |
|---|
| 20 | 21 | Laying of pipeline in all type of surface by open trench method after raking up of surface of any type . Roads, Pavement, Footpaths, Kutcha etc. shall be made motorable once the pipeline is laid. The other activities are as per SOR Item No. 1 and as detailed in specification and as per the instructions of the EIC / Site engineer of Owner. | Item 0020 | | |
|---|
| 21 | 22 | 90 mm dia. | Item 0021 | 456 | M |
|---|
| 22 | 23 | 125 mm dia. | Item 0022 | 684 | M |
|---|
| 23 | 24 | PE Pipe line laying by Trenchless Method, without casing | Item 0023 | | |
|---|
| 24 | 25 | Survey of the under ground utilities, submission of profile for approval, execution of the work as per the standard procedure attached, including excavation of the pits, Jointing and insertion of the carrier pipe, subsequent backfilling, compaction, submission of as built graphs as per attached specification and the instruction of EIC / Site Engineer of Owner. The all other activities as described in the SOR Item No. 1 which will be required to complete the work in all respect shall be scope of the Contractor within the quoted rates. | Item 0024 | | |
|---|
| 25 | 26 | 90 mm dia. | Item 0025 | 365 | M |
|---|
| 26 | 27 | 125 mm dia. | Item 0026 | 548 | M |
|---|
| 27 | 28 | PE Pipe line laying by Trenchless Method, with casing (Including supply & installation of HDPE casing pipe) | Item 0027 | | |
|---|
| 28 | 29 | Survey of the under ground utilities, submission of profile for approval, execution of the work as per the standard procedure attached, including excavation of the pits, Jointing and insertion of the carrier pipe, subsequent backfilling, compaction, submission of as built graphs as per attached specification and the instruction of EIC / Site Engineer of Owner. The all other activities as described in the SOR Item No. 1 which will be required to complete the work in all respect shall be scope of the Contractor within the quoted rates. | Item 0028 | | |
|---|
| 29 | 30 | 90 mm dia. | Item 0029 | 92 | M |
|---|
| 30 | 31 | 125 mm dia. | Item 0030 | 137 | M |
|---|
| 31 | 32 | Restoration of Trenches / Pits | Item 0031 | | |
|---|
| 32 | 33 | Restoration of different surfaces encountered while trenching to be included.\nRestoration of the roads, pavements, channels, footpaths, tiles, stones etc. to original condition including supply of the approved quality material required to complete the activities mentioned above as per local authorities norms, obtaining NOC from concerned local authorities / land owners / third party inspection agencies (if any) designated by owner and to? the satisfaction of Engineer-in-charge. | Item 0032 | 83 | CUM |
|---|
| 33 | 34 | Excavation of Hard rock: | Item 0033 | | |
|---|
| 34 | 35 | If any hard rock strata / large boulders is encountered during excavation exceeding 1.0 m in any direction of the trench and removable only by pneumatic chisel / drill / Rock breaker as per the specifications and direction of EIC & procurement of approved coarse sand (Size 0.6-2 mm as per IS 383) free from any impurities like clay, mica and soft flaky pieces. The approved packing sand shall be placed to a minimum thickness of 150mm around the pipe in case of rocky terrain. The rates are payable over and above the Laying rates as per relevant SOR item. | Item 0034 | | |
|---|
| 35 | 36 | Excavation of Hard Rock: | Item 0035 | 229 | CUM |
|---|
| 36 | 37 | Installation of valve Chambers (Including supply of PE valve of all sizes as per SOR Item No. 17,18,19, 22, 23, 26,27,30 & 31): | Item 0036 | | |
|---|
| 37 | 38 | All civil works including procurement of materials, excavation of pit, piping supports including all PCC, RCC and Brick works for valve pits, pedestals with insert plates as required, sealing of pipes in pits, providing cover etc., finishing, clean up and restoration. The work shall be executed as per specification. | Item 0037 | | |
|---|
