}

Widening And Improvements, Retaining Wall And Culvert Works Including Up Keeping For A Period Of 60 Months In Govt. Roads In Respect Of Papanasam (H), C&M Subdivisionpackage– 82 Road A, ,Widening From Single Lane To Intermediate Lane And Improvements Of K, THANJAVUR-Tamil Nadu

Highways Department-HD has published Widening And Improvements, Retaining Wall And Culvert Works Including Up Keeping For A Period Of 60 Months In Govt. Roads In Respect Of Papanasam (H), C&M Subdivisionpackage– 82 Road A, ,Widening From Single Lane To Intermediate Lane And Improvements Of K. Submission Date for this Tender is 10-07-2020. Intermediates Tenders in THANJAVUR Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

24519821
Widening And Improvements, Retaining Wall And Culvert Works Including Up Keeping For A Period Of 60 Months In Govt. Roads In Respect Of Papanasam (H), C&M Subdivisionpackage– 82 Road A, ,Widening From Single Lane To Intermediate Lane And Improvements Of K
Open Tender
Indian
Tamil Nadu
THANJAVUR
10-07-2020

Tender Details

Widening And Improvements, Retaining Wall And Culvert Works Including Up Keeping For A Period Of 60 Months In Govt. Roads In Respect Of Papanasam ( H ) , C&M Subdivisionpackage– 82 Road A, , Widening From Single Lane To Intermediate Lane And Improvements Of Koonancherry - Thiruvaikkavur Road At Km 2 / 0 - 3 / 6 Including Reconstruction Of Culverts At Km 2 / 4, 2 / 8, 3 / 2, 3 / 4 , Construction Of Retaining Wall At Km 2 / 2 And Including Upkeeping For A Period Of 60 Monthsroad B, , Widening From Single Lane To Intermediate Lane And Improvements Of Koonancherry - Thiruvaikkavur Road At Km 3 / 6 - 5 / 0 Including Reconstruction Of Culverts At Km 3 / 8, 4 / 2, 4 / 10 Including Upkeeping For A Period Of 60 Monthsroad C, Widening From Single Lane To Intermediate Lane And Improvements Of Koonancherry - Thiruvaikkavur Road At Km 5 / 0 - 6 / 2 Including Reconstruction Of Culverts At Km 5 / 4 ( I ) , ( Ii ) , 5 / 10 Including Upkeeping For A Period Of 60 Monthsroad D, , Reconstruction Of Box Culvert At Km 2 / 2 Of Arunthavapuram - Nadupatt

Key Value

Document Fees
Refer document
EMD
INR 271000.0 /-
Tender Value
INR 5.20 Crore /-

BOQ Items

Name of Work of Widening and improvements, Retaining wall and Culvert works including up keeping for a period of 60 months in Govt. Roads in respect of Papanasam (H), C&M SubdivisionPACKAGE– 82 Road A, ,Widening from Single lane to Intermediate lane and Improvements of Koonancherry - Thiruvaikkavur road at km 2/0 - 3/6 including reconstruction of culverts at Km 2/4, 2/8, 3/2, 3/4 , construction of retaining wall at Km 2/2 and including upkeeping for a period of 60 months Road B, ,Widening from Single lane to Intermediate lane and Improvements of Koonancherry - Thiruvaikkavur road at km 3/6 - 5/0 including reconstruction of culverts at Km 3/8, 4/2, 4/10 including upkeeping for a period of 60 months Road C, Widening from Single lane to Intermediate lane and Improvements of Koonancherry - Thiruvaikkavur road at km 5/0 - 6/2 including reconstruction of culverts at Km 5/4 (i), (ii), 5/10 including upkeeping for a period of 60 months Road D,,Reconstruction of Box Culvert at km 2/2 of Arunthavapuram - Nadupatti road including upkeeping for a period of 60 months Road E, Reconstruction of Box Culvert at km 2/2 of Ammapet - Ukkadai road including upkeeping for a period of 60 months Road F, Reconstruction of Box Culvert at km 3/2 of Saliamangalam - Sadayarkoil road including upkeeping for a period of 60 months
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and depositing the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed of the work and including all other incidental charges etc., complete in accordance with standard specifications as per MORTH Vth Rev. 111, 112, 201 & 202
2 1.01 Road B 187.5 Square metre
3 1.02 Road C 487.5 Square metre
4 2 Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per MORTH Vth Rev., 111, 112 & 201\na) box cutting for widening portion
5 2.01 Road A 1393.74 Cubic metre
6 2.02 Road B 1187.16 Cubic metre
7 2.03 Road C 872.11 Cubic metre
8 3 Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density and complete as per clause 401 in accordance with standard specifications for grading-V as per MORTH Vth Rev., 111, 112, 401 & 900.
