| 1 | 1.01 | Item No. 1 :- Cutting down trees including cutting trunks & branches and stacking the material as directed with 15 mtr. lead and lift up to 1.5 mtr. etc. complete including up roofing and refilling the pit with material as directed (excluding extra material required for refilling) | BI01010001010000000000000515BI0100001113 | 310 | No |
|---|
| 2 | 1.02 | Item No. 2 :- Cleaning , Cutting thorny Shrubs, bushes grass with 15m lead & 1.5m lifts etc completed as directed. | BI01010001010000000000000515BI0100001114 | 18070 | Sqm |
|---|
| 3 | 1.03 | Item No. 3 :- Removing dry silt from canal bed with 15 Mtr. Lead 1.50 Mtr. Lift, including depositing excavated stuff as directed. | BI01010001010000000000000515BI0100001115 | 1365 | Cum |
|---|
| 4 | 1.04 | Item No. 4 :-Providing and laying dry stone rubble masonry excluding pointing etc. complete as directed. | BI01010001010000000000000515BI0100001116 | 32 | cum |
|---|
| 5 | 1.05 | Item No. 5 :-Providing and laying of Quarry Spalls of approved trap stone quality of specified thickness including hand packing etc. complete as per specifications and approved drqwings with lead of 50 m and all lifts as directed. | BI01010001010000000000000515BI0100001117 | 60 | cum |
|---|
| 6 | 2 | Item No. 6 :-Providing and constructing 300 mm thick dry rubble stone pitching with pin headers at 2 per Sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing etc. complete with lead upto 50 m and all lifts as directed.\nB) From Borrow Material | BI01010001010000000000000515BI0100001118 | 1114.92 | Sqm |
|---|
| 7 | 3 | Item No. 7:- Providng and constructing dry rubble rock toe using rubble and stone ships from approved source including cost of all materials, machinery, lanbour, hand packing rubble stone chips, finishing top and sides to required slopes etc. complete with lead upto 50 m and all lifts as directed.\nA) From Available Material | BI01010001010000000000000515BI0100001119 | 695 | Cum |
|---|
| 8 | 4 | B) From Borrow Material | BI01010001010000000000000515BI0100001120 | 417 | Cum |
|---|
| 9 | 5 | Item No. 8:- Providing and laying in situ cement concrete of grade M-20 (20 MSA) of trap / granite / gneiss / quartzite / graded metal for RCC works of gallery, sluice, spillway crest, spillway down stream face, energy dissipating structures, intake structures, training walls, piers, abutments, slab etc. with batching plant and Transit mixer including shuttering and scaffolding, placing, compacting, curing with an initial lead of 1 Km and all lifts etc. complete as directed. | BI01010001010000000000000515BI0100001121 | 5.4 | Cum |
|---|
| 10 | 6 | Item No. 9:- Royalty Charges as per Govt. Notofication | BI01010001010000000000000515BI0100001122 | 758.29 | Cum |
|---|
| 11 | 7 | Add 10 % on Royalty as Cess | BI01010001010000000000000515BI0100001123 | 1 | No. |
|---|
| 12 | 8.02 | Add Insurance 0.5 % | BI01010001010000000000000515BI0100001126 | 1 | No. |
|---|
| 13 | 8.03 | Add GST 12 % | BI01010001010000000000000515BI0100001127 | 1 | No. |
|---|