| 38 | 39 | Brick Valve Chambers - Size (L x W) - 1.5 m x 1.5 m | Item 0038 | 2 | EA |
|---|
| 39 | 40 | RCC Valve Chambers - Size (L x W) - 1.5 m x 1.5 m | Item 0039 | 1 | EA |
|---|
| 40 | 41 | Brick Valve Chambers - Size (L x W) - 1.5 m x 1.0 m | Item 0040 | 2 | EA |
|---|
| 41 | 42 | RCC Valve Chambers - Size (L x W) - 1.5 m x 1.0 m | Item 0041 | 2 | EA |
|---|
| 42 | 43 | RCC Pre Cast Chambers - Size (L x W) - 1.5 m x 1.5 m | Item 0042 | 1 | EA |
|---|
| 43 | 44 | RCC Pre Cast Chambers - Size (L x W) - 1.5 m x 1.0 m | Item 0043 | 1 | EA |
|---|
| 44 | 45 | Fabrication & Installation of Pipeline Markers: | Item 0044 | | |
|---|
| 45 | 46 | Procurement and Installation of Route Markers / Pole Markers / Plate Markers as per the attached drawings, along the route / along boundary wall, lamp posts including all associated civil works such as excavation and construction in all types of soils, construction of pedestals and grouting with concrete, cleaning, procurement and application of approved colour and quality of primer and paint, stencil letter cutting of numbers, direction, chainage etc., restoration of area to original condition and performing all works as per drawings, specification and instruction of Engineer-in-Charge. | | | |
|---|
| 46 | 47 | RCC Route Markers as per Drawing | Item 0045 | 165 | EA |
|---|
| 47 | 48 | Pole markers with foundation as per Drawing or as instructions of EIC and specification. | Item 0046 | 33 | EA |
|---|
| 48 | 49 | Plate markers as per Drawing | Item 0047 | 334 | EA |
|---|
| 49 | 50 | PART -II Civil Works | Item 0048 | | |
|---|
| 50 | 51 | Foundation works: (Excavation, Providing and Laying Reinforced Cement Concrete (M-25)) | Item 0049 | | |
|---|
| 51 | 52 | Excavation in any plane & dimension including disposal of excavated earth up to any lead in all conditions, backfilling using serviceable earth and disposal of surplus and unserviceable earth. Soil to be levelled and properly compacted complete in all respect as per scope of work including brick soiling and PCC, technical specification and directions of EIC. Providing and laying REINFORCED CEMENT CONCRETE (RCC) of M-25 Grade (Concrete shall be design mix / nominal mix) with 20mm & down size graded crushed stone aggregates in NON SUSPENDED slabs/pavement slabs including pedestals, ramps etc. leaving pockets, laying in alternate panels to required slopes, all necessary form work and finishing the top surface rough or smooth as required and directed, providing pockets/openings etc. including vibrating, tampering, curing, rendering and making smooth if required in any position, shape, level and thickness etc. as specified and directed by EIC. The rates include grouting of pockets, procurement of material, shuttering, tools & tackles, reinforcement etc. | Item 0050 | 3.1 | CUM |
|---|
| 52 | 53 | Foundation works: (Excavation, Providing and Laying Plain Cement Concrete (1:2:4)) | Item 0051 | | |
|---|
| 53 | 54 | Excavation in any plane & dimension including disposal of excavated earth up to any lead in all conditions, backfilling using serviceable earth and disposal of surplus and unserviceable earth. Soil to be levelled and properly compacted complete in all respect as per scope of work, technical specification and directions of EIC. Providing and laying PLAIN CEMENT CONCRETE (PCC) (1:2:4) (Concrete shall be design mix / nominal mix) with 20mm & down size graded crushed stone aggregates in NON SUSPENDED slabs/pavement slabs including pedestals, ramps etc. leaving pockets, laying in alternate panels to required slopes, all necessary form work and finishing the top surface rough or smooth as required and directed, providing pockets/openings etc. including vibrating, tampering, curing, rendering and making smooth if required in any position, shape, level and thickness etc. as specified and directed by EIC. | Item 0052 | 2 | CUM |
|---|