9 3.01 Road A (387.15+2.52+67.50) 457.17 Cubic metre
10 3.02 Road B (341.02+1.49+50.63) 393.14 Cubic metre
11 3.03 Road C (281.25+68.99) 350.24 Cubic metre
12 3.04 Road D (0.50+22.50) 23 Cubic metre
13 3.05 Road E (1.05+45) 46.05 Cubic metre
14 3.06 Road F (0.50+22.50) 23 Cubic metre
15 4 Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density and complete as per clause 401 in accordance with standard specifications for grading-III as per MORTH Vth Rev., 111, 112, 401 & 900.
16 4.01 Road A 276.52 Cubic metre
17 4.02 Road B 243.58 Cubic metre
18 4.03 Road C 200.88 Cubic metre
19 5 Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 406 and in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 406 & 900
20 5.01 Road A (691.34+4.20+112.50) 808.04 Cubic metre
21 5.02 Road B (693.34+2.48+84.38) 780.2 Cubic metre
22 5.03 Road C (794.73+114.98) 909.71 Cubic metre
23 5.04 Road D (0.83+37.50) 38.33 Cubic metre
24 5.05 Road E (1.75+75) 76.75 Cubic metre
25 5.06 Road F (0.83+37.50) 38.33 Cubic metre
26 6 Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502 and in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 501, 502 & 900
27 6.01 Road A (2765.35+16.80) 2782.15 Square metre
28 6.02 Road B (2998.32+9.90) 3008.22 Square metre
29 6.03 Road C (3471.43+9.90) 3481.33 Square metre
30 6.04 Road D 3.3 Square metre
31 6.05 Road E 7 Square metre
32 6.06 Road F 3.3 Square metre
33 7 Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous / granular surface cleaned with mechanical broom as per clause 503 and in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 501, 503 & 900
34 7.01 Road A (2765.35+16.80) 2782.15 Square metre
35 7.02 Road B (2998.32+9.90) 3008.22 Square metre
36 7.03 Road C (3471.43+9.90) 3481.33 Square metre
37 7.04 Road D 3.3 Square metre
38 7.05 Road E 7 Square metre
39 7.06 Road F 3.3 Square metre
40 8 Advance BT patch work to an average thickness of 50mm using 45mm IRC size HBG metals with 44kg of (VG10) 80/100 grade bulk bitumen per 1 cum metals including premixing, laying over the existing BT surface and compaction including all labour and other incidental charges etc., completed as per clause 3004-2 and in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 501 & 900.
