| 1 | 1 | Digital experience hub-Civil Works | BI01010001010000000000000515BI0100001111 | | |
|---|
| 2 | 1.1 | Experience Center designing, installation and implementation including all support infrastructure, civil, electrical, lighting, aesthetics etc. | BI01010001010000000000000515BI0100001112 | | |
|---|
| 3 | 1.11 | Civil Construction | BI01010001010000000000000515BI0100001113 | 1 | Lumpsum |
|---|
| 4 | 1.12 | Fittings and Furnishings (includes flooring, painting, etc.) | BI01010001010000000000000515BI0100001114 | 1 | Lumpsum |
|---|
| 5 | 1.13 | Furniture Items (based on your proposal) | BI01010001010000000000000515BI0100001115 | 1 | Lumpsum |
|---|
| 6 | 1.14 | Electrical, lighting and HVAC system | BI01010001010000000000000515BI0100001116 | 1 | Lumpsum |
|---|
| 7 | 1.15 | UPS | BI01010001010000000000000515BI0100001117 | 1 | Lumpsum |
|---|
| 8 | 1.16 | Security and Safety System | BI01010001010000000000000515BI0100001118 | 1 | Lumpsum |
|---|
| 9 | 1.17 | Audio System | BI01010001010000000000000515BI0100001119 | 1 | Lumpsum |
|---|
| 10 | 1.18 | Network installation | BI01010001010000000000000515BI0100001120 | 1 | Lumpsum |
|---|
| 11 | 1.19 | Miscellaneous | BI01010001010000000000000515BI0100001121 | 1 | Lumpsum |
|---|
| 12 | 2 | Design/ Implementation | BI01010001010000000000000515BI0100001122 | | |
|---|
| 13 | 2.1 | Cost of complete development and deployment of the following use-cases/ content, across all platforms, including all the efforts, any support infrastructure costs required for content creation | BI01010001010000000000000515BI0100001124 | | |
|---|
| 14 | 2.101 | Self-Contained Breathing Apparatus (SCBA) training | Item 1 | 1 | Lumpsum |
|---|
| 15 | 2.102 | Hazards of working at a height and their mitigation | Item 2 | 1 | Lumpsum |
|---|
| 16 | 2.103 | Hazards of welding and cutting operation in running plant | Item 3 | 1 | Lumpsum |
|---|
| 17 | 2.104 | Hazards of working in confined spaces and their mitigation | Item 4 | 1 | Lumpsum |
|---|
| 18 | 2.105 | Asset Inspection (including AR platform cost) | Item 5 | 1 | Lumpsum |
|---|
| 19 | 2.106 | Time Wall | Item 6 | 1 | Lumpsum |
|---|
| 20 | 2.107 | Holofans | Item 7 | 1 | Lumpsum |
|---|
| 21 | 2.108 | Large video walls | Item 8 | 1 | Lumpsum |
|---|
| 22 | 2.109 | AI based mascots | Item 9 | 1 | Lumpsum |
|---|
| 23 | 2.11 | Rotoscope | Item 10 | 1 | Lumpsum |
|---|
| 24 | 3 | Operationalization | Item 11 | | |
|---|
| 25 | 3.1 | Hardware for digital hub | Item 12 | | |
|---|
| 26 | 3.11 | Training Stations | Item 13 | | |
|---|
| 27 | 3.111 | VR – Headset With Controller (Tethered) | Item 14 | 4 | Each |
|---|
| 28 | 3.112 | MR – Headset | Item 15 | 1 | Each |
|---|
| 29 | 3.113 | Support Workstations | Item 16 | 4 | Each |
|---|
| 30 | 3.114 | Display Screens | Item 17 | 4 | Each |
|---|
| 31 | 3.115 | Other support infrastructure required to set-up the training modules or accessories | Item 18 | 1 | Lumpsum |
|---|
| 32 | 3.12 | Time Wall | Item 19 | | |
|---|
| 33 | 3.121 | Video Wall (5 x 1 layout) (55” each) | Item 20 | 5 | Each |
|---|
| 34 | 3.122 | Support workstation | Item 21 | 1 | Each |
|---|
| 35 | 3.123 | Cables, accessories and other elements (if any, please specify) | Item 22 | 1 | Each |
|---|
| 36 | 3.124 | Touchscreen overlay With toughend glass | Item 23 | 1 | Each |
|---|
| 37 | 3.125 | Interactive book controller | Item 24 | 1 | Each |
|---|
| 38 | 3.13 | Holofan - product displays | Item 25 | | |
|---|
| 39 | 3.131 | 3D Holofan | Item 26 | 1 | Each |
|---|
| 40 | 3.132 | Other elements (if any, please specify) | Item 27 | 1 | Lumpsum |
|---|