| 54 | 55 | PART -III Gate and Fencing | Item 0053 | | |
|---|
| 55 | 56 | Supply of erection of single leaf mild steel gate 2.5m high with mesh upto 2m height and Concertina coil fencing with barbed wire and 2m wide complete in all respect including painting as per TS on all MS items, all works as per specification and drawings including foundations and RCC beams. | Item 0054 | 1 | EA |
|---|
| 56 | 57 | Supply of all materials, fabrication and erection of chain link fencing 2.5m high with mesh up to 2m height and Concertina coil fencing with barbed wire complete in all respects including painting as per TS on all MS items, all works as per specification and drawings including foundation and RCC beams as per drawing and instruction of EIC. | Item 0055 | 10 | RM |
|---|
| 57 | 58 | PART -IV Miscellaneous | Item 0056 | | |
|---|
| 58 | 59 | Installations of DRS/ MRS/ Metering Skid/ Service Regulator | Item 0057 | | |
|---|
| 59 | 60 | Receiving, handling, loading, transportation and unloading of owner supplied DRS/MRS/ Metering Skid/ service regulator from Owner's designated stock yards to Contractor's own stock-yards/ work-sites. Proper storing, stacking, identification, providing security and insurance cover for the materials. Supply of cover box for service regulator is in the scope of contractor.\nInstallations of DRS/MRS/ Metering Skid/ service regulator with all associated work at foundation and hooking up with PE pipe line. The scope includes supply of transition fittings and other PE and CS fittings as per requirements and various associated works (including steel welding, if required) to commission DRS/MRS/Metering Skid/Service Regulator. Payment towards civil foundation work & structural work for gate and fencing shall be payable as per relevant SOR items. | Item 0058 | | |
|---|
| 60 | 61 | DRS | Item 0059 | 1 | EA |
|---|
| 61 | 62 | MRS / Metering Skids | Item 0060 | 3 | EA |
|---|
| 62 | 63 | Service Regulator along with Cover box | Item 0061 | 2 | EA |
|---|
| 63 | 64 | PE Repair Activity | Item 0062 | | |
|---|
| 64 | 65 | PE pipe Line Repairing including excavation, leakage arrest, Electrofusion jointing and restoration of any dia. up-to 63 mm including supply and installation of all fittings required. PE Pipe required shall be issued by Owner as free issue material. | Item 0063 | 5 | EA |
|---|
| 65 | 66 | PE pipe Line Repairing including excavation, leakage arrest, Electrofusion jointing and restoration of any dia. above 63 mm including supply and installation of all fittings required. PE Pipe required shall be issued by Owner as free issue material. | Item 0064 | 2 | EA |
|---|
| 66 | 67 | PE Pipeline laying liaisoning and getting permissions from the Land Owning Agencies | Item 0065 | | |
|---|
| 67 | 68 | Submission of applications as per approved drawing provided by owner / owner's representative (Initial Route survey, preparation of drawing, measuring and providing details of surface type shall be in scope of contractor with approval from owner / owner's representative), obtaining and submission of demand note, coordination, Liaising, obtaining written permission from land owing agencies like NHAI, Indian Railways and any other government agencies who maintains the public lands (all fee paid to authorities excluding demand charges or Bank Guarantees shall be reimbursed against documentary evidence). This rates are not applicable for Private lands i.e. Apartments etc. Permissions required from various authorities like NHAI / Railways / Irrigation (Canal) etc. falling enroute shall be inclusive in the item rate. | Item 0066 | 3650.25 | M |
|---|
| 68 | 69 | Ground Penetrating RADAR | Item 0067 | | |
|---|