41 8.01 Road A 21.44 Cubic metre
42 8.02 Road B 22.78 Cubic metre
43 8.03 Road C 17.53 Cubic metre
44 9 Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 and in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 501, 503 & 900
45 9.01 Road A 5925.75 Square metre
46 9.02 Road B 4657.12 Square metre
47 9.03 Road C 2842.35 Square metre
48 9.04 Road D 75 Square metre
49 9.05 Road E 300 Square metre
50 9.06 Road F 75 Square metre
51 10 Providing and laying Bituminous Macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade-30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 and in accordance with standard specifications for Grading II as per MORTH Vth Rev. 111, 112, 504 & 900
52 10.01 Road A 435.7 Cubic metre
53 10.02 Road B 383.26 Cubic metre
54 10.03 Road C 316.17 Cubic metre
55 10.04 Road D 3.92 Cubic metre
56 10.05 Road E 15.35 Cubic metre
57 10.06 Road F 3.92 Cubic metre
58 11 Providing and laying Bituminous Concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG30) at percentage specified by job mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandam rollers to achieve the desired compaction as per MORTH specification clause No. 501-6, 501-7 & 507 and complete in all respects and in accordance with standard specifications MORTH Vth Rev. 111, 112, 507 & 900 Grading -II
59 11.01 Road A 261.43 Cubic metre
60 11.02 Road B 229.96 Cubic metre
61 11.03 Road C 189.71 Cubic metre
62 11.04 Road D 2.35 Cubic metre
63 11.05 Road E 9.21 Cubic metre
64 11.06 Road F 2.35 Cubic metre
65 12 Refilling of berms on both sides of carriageway by using exess box cut earth available at site with consolidation by power roller compaction and in accordance with the specifications and the lines and cross sections shown in the drawings or as indicated by the engineer as per MORTH.
66 12.01 Road A 1287 Cubic metre
67 12.02 Road B 1123.66 Cubic metre
68 12.03 Road C 858 Cubic metre
69 13 Collection and supply of Carted Earth including cost and conveyance to worksite and stacking them on road side for taking premeasurements and spreading the same in the low berms as directed by the Engineer with initial lift including all labour charges and consolidation with power roller including all tools and plants and all other incidental charges etc., complete for low berms in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 408 & 900
70 13.01 Road A(315+720+20.06) 1055.06 Cubic metre
71 13.02 Road B(275+594+18.75) 887.75 Cubic metre
72 13.03 Road C (226+888) 1114 Cubic metre
73 13.04 Road D 360 Cubic metre
74 13.05 Road E 480 Cubic metre
75 13.06 Road F 336 Cubic metre
76 14 Providing RCC M15 grade Precast KM stone of standard design as per IRC8-1980 and fixing in position in pedetal including painting,printing etc ., complete (as per MORT & H specification NO.804)
77 14.01 Road A 2 Numbers
78 14.02 Road B 2 Numbers
79 14.03 Road C 1 Numbers
80 15 Providing RCC M15 grade Precast HM stone of standard design as per IRC8-1980 and fixing in position in pedetal including painting,printing etc ., complete (as per MORT & H specification NO.804)
81 15.01 Road A 7 Numbers
82 15.02 Road B 5 Numbers
83 15.03 Road C 5 Numbers
84 15.04 CULVERTS
85 16 Dismantling Culverts,bridges and other structures\nDismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc.\na) Dismantling brick masonry/ stone masonry\n\nMORTH 111 112 202
86 16.01 Road A 97.6 Cubic metre
87 16.02 Road B 61.32 Cubic metre
88 16.03 Road C 53.72 Cubic metre
89 16.04 Road D 20.44 Cubic metre
90 16.05 Road E 24.4 Cubic metre
91 16.06 Road F 18.62 Cubic metre
92 17 Dismantling Culverts,bridges and other structures\nDismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc.\nb) Dismantling RCC\nMORTH 111 112 202
