| 1 | 1.01 | Item No. 1 :- Cutting down trees including cutting trunks & branches and stacking the material as directed with 15 mtr. lead and lift up to 1.5 mtr. etc. complete including up roofing and refilling the pit with material as directed (excluding extra material required for refilling) | BI01010001010000000000000515BI0100001113 | 314 | No |
|---|
| 2 | 1.02 | Item No. 2 :-Cleaning , Cutting thorny Shrubs, bushes grass with 15m lead & 1.5m lifts etc completed as directed. | BI01010001010000000000000515BI0100001114 | 12067 | Sqm |
|---|
| 3 | 1.03 | Item No. 3 :-Removing dry silt from canal bed with 15 Mtr. Lead 1.50 Mtr. Lift, including depositing excavated stuff as directed. | BI01010001010000000000000515BI0100001115 | 562.8 | Cum |
|---|
| 4 | 1.05 | Item No. 4 :-Providing casing embankment using selected previous material available directly from excavation in layers including cost of all materials, machinery, labour, all other operations such as collection of material, spreading material in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor including cost of water etc. complete with lead of 1 km and all lifts as directed. | BI01010001010000000000000515BI0100001117 | 4331.6 | Cum |
|---|
| 5 | 2 | Item No. 5 :-Providing casing embankment using selected previous material from approved borrow area (Government land) in layers of including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods,levelling, sectioning edges / sides, watering, compactiong each layer to density control of not less then 95 percent or as stipulated using vibratory compactor including cost of water etc. complete with lead upto 1 Km and all lift as directed. | BI01010001010000000000000515BI0100001118 | 1856.4 | Cum |
|---|
| 6 | 4 | Item No. 6 :-Providing and constructing 300 mm thick dry rubble stone pitching with pin headers at 2 per Sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing etc. complete with lead upto 50 m and all lifts as directed.\nB) From Borrow Material | BI01010001010000000000000515BI0100001120 | 1313 | Sqm |
|---|
| 7 | 5 | Item No. 7 :-Providing and fixing gauge plate of Aluminium composite panel sheet with exterior panel coated with kynar 500 (Min 70 %) PVDF coating with computerised gauge marking with reflective radium pasting, spray lamination with polyurethane chemical for surface protection including material required for fixing nut bolts, washers, Nylon rope, hanger, drilling machine etc. complete as directed. | BI01010001010000000000000515BI0100001121 | 2.4 | Sqm |
|---|
| 8 | 6 | Item No. 8 :-Royalty Charges as per Govt. Notofication | BI01010001010000000000000515BI0100001122 | 2250 | Cum |
|---|
| 9 | 7 | Add 10 % on Royalty as Cess | BI01010001010000000000000515BI0100001123 | 1 | cum |
|---|
| 10 | 8.02 | Add Insurance 0.5 % | BI01010001010000000000000515BI0100001126 | 1 | No. |
|---|
| 11 | 8.03 | Add GST 12 % | BI01010001010000000000000515BI0100001127 | 1 | No. |
|---|