| 69 | 70 | Carrying out subsurface utility survey along the proposed pipeline route and/ or as specified by Engineer-In-Charge for 5 m corridor using Ground Penetrating Radar (GPR) for depth upto 5m below the existing ground level to locate and identify all existing underground utilities/buried objects including but not limited to pipelines, sewers, conduits, cables, drains, manholes, appurtenances etc. in the proposed corridor along with location, DGPS coordinates, depth, shape and dimensional details of utilities. Four (4) Copies of Report and Drawings incorporating all collected datas shall be submitted as per scope of work and direction of the Engineer-in-charge. Scale of Drawing shall be Planimetry (X Axis 1:1000, Y Axis 1:100), Longitudinal Section (Z Axis 1:100) and Transverse Section at critical location.\n\nNote: 1.Survey Agency for execution of GPR Survey Work to be engaged by the Contractor shall be submitted for approval of Owner/ Consultant prior to start of work.\n2. GPR Work shall be carried in presence of Contractor's Representative. | Item 0068 | 4559 | M |
|---|
| 70 | 71 | PART -V Electrical | Item 0069 | | |
|---|
| 71 | 72 | Supply, Install?tion and testing of Galvanized iron earth electrode with 3mts long 65mm dia. GI perforated pipe Class B, Complete with GI earth bus, test link in RCC / Brick earth pit, charcoal, salt, funnel and earth pit cover as per IS:3043, (as per drg. enclosed) | Item 0070 | | |
|---|
| 72 | 73 | Supply and installation of GI earthing conductor of the following sizes:- | Item 0071 | | |
|---|
| 73 | 74 | Above ground/buried under ground | Item 0072 | | |
|---|
| 74 | 75 | 25X 6mm GI Strip | Item 0073 | 280 | M |
|---|
| 75 | 76 | 2.5 sq.mm Cu PVC wire | Item 0074 | 100 | M |
|---|
| 76 | 77 | 10sq. Mm Cu PVC insulated cable | Item 0075 | 60 | M |
|---|
| 77 | 78 | PART -VI Marketing | Item 0076 | | |
|---|
| 78 | 79 | Carrying out the work of obtaining PNG registration in all respect as detailed in Scope of work and Special Conditions of\ncontract and as per directions/instructions of Engineer In charge /Authorized representative including but not limited to following : \n1) Enrolment & Registration of PNG Customers as per the given target.\n2) Collection of filled up form along with Security Deposit amount (only in the form of cheque/Demand Draft/ Online mode) and relevant documents. \n3) Carrying out the work of demand registration, evaluation, facilitation of signing of GSA and collection of security deposit and payment against payment security as detailed in scope of work and special condition of contract of tender document as per requirement and the satisfaction of the EIC for industrial and commercial customers.\n4) Carrying out the marketing activities for PNG connection as per directions/instructions of the EIC including but not limited to the following: Printing & Distribution of leaflets & FAQ, Printing & Installation of banners at prime locations, Awareness cum Registration Camp, Audio/Visual Presentations, Organizing Road Shows, etc. | Item 0077 | | |
|---|
| 79 | 80 | Domestic PNG Connections | Item 0078 | 334 | EA |
|---|
| 80 | 81 | Commercial PNG Connections | Item 0079 | 4 | EA |
|---|
| 81 | 82 | Industrial PNG Connections | Item 0080 | 2 | EA |
|---|
| 82 | 83 | PART -VII GI Section | Item 0081 | | |
|---|
| 83 | 84 | Procurement and Installation of Contractor's supplied items i.e. Powder Coated GI Pipes (Heavy Class), Copper tubes, GI & Cu Fittings, Brass fittings, Appliance Valve & Isolation valve etc. along with installation of free issue materials (Meter and Regulator) to complete the work | Item 0082 | | |
|---|