93 17.01 Road F 7 Cubic metre
94 18 Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deletrious matter and obstructions, trimming bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification -MORTH Vth Rev., 304 for FOUNDATION of culverts
95 18.01 Road A 199.44 Cubic metre
96 18.02 Road B 149.58 Cubic metre
97 18.03 Road C 230.04 Cubic metre
98 18.04 Road D 114.12 Cubic metre
99 18.05 Road E 77.06 Cubic metre
100 18.06 Road F 114.12 Cubic metre
101 19 Vibrated Cement Concrete M 15 grade (Nominal mix) using 40mm ISS size hard broken granite metal with M-Sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for Base Course for Box culvert as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900
102 19.01 Road A 25.81 Cubic metre
103 19.02 Road B 19.36 Cubic metre
104 19.03 Road C 27.71 Cubic metre
105 19.04 Road D 13.18 Cubic metre
106 19.05 Road E 9.32 Cubic metre
107 19.06 Road F 13.18 Cubic metre
108 20 Vibrated Cement Concrete M 20 Nominal mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for Box Culvert Below Sill level as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900
109 20.01 Road A 20.48 Cubic metre
110 20.02 Road B 15.36 Cubic metre
111 20.03 Road C 17.76 Cubic metre
112 20.04 Road D 7.52 Cubic metre
113 20.05 Road E 7.28 Cubic metre
114 20.06 Road F 7.52 Cubic metre
115 21 Vibrated reinforced cement concrete design mix M25 grade using 20mm & 12 mm ISS size HBG graded metal crushed stone with M-Sand including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing including all incidental charges etc., complete - MORTH Vth Rev., 1000, 1500, 1600, 1700, 2200, 2300 & 900 for Box culvert
116 21.01 Road A 112.1 Cubic metre
117 21.02 Road B 84.1 Cubic metre
118 21.03 Road C 151.2 Cubic metre
119 21.04 Road D 85.4 Cubic metre
120 21.05 Road E 50.7 Cubic metre
121 21.06 Road F 85.4 Cubic metre
122 22 Vibrated Cement Concrete M 20 Nominal mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for wing wall as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900
123 22.01 Road A 64.06 Cubic metre
124 22.02 Road B 48.04 Cubic metre
125 22.03 Road C 55.99 Cubic metre
126 22.04 Road D 23.96 Cubic metre
127 22.05 Road E 27.57 Cubic metre
128 22.06 Road F 23.96 Cubic metre
129 23 Supply and fabrication of (HYSD) required for all RCC items of works involved in the schedule of drawings including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, positioning and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification. - MORTH Vth Rev., 1000, 1500, 1600 & 900
130 23.01 Road A 8.48 Metric Tonne
131 23.02 Road B 6.36 Metric Tonne
132 23.03 Road C 11.09 Metric Tonne
133 23.04 Road D 6.13 Metric Tonne
134 23.05 Road E 3 Metric Tonne
135 23.06 Road F 6.13 Metric Tonne
136 24 Vibrated cement concrete M30 (Design mix) using 25mm, 12mm and 6mm ISS sized hard granite metal including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying compacting curing, including all incidental charges etc., complete for - MORTH Vth Rev., 1000, 1500, 1700, 2702, 2704 & 900 WEARING COAT 75MM uniform thickness
137 24.01 Road A 76.44 Square metre
138 24.02 Road B 57.33 Square metre
139 24.03 Road C 103.07 Square metre
140 24.04 Road D 56.45 Square metre
141 24.05 Road E 28.86 Square metre
142 24.06 Road F 56.45 Square metre
143 25 Vibrated reinforced cement concrete M40 (Design mix) using crushed ISS, hard broken granite graded metal 20mm and below including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering labour charges for laying, compacting curing, including all incidental charges etc., complete - MORTH Vth Rev., 1000, 1500, 1600, 1700, 2200, 2300 & 900 for CRASH BARRIER.