| 41 | 3.14 | Large format Video Wall with touch enabled - to showcase IOCL achievements and current developments in energy sector | Item 28 | | |
|---|
| 42 | 3.141 | Video Wall (2 x 2 layout)(55” each) | Item 29 | 4 | Each |
|---|
| 43 | 3.142 | Touchscreen overlay with toughend glass | Item 30 | 1 | Each |
|---|
| 44 | 3.143 | Support workstation | Item 31 | 1 | Each |
|---|
| 45 | 3.144 | Cables, accessories and other elements (if any, please specify) | Item 32 | 1 | Lumpsum |
|---|
| 46 | 3.15 | AI based Mascot | Item 33 | | |
|---|
| 47 | 3.151 | Supply and deployment of AI based Mascot (One pair of 1 male and 1 female) | Item 34 | 1 | Pair |
|---|
| 48 | 3.152 | Development and testing of Mascot (one pair of 1 male and 1 female) | Item 35 | 1 | Pair |
|---|
| 49 | 3.16 | Roto Scope | Item 36 | | |
|---|
| 50 | 3.161 | 55” Capacitive Multi Touchscreen | Item 37 | 1 | Each |
|---|
| 51 | 3.162 | Circuit Interface with sensor | Item 38 | 1 | Each |
|---|
| 52 | 3.163 | Mini PC | Item 39 | 1 | Each |
|---|
| 53 | 3.164 | Other elements (Acessories ) | Item 40 | 1 | Lumpsum |
|---|
| 54 | 3.17 | Digital screen table | Item 41 | | |
|---|
| 55 | 3.171 | 55” Capacitive Multitouch Screen With Table format | Item 42 | 1 | Each |
|---|
| 56 | 3.172 | Support workstation | Item 43 | 1 | Each |
|---|
| 57 | 3.173 | Accessories | Item 44 | 1 | Lumpsum |
|---|
| 58 | 3.18 | Digital Flip board | Item 45 | | |
|---|
| 59 | 3.181 | Supply and deployment of flip board | Item 46 | 1 | Each |
|---|
| 60 | 3.182 | Other elements | Item 47 | 1 | Each |
|---|
| 61 | 3.19 | Feedback System | Item 48 | | |
|---|
| 62 | 3.191 | Android Tablet | Item 49 | 2 | Each |
|---|
| 63 | 3.192 | Wall Mount | Item 50 | 2 | Each |
|---|
| 64 | 3.193 | Other support hardware/ accessories | Item 51 | 2 | Lumpsum |
|---|
| 65 | 4 | Mobile application | Item 52 | | |
|---|
| 66 | 4.1 | Mobile application design and development | Item 53 | 1 | Lumpsum |
|---|
| 67 | 4.2 | Mobile application training | Item 54 | 10 | Training session |
|---|
| 68 | 5 | Maintenance | Item 55 | | |
|---|
| 69 | 5.11 | Comprehensive AMC for period of 1st year for all hardware installed (post defect liability period) in digital experience hub | Item 56 | 1 | Lumpsum |
|---|
| 70 | 5.12 | Comprehensive AMC for period of 2nd year for all hardware installed (post defect liability period) in digital experience hub | Item 57 | 1 | Lumpsum |
|---|
| 71 | 5.13 | Comprehensive AMC for period of 3rd year for all hardware installed (post defect liability period) in digital experience hub | Item 58 | 1 | Lumpsum |
|---|
| 72 | 5.14 | Comprehensive AMC for period of 4th year for all hardware installed (post defect liability period) in digital experience hub | Item 59 | 1 | Lumpsum |
|---|
| 73 | 5.15 | Comprehensive AMC for period of 5th year for all hardware installed (post defect liability period) in digital experience hub | Item 60 | 1 | Lumpsum |
|---|
| 74 | 5.16 | Comprehensive AMC for period of 6th year for all hardware installed (post defect liability period) in digital experience hub | Item 61 | 1 | Lumpsum |
|---|
| 75 | 5.2 | Support charges for Digital experience hub (including support person and his workstation) | Item 62 | 6 | Year |
|---|
| 76 | 5.3 | Annual Upgrade and Update Charges for the software (refer note 4, clause No. 6 of SCC-Technical) (post defect liability period) for all elements installed in the digital experience hub | Item 63 | 6 | Year |
|---|
| 77 | 5.4 | AMC for Mobile Apps Software including new changes, deletion, modification, updating and incorporating new modules in consecutive years(refer note 4, clause No. 6 of SCC-Technical) (post defect liability period) | Item 64 | 6 | Year |
|---|