| 84 | 85 | Assessment of material requirement for installation at site, Order placement for Purchasing of GI Pipes, GI fittings, Copper tubes & fittings, Brass Fittings & Flexible Hose (Anaconda), Meter, Regulator, Isolation Valve, Appliance valve etc. as per specification from approved/recommended vendors by Owner for completing the work, Scheduling, Planning of material & Forwarding inspection call, getting dispatch clearance, handling, loading, transportation and unloading of these items at respective contractor’s store. (Isolation valve and Appliance valve supply rate to be paid separately as per relevant SOR item).\n\nReceiving, taking over, handling, loading, transportation and unloading of owner supplied items i.e. Domestic, Commercial, & Industrial Meter & Regulator etc. as defined in specification from owners designated stock yard to contractors own store/ work site, proper storing stacking, identification, providing security and insurance cover. Preparation and approval of sketches, schedules & execution procedures. Finalizing optimum route with consent of customer from transition fitting to cooking oven / appliance and ensuring installations in well ventilated areas. Making temporary but stable platforms/ scaffolding/ rope ladders and supply of all other safety devices. SAP/ Portal entry / Data Entry for new connections - New registration tracking and feasibility survey and its updation as per Owner defined TAT, printing of stationary as per approved Owner formats required during connections. | Item 0083 | | |
|---|
| 85 | 86 | Installation of GI service pipes & fittings, regulators, Valves etc. including NPT threading, as specified, Drillings of holes through the walls (Brick, RCC), Granite, Marble, Wood Cutting, Glass Cutting with proper heavy duty hammer drill machine, tools & tackles, using proper sealant/grout material and colours to match the original replacement of the damages during drilling, restoring the area to the original condition, Painting of scratched length of powder coated pipe and fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint. Restoring the wall surface to original conditions. | Item 0084 | | |
|---|
| 86 | 87 | Copper tube shall be installed from the downstream of meter up to the isolation valve before the customer appliance as per requirement and the satisfaction of EIC, the contractor to provide all equipment, tools and materials necessary to execute the work in efficient manner by cutting, cleaning, flux application, soldering and lacquering. The work includes supply of tools, tackles and consumables including clamp for fixing the tubes. | Item 0085 | | |
|---|
| 87 | 88 | Supply & fixing of approved clamps & nylon rawl plugs with SS 304 2\" screws, grout material, suitable thread sealant i.e. Teflon Tape, Joining of transition fitting to above ground service GI pipes, testing, purging and commission of the complete installation. The rates in connections also includes meter and regulator installation, tap off rates etc. Installation in already gas charged area, planning & coordinating with existing consumer's for New tap offs from existing riser with or without tee, testing of these existing risers and commissioning of these connections with newly tap offs etc. is inclusive. | Item 0086 | | |
|---|
| 88 | 89 | Domestic Connection | Item 0087 | | |
|---|
| 89 | 90 | 1/2\" GI Pipe | Item 0088 | 4250 | M |
|---|
| 90 | 91 | 3/4\" GI Pipe | Item 0089 | 750 | M |
|---|
| 91 | 92 | 12 mm Copper Tube - Inside kitchen location only | Item 0090 | 500 | M |
|---|
| 92 | 93 | Commercial/ Industrial Connection | Item 0091 | | |
|---|
| 93 | 94 | 1\" GI Pipe | Item 0092 | 167 | M |
|---|
| 94 | 95 | 1.5\" GI Pipe | Item 0093 | 84 | M |
|---|
| 95 | 96 | Supply of Isolation & Appliance Valve as per tender | Item 0094 | | |
|---|
| 96 | 97 | Isolation Ball valve (1/2\") | Item 0095 | 567 | EA |
|---|
| 97 | 98 | Isolation Ball valve (3/4\") | Item 0096 | 100 | EA |
|---|
| 98 | 99 | Isolation Ball valve (1\") | Item 0097 | 7 | EA |
|---|
| 99 | 100 | Isolation Ball valve (1.5\") | Item 0098 | 4 | EA |
|---|
| 100 | 101 | Appliance valve (1/4\") | Item 0099 | 167 | EA |
|---|
| 101 | 102 | Appliance valve (1/2\") | Item 0100 | 167 | EA |
|---|
| 102 | 103 | Testing and Conversion of Domestic Appliances | Item 0101 | | |
|---|