144 25.01 Road C 10.1 Running metre
145 25.02 Road D 10.1 Running metre
146 25.03 Road F 10.1 Running metre
147 26 Quarry Dust Filling around the pipes in between the body wall including cost and conveyance to site including labour charges for filling in layers, watering tamping under optimum moisture content to get the maximum density all incidental charges etc., complete. MORTH Vth Rev., 2907 For Pipe Culvert
148 26.01 Road A 21.29 Cubic metre
149 26.02 Road B 15.97 Cubic metre
150 26.03 Road C 22.83 Cubic metre
151 26.04 Road D 12.18 Cubic metre
152 26.05 Road E 19.79 Cubic metre
153 26.06 Road F 12.18 Cubic metre
154 27 Collection and supply of Gravel including cost and conveyance to worksite and stacking them on road side for taking premeasurements and spreading the same in the low berms as directed by the Engineer with initial lift including all labour charges and consolidation with power roller including all tools and plants and all other incidental charges etc., complete for Approach Road and Diversion Road in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 408 & 900
155 27.01 Road A 180 Cubic metre
156 27.02 Road B 135 Cubic metre
157 27.03 Road C 165 Cubic metre
158 27.04 Road D 45 Cubic metre
159 27.05 Road E 120 Cubic metre
160 27.06 Road F 37.5 Cubic metre
161 28 Supply of 1000mm dia RCC NP3 class pipes confirming to IS 458 specification as directed by the departmental officers including cost and conveyance of pipes to the worksite and all other incidental charges etc., complete as per standard specification as per MORTH Vth Rev., 1000, 2900 & 900
162 28.01 Road A 40 Running metre
163 28.02 Road B 30 Running metre
164 28.03 Road C 30 Running metre
165 28.04 Road D 10 Running metre
166 28.05 Road E 10 Running metre
167 28.06 Road F 10 Running metre
168 29 Laying and fixing of 1000mm dia RCC NP3 pipe in position excluding cost of pipes but including conveyance to work spot and handling charges on both sides including labour charges for hoisting and placing the pipes in position and packing the joints and all other incidental charges etc., complete as per standard specification as per MORTH Vth Rev., 2905, 2906 & 900
169 29.01 Road A 40 Running metre
170 29.02 Road B 30 Running metre
171 29.03 Road C 30 Running metre
172 29.04 Road D 10 Running metre
173 29.05 Road E 10 Running metre
174 29.06 Road F 10 Running metre
175 29.07 RETAINING WALL
176 30 Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deletrious matter and obstructions, trimming bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification -MORTH Vth Rev., 304 for FOUNDATION Retaining wall
177 30.01 Road A 214 Cubic metre
178 30.02 Road B 200 Cubic metre
179 31 Vibrated Cement Concrete of grade M15 using 40mm ISS size HBG graded metal using with M-Sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for LEVELLING COURSE for Retaining wall. as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900
180 31.01 Road A 32.1 Cubic metre
181 31.02 Road B 30 Cubic metre
182 32 Vibrated Cement Concrete of grade M20 using 40mm ISS size HBG graded metal using with M-Sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for Retaining wall Below Sill level. as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900
183 32.01 Road A 102.32 Cubic metre
184 32.02 Road B 95.63 Cubic metre
185 33 Vibrated Cement Concrete of grade M20 using 40mm ISS size HBG graded metal with M-Sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for Retaining wall Above Sill level. as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900
186 33.01 Road A 143.72 Cubic metre
187 33.02 Road B 134.26 Cubic metre
188 34 Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite, cost and labour for semi-spherical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the backfill as per standard specification. -MORTH Vth Rev., 2700, 2706, 2707 & 900 Minor Bridge, Box Culvert and RCC Retaining wall
189 34.01 Road A 107 Running Metre
190 34.02 Road B 100 Running Metre
191 35 Refilling with available Excavated Earth for filling in layers, not exceeding limits including watering, tamping including all labour charges and incidental charges etc., complete and in accordance with standard specifications as per MORTH Vth Rev., 305 & 2907 between Retaining wall and road
192 35.01 Road A 71.33 Cubic metre
193 35.02 Road B 66.67 Cubic metre
194 35.03 Upkeeping Component
195 36 Collection and supply of Carted Earth including cost and conveyance to worksite and stacking them on road side for taking premeasurements and spreading the same in the low berms as directed by the Engineer with initial lift including all labour charges and consolidation with power roller including all tools and plants and all other incidental charges etc., complete for low berms in accordance with standard specifications.
