| 0 | S.No. | Item Code | Item Qty | Qty Unit | Unit Rate | Basic Value | Escl.(%) | Amount | Bidding Unit |
| 1 | Schedule A-(USSR ITEMS) | 2471382.25 | Above/\rBelow/Par | | | | | | |
| 2 | 1 | 181021 | 70.00 | cum | 510.54 | 35737.80 | AT Par | 35737.80 | |
| 3 | | Description:- Demolishing plain cement concrete including disposal of material within 50m lead 1:2:4 or richer\rmix with max. 20 mm coarse aggregate | | | | | | | |
| 4 | 2 | 181040 | 70.00 | cum | 223.44 | 15640.80 | AT Par | 15640.80 | |
| 5 | | Description:- Extra over Item Nos. 181021 and 181050 if pavement breaker is used on orders of Engineer | | | | | | | |
| 6 | 3 | 011011 | 70.00 | cum | 100.28 | 7019.60 | AT Par | 7019.60 | |
| 7 | | Description:- Earth work in excavation as per approved drawings and dumping at embankment site or spoil\rheap, within railway land, including 50m lead and 1.5m lift, the lead to be measured from the centre of gravity of\rexcavation to centre of gravity of spoil heap: the lift to be measured from natural ground level and paid for in\rlayers of 1.5m each, including incidental work, as per specifications-in All kinds of soils | | | | | | | |
| 8 | 4 | 021090 | 140.00 | cum | 59.54 | 8335.60 | AT Par | 8335.60 | |
| 9 | | Description:- Leading ballast, kankar, brickbats, stone-chips, shingle, stone boulders, block kankar, pitching\rstones, rubble stones, laterite, coal, surkhi, dry mortar, sand, moorum, earth, manure or sludge, ashes, lime,\rdebris, muck, malba, etc. for lead upto 25 km. Note : Lead under this item is payable when the same exceeds\r500m. | | | | | | | |
| 10 | 5 | 021070 | 280.00 | cum | 46.62 | 13053.60 | AT Par | 13053.60 | |
| 11 | | Description:- Loading/Unloading ballast, kankar, brickbats, stone-chips, shingle, stone boulders, block kankar,\rpitching stones , rubble stones, laterite, coal, surkhi, dry mortar, sand , moorum, earth, manure or sludge, ashes,\rlime etc., including lead up to 50m and stacking into/from trucks, trailors or wagons | | | | | | | |
| 12 | 6 | 031023 | 19.00 | cum | 2309.45 | 43879.55 | AT Par | 43879.55 | |
| 13 | | Description:- Providing and laying cement concrete, up to plinth in retaining walls, walls (any thickness) including\rattached plasters, columns, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed\rblocks, anchor blocks, plain window sills, fillets etc, excluding the cost of cement and of shuttering, centering.\r1:2:4 (1 cement : 2 sand : 4 graded stone aggregate 20mm nominal size) | | | | | | | |
| 14 | 7 | 056044 | 20.00 | cum | 4948.63 | 98972.60 | AT Par | 98972.60 | |
| 15 | | Description:- Cement Concrete Solid Block Masonry in foundation and plinth with:(factory made blocks) Cement\rmortar 1:6 (1cement: 6fine sand) | | | | | | | |
| 16 | 8 | 111012 | 120.00 | Sqm | 67.02 | 8042.40 | AT Par | 8042.40 | |
| 17 | Description:- 12 mm cement plaster of mix - 1:6 (1cement: 6fine sand) | | | | | | | | |
| 18 | 184081 | 1400.00 | Sqm | 35.21 | 49294.00 | AT Par | 49294.00 | | |