| 103 | 104 | Conversions of all the burners of LPG Stove (one appliance per household) to Natural Gas (NG) based appliances, Supply & changing of the nozzles / jets and associated controls for domestic & imported appliances with proper tools and tackles. The rates include testing of Kitchen piping from meter to Appliance valve and supply and fixing of one Steel reinforced Flexible Hose as per IS 9573 (with Type as per latest PNGRB guidelines) per appliance/stove with clamps. Cleaning and performing minor maintenance including gas inlet side change in stove, greasing etc. of the appliance. Testing and showing the performance to the customer, signing of joint meter records (JMR) and instructing the customer on use & safety norms, complete as per specifications & to satisfaction of owner / Engineer in Charge. (Supply of Steel Reinforced Rubber hose, Nozzle jets for conversion of burners is inclusive.) | Item 0102 | 334 | EA |
|---|
| 104 | 105 | PART -VIII Operation & Maintenance | Item 0103 | | |
|---|
| 105 | 106 | Attending customer service requests and resolving the complaints in all respects as detailed in scope of work and special conditions of contract and as per directions/instructions of EIC/Authorized representative including but not limited to following: Venting, Flushing, Modifications, Meter/Regulator Change, Testing, Painting, etc. in gas charged area. Installation of clamps, fittings and hardware is in scope of contractor. Any additional GI Pipe (if required) in case dismantled pipe are not healthy or short, item shall be paid as per relevant SOR item. Dismantled pipe/fittings to be returned at Owner Store or site office as instructed by EIC. | Item 0104 | | |
|---|
| 106 | 107 | GI Riser Testing (Transition Fitting to Meter Isolation Valve) all sizes | Item 0105 | 500 | M |
|---|
| 107 | 108 | Internal Testing (Meter Isolation Valve to Appliance Valve) | Item 0106 | 34 | EA |
|---|
| 108 | 109 | Conversion of LPG to PNG/ PNG to LPG burner | Item 0107 | 100 | EA |
|---|
| 109 | 110 | Supply of Steel Reinforced Rubber Hose with Clamps | Item 0108 | 34 | EA |
|---|
| 110 | 111 | Flame Problem | Item 0109 | 34 | EA |
|---|
| 111 | 112 | Meter checking by check meter in series | Item 0110 | 34 | EA |
|---|
| 112 | 113 | Replace Brass Connector/ Adapter | Item 0111 | 34 | EA |
|---|
| 113 | 114 | Dismantling of GI Pipe in case modification, leakage or site requirements 3/4\" | Item 0112 | 75 | M |
|---|
| 114 | 115 | Dismantling of GI Pipe in case modification, leakage or site requirements 1/2\" | Item 0113 | 425 | M |
|---|
| 115 | 116 | Dismantling of Copper Pipe in case modification, leakage or site requirements | Item 0114 | 50 | M |
|---|
| 116 | 117 | Reinstallation and painting of GI Pipe using Old dismantled pipe 3/4\" | Item 0115 | 75 | M |
|---|
| 117 | 118 | Reinstallation and painting of GI Pipe using Old dismantled pipe 1/2\" | Item 0116 | 425 | M |
|---|
| 118 | 119 | Reinstallation of Copper Pipe using Old dismantled pipe | Item 0117 | 50 | M |
|---|
| 119 | 120 | Replacement of SS 316 Anaconda | Item 0118 | 34 | EA |
|---|
| 120 | 121 | Replacement of meter / Regulator | Item 0119 | 34 | EA |
|---|
| 121 | 122 | Notes:\n1) The SOR items would be executed as per the job requirement.\n2) The scope as mentioned in the above SOR is of indicative nature only and shall include all activities as detailed in the relevant clauses of the specifications.\n3) Any other material & activities not mentioned/covered above, but otherwise required for satisfactory completion/safety of work as defined in tender has to be supplied / done by contractor at no extra cost to owner.\n4) Prices quoted shall be all inclusive of all taxes / duties (excluding GST) and nothing extra shall be payable by the Owner except for statutory variation in GST. \n5) The quantities mentioned in SOR are tentative only and for the purpose of evaluation and may vary as per the actual site condition.\n6) The SOR shall be read along with the relevant clauses of tender document\n | Item 0120 | | |
|---|