196 36.01 Second Year
197 36.02 Road A 96 Cubic metre
198 36.03 Road B 96 Cubic metre
199 36.04 Road C 72 Cubic metre
200 36.05 Third Year
201 36.06 Road A 96 Cubic metre
202 36.07 Road B 96 Cubic metre
203 36.08 Road C 72 Cubic metre
204 36.09 Fourth Year
205 36.1 Road A 96 Cubic metre
206 36.11 Road B 96 Cubic metre
207 36.12 Road C 72 Cubic metre
208 36.13 Fifth Year
209 36.14 Road A 96 Cubic metre
210 36.15 Road B 96 Cubic metre
211 36.16 Road C 72 Cubic metre
212 37 Clearing the Light jungles including weeding out shrubs bushes, vegetables, growth etc,as per spcifications and directions of Engineer in charge
213 37.01 First Year
214 37.02 Road A 7680 Square metre
215 37.03 Road B 6720 Square metre
216 37.04 Road C 5760 Square metre
217 37.05 Second Year
218 37.06 Road A 7680 Square metre
219 37.07 Road B 6720 Square metre
220 37.08 Road C 5760 Square metre
221 37.09 Third Year
222 37.1 Road A 7680 Square metre
223 37.11 Road B 6720 Square metre
224 37.12 Road C 5760 Square metre
225 37.13 Fourth Year
226 37.14 Road A 7680 Square metre
227 37.15 Road B 6720 Square metre
228 37.16 Road C 5760 Square metre
229 37.17 Fifth Year
230 37.18 Road A 7680 Suuare metre
231 37.19 Road B 6720 Suuare metre
232 37.2 Road C 5760 Square metre
233 38 Provision for engaging JCB for Clearing the vent way of CD works, and minor Bridges, clearing storm water drains and removing debris along roadside during urgent periods.
234 38.01 First Year
235 38.02 Road A 26 Hour
236 38.03 Road B 14 Hour
237 38.04 Road C 10 Hour
238 38.05 Second Year
239 38.06 Road A 26 Hour
240 38.07 Road B 14 Hour
241 38.08 Road C 10 Hour
242 38.09 Road D 4 Hour
243 38.1 Road E 4 Hour
244 38.11 Road F 4 Hour
245 38.12 Third Year
246 38.13 Road A 26 Hour
247 38.14 Road B 14 Hour
248 38.15 Road C 10 Hour
249 38.16 Road D 4 Hour
250 38.17 Road E 4 Hour
251 38.18 Road F 4 Hour
252 38.19 Fourth Year
253 38.2 Road A 26 Hour
254 38.21 Road B 14 Hour
255 38.22 Road C 10 Hour
256 38.23 Road D 4 Hour
257 38.24 Road E 4 Hour
258 38.25 Road F 4 Hour
259 38.26 Fifth Year
260 38.27 Road A 26 Hour
261 38.28 Road B 14 Hour
262 38.29 Road C 10 Hour
263 38.3 Road D 4 Hour
264 38.31 Road E 4 Hour
265 38.32 Road F 4 Hour
266 39 Painting with Plastic Enamel paint over the existing boundary stones, Guide stones, Parapets of Culverts, Tree number back ground, cautionary board and Sign board etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.
267 39.01 First Year
268 39.02 Road A 10.04 Square metre
269 39.03 Road B 5.81 Square metre
270 39.04 Road C 5.09 Square metre
271 39.05 Road D 0.72 Square metre
272 39.06 Road E 0.72 Square metre
273 39.07 Road F 0.72 Square metre
274 39.08 Second Year
275 39.09 Road A 14.73 Square metre
276 39.1 Road B 10.5 Square metre
277 39.11 Road C 7.25 Square metre
278 39.12 Road D 0.72 Square metre
279 39.13 Road E 0.72 Square metre
280 39.14 Road F 0.72 Square metre
281 39.15 Third Year
282 39.16 Road A 14.73 Square metre
283 39.17 Road B 10.5 Square metre
284 39.18 Road C 7.25 Square metre
285 39.19 Road D 0.72 Square metre
286 39.2 Road E 0.72 Square metre
287 39.21 Road F 0.72 Square metre
288 39.22 Fourth Year
289 39.23 Road A 14.73 Suare metre
290 39.24 Road B 10.5 Suare metre
291 39.25 Road C 7.25 Square metre
292 39.26 Road D 0.72 Suare metre
293 39.27 Road E 0.72 Suare metre
294 39.28 Road F 0.72 Suare metre
295 39.29 Fifth Year
296 39.3 Road A 14.73 Square metre
297 39.31 Road B 10.5 Square metre
298 39.32 Road C 7.25 Square metre
299 39.33 Road D 0.72 Square metre
300 39.34 Road E 0.72 Square metre
301 39.35 Road F 0.72 Square metre
302 40 White washing two coat with White cem over the Centre medians, Tree banding, etc., including cost of all materials and labour charges, etc., including all other incidental charges as directed by departmental officers.\n
303 40.01 First Year
304 40.02 Road A 386.28 Square metre
305 40.03 Road B 230.2 Square metre
306 40.04 Road C 218.62 Square metre
307 40.05 Road D 49.31 Square metre
308 40.06 Road E 33.64 Square metre
309 40.07 Road F 49.31 Square metre
310 40.08 Second Year
311 40.09 Road A 386.28 Square metre
312 40.1 Road B 230.2 Square metre
313 40.11 Road C 218.62 Square metre
314 40.12 Road D 49.31 Square metre
315 40.13 Road E 33.64 Square metre
316 40.14 Road F 49.31 Square metre
317 40.15 Third Year
318 40.16 Road A 386.28 Square metre
319 40.17 Road B 230.2 Square metre
320 40.18 Road C 218.62 Square metre
321 40.19 Road D 49.31 Square metre
322 40.2 Road E 33.64 Square metre
323 40.21 Road F 49.31 Square metre
324 40.22 Fourth Year
325 40.23 Road A 386.28 Square metre
326 40.24 Road B 230.2 Square metre
327 40.25 Road C 218.62 Square metre
328 40.26 Road D 49.31 Square metre
329 40.27 Road E 33.64 Square metre
330 40.28 Road F 49.31 Square metre
331 40.29 Fifth Year
332 40.3 Road A 386.28 Square metre
333 40.31 Road B 230.2 Square metre
334 40.32 Road C 218.62 Square metre
335 40.33 Road D 49.31 Square metre
336 40.34 Road E 33.64 Square metre
337 40.35 Road F 49.31 Square metre
338 41 Painting two coat ( Black banding) with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including all other incidental charges as directed by departmental officers.\nBlack banding
339 41.01 First Year
340 41.02 Road A 18.15 Square metre
341 41.03 Road B 20.6 Square metre
342 41.04 Road C 20.6 Square metre
343 41.05 Second Year
344 41.06 Road A 18.15 Square metre
345 41.07 Road B 20.6 Square metre
346 41.08 Road C 20.6 Square metre
347 41.09 Third Year
348 41.1 Road A 18.15 Square metre
349 41.11 Road B 20.6 Square metre
350 41.12 Road C 20.6 Square metre
351 41.13 Fourth Year
352 41.14 Road A 18.15 Square metre
353 41.15 Road B 20.6 Square metre
354 41.16 Road C 20.6 Square metre
355 41.17 Fifth Year
356 41.18 Road A 18.15 Square metre
357 41.19 Road B 20.6 Square metre
358 41.2 Road C 20.6 Square metre
359 42 Letterings in Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer.\nLettering 5 to 10cm
360 42.01 First Year
361 42.02 Road A 1122 Numbers
362 42.03 Road B 622 Numbers
363 42.04 Road C 538 Numbers
364 42.05 Road D 84 Numbers
365 42.06 Road E 84 Numbers
366 42.07 Road F 84 Numbers
367 42.08 Second Year
368 42.09 Road A 1210 Numbers
369 42.1 Road B 710 Numbers
370 42.11 Road C 504 Numbers
371 42.12 Road D 84 Numbers
372 42.13 Road E 84 Numbers
373 42.14 Road F 84 Numbers
374 42.15 Third Year
375 42.16 Road A 1210 Numbers
376 42.17 Road B 710 Numbers
377 42.18 Road C 504 Numbers
378 42.19 Road D 84 Numbers
379 42.2 Road E 84 Numbers
380 42.21 Road F 84 Numbers
381 42.22 Fourth Year
382 42.23 Road A 1210 Numbers
383 42.24 Road B 710 Numbers
384 42.25 Road C 504 Numbers
385 42.26 Road D 84 Numbers
386 42.27 Road E 84 Numbers
387 42.28 Road F 84 Numbers
388 42.29 Fivth Year
389 42.3 Road A 1210 Numbers
390 42.31 Road B 710 Numbers
391 42.32 Road C 504 Numbers
392 42.33 Road D 84 Numbers
393 42.34 Road E 84 Numbers
394 42.35 Road F 84 Numbers
395 43 Letterings in Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer.\nLettering 10 to 15 cm
396 43.01 First Year
397 43.02 Road A 104 Numbers
398 43.03 Road B 56 Numbers
399 43.04 Road C 48 Numbers
400 43.05 Road D 8 Numbers
401 43.06 Road E 8 Numbers
402 43.07 Road F 8 Numbers
403 43.08 Second Year
404 43.09 Road A 130 Numbers
405 43.1 Road B 82 Numbers
406 43.11 Road C 56 Numbers
407 43.12 Road D 8 Numbers
408 43.13 Road E 8 Numbers
409 43.14 Road F 8 Numbers
410 43.15 Third Year
411 43.16 Road A 130 Numbers
412 43.17 Road B 82 Numbers
413 43.18 Road C 56 Numbers
414 43.19 Road D 8 Numbers
415 43.2 Road E 8 Numbers
416 43.21 Road F 8 Numbers
417 43.22 Fourth Year
418 43.23 Road A 130 Numbers
419 43.24 Road B 82 Numbers
420 43.25 Road C 56 Numbers
421 43.26 Road D 8 Numbers
422 43.27 Road E 8 Numbers
423 43.28 Road F 8 Numbers
424 43.29 Fifth Year
425 43.3 Road A 130 Numbers
426 43.31 Road B 82 Numbers
427 43.32 Road C 56 Numbers
428 43.33 Road D 8 Numbers
429 43.34 Road E 8 Numbers
430 43.35 Road F 8 Numbers
431 44 Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces
432 44.01 Fourth Year
433 44.02 Road A 264 Square metre
434 44.03 Road B 231 Square metre
435 44.04 Road C 198 Square metre
436 44.05 Fifth Year
437 44.06 Road A 440 Square metre
438 44.07 Road B 385 Square metre
439 44.08 Road C 330 Square metre
440 45 Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II
441 45.01 Fourth Year
442 45.02 Road A 7.92 Cubic metre
443 45.03 Road B 6.93 Cubic metre
444 45.04 Road C 5.94 Cubic metre
445 45.05 Fifth Year
446 45.06 Road A 13.2 Cubic metre
447 45.07 Road B 11.55 Cubic metre
448 45.08 Road C 9.9 Cubic metre
449 90 Calculation of SubTotal, GST and Total Amount carried out by system automatically
450 90.1 Basic cost of value put to tender as per estimate 1 (A)
451 90.2 Add GST at 12% 1 (B)
452 90.3 Total Value put to Tender 1 (A+B)
453 90.4 Negotiated Percentage 1 (D)
454 90.5 Final Negotiated Value 1 (E)
455 90.6 Add GST at 12% of Final Negotiated Value 1 (F)
456 90.7 Total Value of Contract Including 12% of GST 1 (E+F)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail