Sales : +91-777 804 8217
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 27-05-2020 | EXTENSION OF TENDER OPENING DATE | Date | 29-05-2020 |
| Name of Work: RRC CASE FOR CHEMICAL CLEANING OF HE/ATUs, COOLERS, CONDENSERS AND AC CHILLERS FITTED ONBOARD ENC SHIPS | |||||
|---|---|---|---|---|---|
| Sl.No. | Description of Services / Spares | HSN / SAC Code | QTY | Units | |
| 1 | 1 | First Year | |||
| 2 | 2 | Services | |||
| 3 | 3 | HE and ATU - Capacity up to 0.025 | |||
| 4 | 3.01 | Removal of ATU/HE including de-lagging, disconnecting associated pipelines | 1 | No.s | |
| 5 | 3.02 | Mechanical Cleaning - Air Side | 1 | No.s | |
| 6 | 3.03 | Chemical Cleaning - Air Side (chemical provided by firm) | 1 | No.s | |
| 7 | 3.04 | Chemical Cleaning - Water Side (chemical provided by firm) | 1 | No.s | |
| 8 | 3.05 | Pressure Testing | 1 | No.s | |
| 9 | 3.06 | Fitment of ATU/HE including associated system pipelines and proving of system onboard | 1 | No.s | |
| 10 | 3.07 | Drilling and Tapping | 48 | No.s | |
| 11 | 3.08 | Manufacturing of Flange | 24 | No.s | |
| 12 | 3.09 | Repair by Welding and Brazing of ATU/HE end cover | 48 | No.s | |
| 13 | 3.1 | Plugging of tube including manufacturing of Plug (provided by firm) | 48 | No.s | |
| 14 | 3.11 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 96 | No.s | |
| 15 | 3.12 | Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning | 48 | No.s | |
| 16 | 3.13 | INSITU mechanical cleaning - Air Side | 48 | No.s | |
| 17 | 3.14 | INSITU chemical cleaning - Air Side (provided by firm) | 96 | No.s | |
| 18 | 3.15 | INSITU chemical cleaning - Water | 48 | No.s | |
| 19 | 3.16 | Fitment of ATU/HE including associated system onboard | 48 | No.s | |
| 20 | 3.17 | Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm) | 96 | No.s | |
| 21 | 3.18 | Transportation from Ship to FMU site and back | 16 | No.s | |
| 22 | 3.19 | Neutralizing of ATU/HE after chemical cleaning | 20 | No.s | |
| 23 | 3.2 | Blanking of system pipeline | 20 | No.s | |
| 24 | 4 | HE and ATU - Capacity from 0.025 to 0.05 | |||
| 25 | 4.01 | Removal of ATU/HE including de-lagging, disconnecting associated pipelines | 1 | No.s | |
| 26 | 4.02 | Mechanical Cleaning - Air Side | 1 | No.s | |
| 27 | 4.03 | Chemical Cleaning - Air Side (chemical provided by firm) | 1 | No.s | |
| 28 | 4.04 | Chemical Cleaning - Water Side (chemical provided by firm) | 1 | No.s | |
| 29 | 4.05 | Pressure Testing | 1 | No.s | |
| 30 | 4.06 | Fitment of ATU/HE including associated system pipelines and proving of system onboard | 1 | No.s | |
| 31 | 4.07 | Drilling and Tapping | 48 | No.s | |
| 32 | 4.08 | Manufacturing of Flange | 24 | No.s | |
| 33 | 4.09 | Repair by Welding and Brazing of ATU/HE end cover | 48 | No.s | |
| 34 | 4.1 | Plugging of tube including manufacturing of Plug (provided by firm) | 48 | No.s | |
| 35 | 4.11 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 96 | No.s | |
| 36 | 4.12 | Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning | 48 | No.s | |
| 37 | 4.13 | INSITU mechanical cleaning - Air Side | 48 | No.s | |
| 38 | 4.14 | INSITU chemical cleaning - Air Side (provided by firm) | 96 | No.s | |
| 39 | 4.15 | INSITU chemical cleaning - Water | 48 | No.s | |
| 40 | 4.16 | Fitment of ATU/HE including associated system onboard | 48 | No.s | |
| 41 | 4.17 | Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm) | 96 | No.s | |
| 42 | 4.18 | Transportation from Ship to FMU site and back | 16 | No.s | |
| 43 | 4.19 | Neutralizing of ATU/HE after chemical cleaning | 20 | No.s | |
| 44 | 4.2 | Blanking of system pipeline | 20 | No.s | |
| 45 | 5 | HE and ATU - Capacity from 0.5 and Above | |||
| 46 | 5.01 | Removal of ATU/HE including de-lagging, disconnecting associated pipelines | 1 | No.s | |
| 47 | 5.02 | Mechanical Cleaning - Air Side | 1 | No.s | |
| 48 | 5.03 | Chemical Cleaning - Air Side (chemical provided by firm) | 1 | No.s | |
| 49 | 5.04 | Chemical Cleaning - Water Side (chemical provided by firm) | 1 | No.s | |
| 50 | 5.05 | Pressure Testing | 1 | No.s | |
| 51 | 5.06 | Fitment of ATU/HE including associated system pipelines and proving of system onboard | 1 | No.s | |
| 52 | 5.07 | Drilling and Tapping | 48 | No.s | |
| 53 | 5.08 | Manufacturing of Flange | 24 | No.s | |
| 54 | 5.09 | Repair by Welding and Brazing of ATU/HE end cover | 48 | No.s | |
| 55 | 5.1 | Plugging of tube including manufacturing of Plug (provided by firm) | 48 | No.s | |
| 56 | 5.11 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 96 | No.s | |
| 57 | 5.12 | Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning | 48 | No.s | |
| 58 | 5.13 | INSITU mechanical cleaning - Air Side | 48 | No.s | |
| 59 | 5.14 | INSITU chemical cleaning - Air Side (provided by firm) | 96 | No.s | |
| 60 | 5.15 | INSITU chemical cleaning - Water | 48 | No.s | |
| 61 | 5.16 | Fitment of ATU/HE including associated system onboard | 48 | No.s | |
| 62 | 5.17 | Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm) | 96 | No.s | |
| 63 | 5.18 | Transportation from Ship to FMU site and back | 16 | No.s | |
| 64 | 5.19 | Neutralizing of ATU/HE after chemical cleaning | 20 | No.s | |
| 65 | 5.2 | Blanking of system pipeline | 20 | No.s | |
| 66 | 6 | HE and ATU - Capacity from 0.1 to 0.3 | |||
| 67 | 6.01 | Removal of ATU/HE including de-lagging, disconnecting associated pipelines | 1 | No.s | |
| 68 | 6.02 | Mechanical Cleaning - Air Side | 1 | No.s | |
| 69 | 6.03 | Chemical Cleaning - Air Side (chemical provided by firm) | 1 | No.s | |
| 70 | 6.04 | Chemical Cleaning - Water Side (chemical provided by firm) | 1 | No.s | |
| 71 | 6.05 | Pressure Testing | 1 | No.s | |
| 72 | 6.06 | Fitment of ATU/HE including associated system pipelines and proving of system onboard | 1 | No.s | |
| 73 | 6.07 | Drilling and Tapping | 48 | No.s | |
| 74 | 6.08 | Manufacturing of Flange | 24 | No.s | |
| 75 | 6.09 | Repair by Welding and Brazing of ATU/HE end cover | 48 | No.s | |
| 76 | 6.1 | Plugging of tube including manufacturing of Plug (provided by firm) | 48 | No.s | |
| 77 | 6.11 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 96 | No.s | |
| 78 | 6.12 | Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning | 48 | No.s | |
| 79 | 6.13 | INSITU mechanical cleaning - Air Side | 48 | No.s | |
| 80 | 6.14 | INSITU chemical cleaning - Air Side (provided by firm) | 96 | No.s | |
| 81 | 6.15 | INSITU chemical cleaning - Water | 48 | No.s | |
| 82 | 6.16 | Fitment of ATU/HE including associated system onboard | 48 | No.s | |
| 83 | 6.17 | Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm) | 96 | No.s | |
| 84 | 6.18 | Transportation from Ship to FMU site and back | 16 | No.s | |
| 85 | 6.19 | Neutralizing of ATU/HE after chemical cleaning | 20 | No.s | |
| 86 | 6.2 | Blanking of system pipeline | 20 | No.s | |
| 87 | 7 | HE and ATU - Capacity from 0.3 to 0.5 | |||
| 88 | 7.01 | Removal of ATU/HE including de-lagging, disconnecting associated pipelines | 1 | No.s | |
| 89 | 7.02 | Mechanical Cleaning - Air Side | 1 | No.s | |
| 90 | 7.03 | Chemical Cleaning - Air Side (chemical provided by firm) | 1 | No.s | |
| 91 | 7.04 | Chemical Cleaning - Water Side (chemical provided by firm) | 1 | No.s | |
| 92 | 7.05 | Pressure Testing | 1 | No.s | |
| 93 | 7.06 | Fitment of ATU/HE including associated system pipelines and proving of system onboard | 1 | No.s | |
| 94 | 7.07 | Drilling and Tapping | 48 | No.s | |
| 95 | 7.08 | Manufacturing of Flange | 24 | No.s | |
| 96 | 7.09 | Repair by Welding and Brazing of ATU/HE end cover | 48 | No.s | |
| 97 | 7.1 | Plugging of tube including manufacturing of Plug (provided by firm) | 48 | No.s | |
| 98 | 7.11 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 96 | No.s | |
| 99 | 7.12 | Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning | 48 | No.s | |
| 100 | 7.13 | INSITU mechanical cleaning - Air Side | 48 | No.s | |
| 101 | 7.14 | INSITU chemical cleaning - Air Side (provided by firm) | 96 | No.s | |
| 102 | 7.15 | INSITU chemical cleaning - Water | 48 | No.s | |
| 103 | 7.16 | Fitment of ATU/HE including associated system onboard | 48 | No.s | |
| 104 | 7.17 | Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm) | 96 | No.s | |
| 105 | 7.18 | Transportation from Ship to FMU site and back | 16 | No.s | |
| 106 | 7.19 | Neutralizing of ATU/HE after chemical cleaning | 20 | No.s | |
| 107 | 7.2 | Blanking of system pipeline | 20 | No.s | |
| 108 | 8 | HE and ATU - Capacity from 0.5 and Above | |||
| 109 | 8.01 | Removal of ATU/HE including de-lagging, disconnecting associated pipelines | 1 | No.s | |
| 110 | 8.02 | Mechanical Cleaning - Air Side | 1 | No.s | |
| 111 | 8.03 | Chemical Cleaning - Air Side (chemical provided by firm) | 1 | No.s | |
| 112 | 8.04 | Chemical Cleaning - Water Side (chemical provided by firm) | 1 | No.s | |
| 113 | 8.05 | Pressure Testing | 1 | No.s | |
| 114 | 8.06 | Fitment of ATU/HE including associated system pipelines and proving of system onboard | 1 | No.s | |
| 115 | 8.07 | Drilling and Tapping | 48 | No.s | |
| 116 | 8.08 | Manufacturing of Flange | 24 | No.s | |
| 117 | 8.09 | Repair by Welding and Brazing of ATU/HE end cover | 48 | No.s | |
| 118 | 8.1 | Plugging of tube including manufacturing of Plug (provided by firm) | 48 | No.s | |
| 119 | 8.11 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 96 | No.s | |
| 120 | 8.12 | Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning | 48 | No.s | |
| 121 | 8.13 | INSITU mechanical cleaning - Air Side | 48 | No.s | |
| 122 | 8.14 | INSITU chemical cleaning - Air Side (provided by firm) | 96 | No.s | |
| 123 | 8.15 | INSITU chemical cleaning - Water | 48 | No.s | |
| 124 | 8.16 | Fitment of ATU/HE including associated system onboard | 48 | No.s | |
| 125 | 8.17 | Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm) | 96 | No.s | |
| 126 | 8.18 | Transportation from Ship to FMU site and back | 16 | No.s | |
| 127 | 8.19 | Neutralizing of ATU/HE after chemical cleaning | 20 | No.s | |
| 128 | 8.2 | Blanking of system pipeline | 20 | No.s | |
| 129 | 9 | Condenser/Chillers - Capacity up to 0.025 | |||
| 130 | 9.01 | Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers) | 1 | No.s | |
| 131 | 9.02 | Mechanical Cleaning - Water Side | 1 | No.s | |
| 132 | 9.03 | Chemical Cleaning - Water Side (provided by firm) | 1 | No.s | |
| 133 | 9.04 | Mechanical Cleaning - Gas Side | 1 | No.s | |
| 134 | 9.05 | Fitment of condenser end cover including associated chillers pipeline and proving the system onboard | 1 | No.s | |
| 135 | 9.06 | Drilling and Tapping | 96 | No.s | |
| 136 | 9.07 | Repair by welding and brazing of condenser end cover | 48 | No.s | |
| 137 | 9.08 | Plugging of tube including manufacturing of plug (provided by firm) | 24 | No.s | |
| 138 | 9.09 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 48 | No.s | |
| 139 | 9.1 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 140 | 9.11 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 141 | 10 | Condenser/Chillers - Capacity from 0.025 to 0.05 | |||
| 142 | 10.01 | Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers) | 1 | No.s | |
| 143 | 10.02 | Mechanical Cleaning - Water Side | 1 | No.s | |
| 144 | 10.03 | Chemical Cleaning - Water Side (provided by firm) | 1 | No.s | |
| 145 | 10.04 | Mechanical Cleaning - Gas Side | 1 | No.s | |
| 146 | 10.05 | Fitment of condenser end cover including associated chillers pipeline and proving the system onboard | 1 | No.s | |
| 147 | 10.06 | Drilling and Tapping | 96 | No.s | |
| 148 | 10.07 | Repair by welding and brazing of condenser end cover | 48 | No.s | |
| 149 | 10.08 | Plugging of tube including manufacturing of plug (provided by firm) | 24 | No.s | |
| 150 | 10.09 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 48 | No.s | |
| 151 | 10.1 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 152 | 10.11 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 153 | 11 | Condenser/Chillers - Capacity from 0.05 to 0.1 | |||
| 154 | 11.01 | Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers) | 1 | No.s | |
| 155 | 11.02 | Mechanical Cleaning - Water Side | 1 | No.s | |
| 156 | 11.03 | Chemical Cleaning - Water Side (provided by firm) | 1 | No.s | |
| 157 | 11.04 | Mechanical Cleaning - Gas Side | 1 | No.s | |
| 158 | 11.05 | Fitment of condenser end cover including associated chillers pipeline and proving the system onboard | 1 | No.s | |
| 159 | 11.06 | Drilling and Tapping | 96 | No.s | |
| 160 | 11.07 | Repair by welding and brazing of condenser end cover | 48 | No.s | |
| 161 | 11.08 | Plugging of tube including manufacturing of plug (provided by firm) | 24 | No.s | |
| 162 | 11.09 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 48 | No.s | |
| 163 | 11.1 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 164 | 11.11 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 165 | 12 | Condenser/Chillers - Capacity from 0.1 to 0.3 | |||
| 166 | 12.01 | Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers) | 1 | No.s | |
| 167 | 12.02 | Mechanical Cleaning - Water Side | 1 | No.s | |
| 168 | 12.03 | Chemical Cleaning - Water Side (provided by firm) | 1 | No.s | |
| 169 | 12.04 | Mechanical Cleaning - Gas Side | 1 | No.s | |
| 170 | 12.05 | Fitment of condenser end cover including associated chillers pipeline and proving the system onboard | 1 | No.s | |
| 171 | 12.06 | Drilling and Tapping | 96 | No.s | |
| 172 | 12.07 | Repair by welding and brazing of condenser end cover | 48 | No.s | |
| 173 | 12.08 | Plugging of tube including manufacturing of plug (provided by firm) | 24 | No.s | |
| 174 | 12.09 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 48 | No.s | |
| 175 | 12.1 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 176 | 12.11 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 177 | 13 | Condenser/Chillers - Capacity from 0.3 to 0.5 | |||
| 178 | 13.01 | Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers) | 1 | No.s | |
| 179 | 13.02 | Mechanical Cleaning - Water Side | 1 | No.s | |
| 180 | 13.03 | Chemical Cleaning - Water Side (provided by firm) | 1 | No.s | |
| 181 | 13.04 | Mechanical Cleaning - Gas Side | 1 | No.s | |
| 182 | 13.05 | Fitment of condenser end cover including associated chillers pipeline and proving the system onboard | 1 | No.s | |
| 183 | 13.06 | Drilling and Tapping | 96 | No.s | |
| 184 | 13.07 | Repair by welding and brazing of condenser end cover | 48 | No.s | |
| 185 | 13.08 | Plugging of tube including manufacturing of plug (provided by firm) | 24 | No.s | |
| 186 | 13.09 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 48 | No.s | |
| 187 | 13.1 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 188 | 13.11 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 189 | 14 | Condenser/Chillers - Capacity from 0.5 and Above | |||
| 190 | 14.01 | Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers) | 1 | No.s | |
| 191 | 14.02 | Mechanical Cleaning - Water Side | 1 | No.s | |
| 192 | 14.03 | Chemical Cleaning - Water Side (provided by firm) | 1 | No.s | |
| 193 | 14.04 | Mechanical Cleaning - Gas Side | 1 | No.s | |
| 194 | 14.05 | Fitment of condenser end cover including associated chillers pipeline and proving the system onboard | 1 | No.s | |
| 195 | 14.06 | Drilling and Tapping | 96 | No.s | |
| 196 | 14.07 | Repair by welding and brazing of condenser end cover | 48 | No.s | |
| 197 | 14.08 | Plugging of tube including manufacturing of plug (provided by firm) | 24 | No.s | |
| 198 | 14.09 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 48 | No.s | |
| 199 | 14.1 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 200 | 14.11 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 201 | 15 | Coolers - Capacity up to 0.025 | |||
| 202 | 15.01 | Removal of Cooler including associated system pipelines | 1 | No.s | |
| 203 | 15.02 | F/W Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 204 | 15.03 | F/W Cooler - Mechanical cleaning | 1 | No.s | |
| 205 | 15.04 | Lub Oil Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 206 | 15.05 | Radiator mechanical cleaning | 1 | No.s | |
| 207 | 15.06 | Radiator chemical cleaning (provided by firm) | 1 | No.s | |
| 208 | 15.07 | CPP Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 209 | 15.08 | General Cooler - Mechanical cleaning | 24 | No.s | |
| 210 | 15.09 | Generator Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 211 | 15.1 | Hydraulic Cooler - Chemical cleaning (provided by firm) | 96 | No.s | |
| 212 | 15.11 | Gear Box Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 213 | 15.12 | Air Compressor / Cooling Coil chemical cleaning (provided by firm) | 24 | No.s | |
| 214 | 15.13 | Fitment of cooler including associated chillers pipeline and proving the system onboard | 48 | No.s | |
| 215 | 15.14 | Drilling and Tapping | 1 | No.s | |
| 216 | 15.15 | Plugging of tube including manufacturing of plug (provided by firm) | 1 | No.s | |
| 217 | 15.16 | Repair by welding and brazing of condenser end cover | 1 | No.s | |
| 218 | 15.17 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 1 | No.s | |
| 219 | 15.18 | Removal of associated system pipeline for INSITU cleaning of fresh water Cooler | 1 | No.s | |
| 220 | 15.19 | Chemical cleaning of cooler (provided by firm) | 24 | No.s | |
| 221 | 15.2 | Mechanical cleaning of cooler | 48 | No.s | |
| 222 | 15.21 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 223 | 15.22 | Chemical cleaning of cooler (provided by firm) | 48 | No.s | |
| 224 | 15.23 | Mechanical cleaning of cooler | 24 | No.s | |
| 225 | 15.24 | Pressure testing of cooler INSITU | 48 | No.s | |
| 226 | 15.25 | Pressure testing of cooler at shop floor | 48 | No.s | |
| 227 | 15.26 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 228 | 15.27 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 229 | 15.28 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 230 | 16 | Coolers - Capacity from 0.025 to 0.05 | |||
| 231 | 16.01 | Removal of Cooler including associated system pipelines | 1 | No.s | |
| 232 | 16.02 | F/W Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 233 | 16.03 | F/W Cooler - Mechanical cleaning | 1 | No.s | |
| 234 | 16.04 | Lub Oil Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 235 | 16.05 | Radiator mechanical cleaning | 1 | No.s | |
| 236 | 16.06 | Radiator chemical cleaning (provided by firm) | 1 | No.s | |
| 237 | 16.07 | CPP Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 238 | 16.08 | General Cooler - Mechanical cleaning | 24 | No.s | |
| 239 | 16.09 | Generator Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 240 | 16.1 | Hydraulic Cooler - Chemical cleaning (provided by firm) | 96 | No.s | |
| 241 | 16.11 | Gear Box Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 242 | 16.12 | Air Compressor / Cooling Coil chemical cleaning (provided by firm) | 24 | No.s | |
| 243 | 16.13 | Fitment of cooler including associated chillers pipeline and proving the system onboard | 48 | No.s | |
| 244 | 16.14 | Drilling and Tapping | 1 | No.s | |
| 245 | 16.15 | Plugging of tube including manufacturing of plug (provided by firm) | 1 | No.s | |
| 246 | 16.16 | Repair by welding and brazing of condenser end cover | 1 | No.s | |
| 247 | 16.17 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 1 | No.s | |
| 248 | 16.18 | Removal of associated system pipeline for INSITU cleaning of fresh water Cooler | 1 | No.s | |
| 249 | 16.19 | Chemical cleaning of cooler (provided by firm) | 24 | No.s | |
| 250 | 16.2 | Mechanical cleaning of cooler | 48 | No.s | |
| 251 | 16.21 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 252 | 16.22 | Chemical cleaning of cooler (provided by firm) | 48 | No.s | |
| 253 | 16.23 | Mechanical cleaning of cooler | 24 | No.s | |
| 254 | 16.24 | Pressure testing of cooler INSITU | 48 | No.s | |
| 255 | 16.25 | Pressure testing of cooler at shop floor | 48 | No.s | |
| 256 | 16.26 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 257 | 16.27 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 258 | 16.28 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 259 | 17 | Coolers - Capacity from 0.05 to 0.1 | |||
| 260 | 17.01 | Removal of Cooler including associated system pipelines | 1 | No.s | |
| 261 | 17.02 | F/W Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 262 | 17.03 | F/W Cooler - Mechanical cleaning | 1 | No.s | |
| 263 | 17.04 | Lub Oil Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 264 | 17.05 | Radiator mechanical cleaning | 1 | No.s | |
| 265 | 17.06 | Radiator chemical cleaning (provided by firm) | 1 | No.s | |
| 266 | 17.07 | CPP Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 267 | 17.08 | General Cooler - Mechanical cleaning | 24 | No.s | |
| 268 | 17.09 | Generator Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 269 | 17.1 | Hydraulic Cooler - Chemical cleaning (provided by firm) | 96 | No.s | |
| 270 | 17.11 | Gear Box Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 271 | 17.12 | Air Compressor / Cooling Coil chemical cleaning (provided by firm) | 24 | No.s | |
| 272 | 17.13 | Fitment of cooler including associated chillers pipeline and proving the system onboard | 48 | No.s | |
| 273 | 17.14 | Drilling and Tapping | 1 | No.s | |
| 274 | 17.15 | Plugging of tube including manufacturing of plug (provided by firm) | 1 | No.s | |
| 275 | 17.16 | Repair by welding and brazing of condenser end cover | 1 | No.s | |
| 276 | 17.17 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 1 | No.s | |
| 277 | 17.18 | Removal of associated system pipeline for INSITU cleaning of fresh water Cooler | 1 | No.s | |
| 278 | 17.19 | Chemical cleaning of cooler (provided by firm) | 24 | No.s | |
| 279 | 17.2 | Mechanical cleaning of cooler | 48 | No.s | |
| 280 | 17.21 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 281 | 17.22 | Chemical cleaning of cooler (provided by firm) | 48 | No.s | |
| 282 | 17.23 | Mechanical cleaning of cooler | 24 | No.s | |
| 283 | 17.24 | Pressure testing of cooler INSITU | 48 | No.s | |
| 284 | 17.25 | Pressure testing of cooler at shop floor | 48 | No.s | |
| 285 | 17.26 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 286 | 17.27 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 287 | 17.28 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 288 | 18 | Coolers - Capacity from 0.1 to 0.3 | |||
| 289 | 18.01 | Removal of Cooler including associated system pipelines | 1 | No.s | |
| 290 | 18.02 | F/W Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 291 | 18.03 | F/W Cooler - Mechanical cleaning | 1 | No.s | |
| 292 | 18.04 | Lub Oil Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 293 | 18.05 | Radiator mechanical cleaning | 1 | No.s | |
| 294 | 18.06 | Radiator chemical cleaning (provided by firm) | 1 | No.s | |
| 295 | 18.07 | CPP Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 296 | 18.08 | General Cooler - Mechanical cleaning | 24 | No.s | |
| 297 | 18.09 | Generator Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 298 | 18.1 | Hydraulic Cooler - Chemical cleaning (provided by firm) | 96 | No.s | |
| 299 | 18.11 | Gear Box Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 300 | 18.12 | Air Compressor / Cooling Coil chemical cleaning (provided by firm) | 24 | No.s | |
| 301 | 18.13 | Fitment of cooler including associated chillers pipeline and proving the system onboard | 48 | No.s | |
| 302 | 18.14 | Drilling and Tapping | 1 | No.s | |
| 303 | 18.15 | Plugging of tube including manufacturing of plug (provided by firm) | 1 | No.s | |
| 304 | 18.16 | Repair by welding and brazing of condenser end cover | 1 | No.s | |
| 305 | 18.17 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 1 | No.s | |
| 306 | 18.18 | Removal of associated system pipeline for INSITU cleaning of fresh water Cooler | 1 | No.s | |
| 307 | 18.19 | Chemical cleaning of cooler (provided by firm) | 24 | No.s | |
| 308 | 18.2 | Mechanical cleaning of cooler | 48 | No.s | |
| 309 | 18.21 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 310 | 18.22 | Chemical cleaning of cooler (provided by firm) | 48 | No.s | |
| 311 | 18.23 | Mechanical cleaning of cooler | 24 | No.s | |
| 312 | 18.24 | Pressure testing of cooler INSITU | 48 | No.s | |
| 313 | 18.25 | Pressure testing of cooler at shop floor | 48 | No.s | |
| 314 | 18.26 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 315 | 18.27 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 316 | 18.28 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 317 | 19 | Coolers - Capacity from 0.3 to 0.5 | |||
| 318 | 19.01 | Removal of Cooler including associated system pipelines | 1 | No.s | |
| 319 | 19.02 | F/W Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 320 | 19.03 | F/W Cooler - Mechanical cleaning | 1 | No.s | |
| 321 | 19.04 | Lub Oil Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 322 | 19.05 | Radiator mechanical cleaning | 1 | No.s | |
| 323 | 19.06 | Radiator chemical cleaning (provided by firm) | 1 | No.s | |
| 324 | 19.07 | CPP Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 325 | 19.08 | General Cooler - Mechanical cleaning | 24 | No.s | |
| 326 | 19.09 | Generator Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 327 | 19.1 | Hydraulic Cooler - Chemical cleaning (provided by firm) | 96 | No.s | |
| 328 | 19.11 | Gear Box Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 329 | 19.12 | Air Compressor / Cooling Coil chemical cleaning (provided by firm) | 24 | No.s | |
| 330 | 19.13 | Fitment of cooler including associated chillers pipeline and proving the system onboard | 48 | No.s | |
| 331 | 19.14 | Drilling and Tapping | 1 | No.s | |
| 332 | 19.15 | Plugging of tube including manufacturing of plug (provided by firm) | 1 | No.s | |
| 333 | 19.16 | Repair by welding and brazing of condenser end cover | 1 | No.s | |
| 334 | 19.17 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 1 | No.s | |
| 335 | 19.18 | Removal of associated system pipeline for INSITU cleaning of fresh water Cooler | 1 | No.s | |
| 336 | 19.19 | Chemical cleaning of cooler (provided by firm) | 24 | No.s | |
| 337 | 19.2 | Mechanical cleaning of cooler | 48 | No.s | |
| 338 | 19.21 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 339 | 19.22 | Chemical cleaning of cooler (provided by firm) | 48 | No.s | |
| 340 | 19.23 | Mechanical cleaning of cooler | 24 | No.s | |
| 341 | 19.24 | Pressure testing of cooler INSITU | 48 | No.s | |
| 342 | 19.25 | Pressure testing of cooler at shop floor | 48 | No.s | |
| 343 | 19.26 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 344 | 19.27 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 345 | 19.28 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 346 | 20 | Coolers - Capacity from 0.5 and Above | |||
| 347 | 20.01 | Removal of Cooler including associated system pipelines | 1 | No.s | |
| 348 | 20.02 | F/W Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 349 | 20.03 | F/W Cooler - Mechanical cleaning | 1 | No.s | |
| 350 | 20.04 | Lub Oil Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 351 | 20.05 | Radiator mechanical cleaning | 1 | No.s | |
| 352 | 20.06 | Radiator chemical cleaning (provided by firm) | 1 | No.s | |
| 353 | 20.07 | CPP Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 354 | 20.08 | General Cooler - Mechanical cleaning | 24 | No.s | |
| 355 | 20.09 | Generator Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 356 | 20.1 | Hydraulic Cooler - Chemical cleaning (provided by firm) | 96 | No.s | |
| 357 | 20.11 | Gear Box Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 358 | 20.12 | Air Compressor / Cooling Coil chemical cleaning (provided by firm) | 24 | No.s | |
| 359 | 20.13 | Fitment of cooler including associated chillers pipeline and proving the system onboard | 48 | No.s | |
| 360 | 20.14 | Drilling and Tapping | 1 | No.s | |
| 361 | 20.15 | Plugging of tube including manufacturing of plug (provided by firm) | 1 | No.s | |
| 362 | 20.16 | Repair by welding and brazing of condenser end cover | 1 | No.s | |
| 363 | 20.17 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 1 | No.s | |
| 364 | 20.18 | Removal of associated system pipeline for INSITU cleaning of fresh water Cooler | 1 | No.s | |
| 365 | 20.19 | Chemical cleaning of cooler (provided by firm) | 24 | No.s | |
| 366 | 20.2 | Mechanical cleaning of cooler | 48 | No.s | |
| 367 | 20.21 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 368 | 20.22 | Chemical cleaning of cooler (provided by firm) | 48 | No.s | |
| 369 | 20.23 | Mechanical cleaning of cooler | 24 | No.s | |
| 370 | 20.24 | Pressure testing of cooler INSITU | 48 | No.s | |
| 371 | 20.25 | Pressure testing of cooler at shop floor | 48 | No.s | |
| 372 | 20.26 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 373 | 20.27 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 374 | 20.28 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 375 | 21 | Manufacturing & Fitment of zinc protector with adaptor - Capacity from 0.3 to 0.5 | |||
| 376 | 21.01 | HEs and ATUs | 1 | No.s | |
| 377 | 21.02 | AC Condenser and Chillers | 1 | No.s | |
| 378 | 22 | Manufacturing & Fitment of zinc protector with adaptor Capacity from 0.5 and Above | |||
| 379 | 22.01 | HEs and ATUs | 1 | No.s | |
| 380 | 22.02 | AC Condenser and Chillers | 1 | No.s | |
| 381 | 23 | Spares | |||
| 382 | 24 | HE’s and ATU’s - Capacity up to 0.025 | |||
| 383 | 24.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 384 | 24.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 385 | 24.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 386 | 24.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 387 | 24.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 388 | 25 | HE’s and ATU’s - Capacity from 0.025 to 0.05 | |||
| 389 | 25.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 390 | 25.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 391 | 25.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 392 | 25.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 393 | 25.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 394 | 26 | HE’s and ATU’s - Capacity from 0.05 to 0.1 | |||
| 395 | 26.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 396 | 26.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 397 | 26.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 398 | 26.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 399 | 26.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 400 | 27 | HE’s and ATU’s - Capacity from 0.1 to 0.3 | |||
| 401 | 27.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 402 | 27.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 403 | 27.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 404 | 27.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 405 | 27.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 406 | 28 | HE’s and ATU’s - Capacity from 0.3 to 0.5 | |||
| 407 | 28.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 408 | 28.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 409 | 28.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 410 | 28.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 411 | 28.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 412 | 29 | HE’s and ATU’s - Capacity from 0.5 and above | |||
| 413 | 29.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 414 | 29.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 415 | 29.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 416 | 29.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 417 | 29.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 418 | 30 | Condenser/Chillers - Capacity up to 0.025 | |||
| 419 | 30.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 420 | 30.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 421 | 30.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 422 | 30.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 423 | 30.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 424 | 31 | Condenser/Chillers - Capacity from 0.025 to 0.05 | |||
| 425 | 31.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 426 | 31.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 427 | 31.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 428 | 31.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 429 | 31.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 430 | 32 | Condenser/Chillers - Capacity from 0.05 to 0.1 | |||
| 431 | 32.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 432 | 32.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 433 | 32.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 434 | 32.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 435 | 32.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 436 | 33 | Condenser/Chillers - Capacity from 0.1 to 0.3 | |||
| 437 | 33.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 438 | 33.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 439 | 33.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 440 | 33.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 441 | 33.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 442 | 34 | Condenser/Chillers - Capacity from 0.3 to 0.5 | |||
| 443 | 34.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 444 | 34.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 445 | 34.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 446 | 34.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 447 | 34.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 448 | 35 | Condenser/Chillers - Capacity from 0.5 and Above | |||
| 449 | 35.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 450 | 35.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 451 | 35.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 452 | 35.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 453 | 35.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 454 | 36 | Coolers - Capacity from up to 0.025 | |||
| 455 | 36.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 456 | 36.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 457 | 36.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 458 | 36.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 459 | 36.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 460 | 37 | Coolers - Capacity from 0.025 to 0.05 | |||
| 461 | 37.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 462 | 37.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 463 | 37.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 464 | 37.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 465 | 37.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 466 | 38 | Coolers - Capacity from 0.05 to 0.1 | |||
| 467 | 38.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 468 | 38.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 469 | 38.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 470 | 38.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 471 | 38.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 472 | 39 | Coolers - Capacity from 0.1 to 0.3 | |||
| 473 | 39.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 474 | 39.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 475 | 39.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 476 | 39.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 477 | 39.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 478 | 40 | Coolers - Capacity from 0.3 to 0.5 | |||
| 479 | 40.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 480 | 40.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 481 | 40.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 482 | 40.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 483 | 40.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 484 | 41 | Coolers - Capacity from 0.5 and Above | |||
| 485 | 41.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 486 | 41.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 487 | 41.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 488 | 41.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 489 | 41.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 490 | 42 | Manufacturing & Fitment of zinc protector with adaptor - Capacity from 0.3 to 0.5 | |||
| 491 | 42.01 | HEs and ATUs | 1 | No.s | |
| 492 | 42.02 | AC Condenser and Chillers | 1 | No.s | |
| 493 | 43 | Manufacturing & Fitment of zinc protector with adaptor - Capacity from 0.5 and Above | |||
| 494 | 43.01 | HEs and ATUs | 1 | No.s | |
| 495 | 43.02 | AC Condenser and Chillers | 1 | No.s | |
| 496 | 44 | Second Year | |||
| 497 | 45 | Services | |||
| 498 | 46 | HE and ATU - Capacity up to 0.025 | |||
| 499 | 46.01 | Removal of ATU/HE including de-lagging, disconnecting associated pipelines | 1 | No.s | |
| 500 | 46.02 | Mechanical Cleaning - Air Side | 1 | No.s | |
| 501 | 46.03 | Chemical Cleaning - Air Side (chemical provided by firm) | 1 | No.s | |
| 502 | 46.04 | Chemical Cleaning - Water Side (chemical provided by firm) | 1 | No.s | |
| 503 | 46.05 | Pressure Testing | 1 | No.s | |
| 504 | 46.06 | Fitment of ATU/HE including associated system pipelines and proving of system onboard | 1 | No.s | |
| 505 | 46.07 | Drilling and Tapping | 48 | No.s | |
| 506 | 46.08 | Manufacturing of Flange | 24 | No.s | |
| 507 | 46.09 | Repair by Welding and Brazing of ATU/HE end cover | 48 | No.s | |
| 508 | 46.1 | Plugging of tube including manufacturing of Plug (provided by firm) | 48 | No.s | |
| 509 | 46.11 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 96 | No.s | |
| 510 | 46.12 | Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning | 48 | No.s | |
| 511 | 46.13 | INSITU mechanical cleaning - Air Side | 48 | No.s | |
| 512 | 46.14 | INSITU chemical cleaning - Air Side (provided by firm) | 96 | No.s | |
| 513 | 46.15 | INSITU chemical cleaning - Water | 48 | No.s | |
| 514 | 46.16 | Fitment of ATU/HE including associated system onboard | 48 | No.s | |
| 515 | 46.17 | Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm) | 96 | No.s | |
| 516 | 46.18 | Transportation from Ship to FMU site and back | 16 | No.s | |
| 517 | 46.19 | Neutralizing of ATU/HE after chemical cleaning | 20 | No.s | |
| 518 | 46.2 | Blanking of system pipeline | 20 | No.s | |
| 519 | 47 | HE and ATU - Capacity from 0.025 to 0.05 | |||
| 520 | 47.01 | Removal of ATU/HE including de-lagging, disconnecting associated pipelines | 1 | No.s | |
| 521 | 47.02 | Mechanical Cleaning - Air Side | 1 | No.s | |
| 522 | 47.03 | Chemical Cleaning - Air Side (chemical provided by firm) | 1 | No.s | |
| 523 | 47.04 | Chemical Cleaning - Water Side (chemical provided by firm) | 1 | No.s | |
| 524 | 47.05 | Pressure Testing | 1 | No.s | |
| 525 | 47.06 | Fitment of ATU/HE including associated system pipelines and proving of system onboard | 1 | No.s | |
| 526 | 47.07 | Drilling and Tapping | 48 | No.s | |
| 527 | 47.08 | Manufacturing of Flange | 24 | No.s | |
| 528 | 47.09 | Repair by Welding and Brazing of ATU/HE end cover | 48 | No.s | |
| 529 | 47.1 | Plugging of tube including manufacturing of Plug (provided by firm) | 48 | No.s | |
| 530 | 47.11 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 96 | No.s | |
| 531 | 47.12 | Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning | 48 | No.s | |
| 532 | 47.13 | INSITU mechanical cleaning - Air Side | 48 | No.s | |
| 533 | 47.14 | INSITU chemical cleaning - Air Side (provided by firm) | 96 | No.s | |
| 534 | 47.15 | INSITU chemical cleaning - Water | 48 | No.s | |
| 535 | 47.16 | Fitment of ATU/HE including associated system onboard | 48 | No.s | |
| 536 | 47.17 | Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm) | 96 | No.s | |
| 537 | 47.18 | Transportation from Ship to FMU site and back | 16 | No.s | |
| 538 | 47.19 | Neutralizing of ATU/HE after chemical cleaning | 20 | No.s | |
| 539 | 47.2 | Blanking of system pipeline | 20 | No.s | |
| 540 | 48 | HE and ATU - Capacity from 0.5 and Above | |||
| 541 | 48.01 | Removal of ATU/HE including de-lagging, disconnecting associated pipelines | 1 | No.s | |
| 542 | 48.02 | Mechanical Cleaning - Air Side | 1 | No.s | |
| 543 | 48.03 | Chemical Cleaning - Air Side (chemical provided by firm) | 1 | No.s | |
| 544 | 48.04 | Chemical Cleaning - Water Side (chemical provided by firm) | 1 | No.s | |
| 545 | 48.05 | Pressure Testing | 1 | No.s | |
| 546 | 48.06 | Fitment of ATU/HE including associated system pipelines and proving of system onboard | 1 | No.s | |
| 547 | 48.07 | Drilling and Tapping | 48 | No.s | |
| 548 | 48.08 | Manufacturing of Flange | 24 | No.s | |
| 549 | 48.09 | Repair by Welding and Brazing of ATU/HE end cover | 48 | No.s | |
| 550 | 48.1 | Plugging of tube including manufacturing of Plug (provided by firm) | 48 | No.s | |
| 551 | 48.11 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 96 | No.s | |
| 552 | 48.12 | Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning | 48 | No.s | |
| 553 | 48.13 | INSITU mechanical cleaning - Air Side | 48 | No.s | |
| 554 | 48.14 | INSITU chemical cleaning - Air Side (provided by firm) | 96 | No.s | |
| 555 | 48.15 | INSITU chemical cleaning - Water | 48 | No.s | |
| 556 | 48.16 | Fitment of ATU/HE including associated system onboard | 48 | No.s | |
| 557 | 48.17 | Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm) | 96 | No.s | |
| 558 | 48.18 | Transportation from Ship to FMU site and back | 16 | No.s | |
| 559 | 48.19 | Neutralizing of ATU/HE after chemical cleaning | 20 | No.s | |
| 560 | 48.2 | Blanking of system pipeline | 20 | No.s | |
| 561 | 49 | HE and ATU - Capacity from 0.1 to 0.3 | |||
| 562 | 49.01 | Removal of ATU/HE including de-lagging, disconnecting associated pipelines | 1 | No.s | |
| 563 | 49.02 | Mechanical Cleaning - Air Side | 1 | No.s | |
| 564 | 49.03 | Chemical Cleaning - Air Side (chemical provided by firm) | 1 | No.s | |
| 565 | 49.04 | Chemical Cleaning - Water Side (chemical provided by firm) | 1 | No.s | |
| 566 | 49.05 | Pressure Testing | 1 | No.s | |
| 567 | 49.06 | Fitment of ATU/HE including associated system pipelines and proving of system onboard | 1 | No.s | |
| 568 | 49.07 | Drilling and Tapping | 48 | No.s | |
| 569 | 49.08 | Manufacturing of Flange | 24 | No.s | |
| 570 | 49.09 | Repair by Welding and Brazing of ATU/HE end cover | 48 | No.s | |
| 571 | 49.1 | Plugging of tube including manufacturing of Plug (provided by firm) | 48 | No.s | |
| 572 | 49.11 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 96 | No.s | |
| 573 | 49.12 | Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning | 48 | No.s | |
| 574 | 49.13 | INSITU mechanical cleaning - Air Side | 48 | No.s | |
| 575 | 49.14 | INSITU chemical cleaning - Air Side (provided by firm) | 96 | No.s | |
| 576 | 49.15 | INSITU chemical cleaning - Water | 48 | No.s | |
| 577 | 49.16 | Fitment of ATU/HE including associated system onboard | 48 | No.s | |
| 578 | 49.17 | Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm) | 96 | No.s | |
| 579 | 49.18 | Transportation from Ship to FMU site and back | 16 | No.s | |
| 580 | 49.19 | Neutralizing of ATU/HE after chemical cleaning | 20 | No.s | |
| 581 | 49.2 | Blanking of system pipeline | 20 | No.s | |
| 582 | 50 | HE and ATU - Capacity from 0.3 to 0.5 | |||
| 583 | 50.01 | Removal of ATU/HE including de-lagging, disconnecting associated pipelines | 1 | No.s | |
| 584 | 50.02 | Mechanical Cleaning - Air Side | 1 | No.s | |
| 585 | 50.03 | Chemical Cleaning - Air Side (chemical provided by firm) | 1 | No.s | |
| 586 | 50.04 | Chemical Cleaning - Water Side (chemical provided by firm) | 1 | No.s | |
| 587 | 50.05 | Pressure Testing | 1 | No.s | |
| 588 | 50.06 | Fitment of ATU/HE including associated system pipelines and proving of system onboard | 1 | No.s | |
| 589 | 50.07 | Drilling and Tapping | 48 | No.s | |
| 590 | 50.08 | Manufacturing of Flange | 24 | No.s | |
| 591 | 50.09 | Repair by Welding and Brazing of ATU/HE end cover | 48 | No.s | |
| 592 | 50.1 | Plugging of tube including manufacturing of Plug (provided by firm) | 48 | No.s | |
| 593 | 50.11 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 96 | No.s | |
| 594 | 50.12 | Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning | 48 | No.s | |
| 595 | 50.13 | INSITU mechanical cleaning - Air Side | 48 | No.s | |
| 596 | 50.14 | INSITU chemical cleaning - Air Side (provided by firm) | 96 | No.s | |
| 597 | 50.15 | INSITU chemical cleaning - Water | 48 | No.s | |
| 598 | 50.16 | Fitment of ATU/HE including associated system onboard | 48 | No.s | |
| 599 | 50.17 | Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm) | 96 | No.s | |
| 600 | 50.18 | Transportation from Ship to FMU site and back | 16 | No.s | |
| 601 | 50.19 | Neutralizing of ATU/HE after chemical cleaning | 20 | No.s | |
| 602 | 50.2 | Blanking of system pipeline | 20 | No.s | |
| 603 | 51 | HE and ATU - Capacity from 0.5 and Above | |||
| 604 | 51.01 | Removal of ATU/HE including de-lagging, disconnecting associated pipelines | 1 | No.s | |
| 605 | 51.02 | Mechanical Cleaning - Air Side | 1 | No.s | |
| 606 | 51.03 | Chemical Cleaning - Air Side (chemical provided by firm) | 1 | No.s | |
| 607 | 51.04 | Chemical Cleaning - Water Side (chemical provided by firm) | 1 | No.s | |
| 608 | 51.05 | Pressure Testing | 1 | No.s | |
| 609 | 51.06 | Fitment of ATU/HE including associated system pipelines and proving of system onboard | 1 | No.s | |
| 610 | 51.07 | Drilling and Tapping | 48 | No.s | |
| 611 | 51.08 | Manufacturing of Flange | 24 | No.s | |
| 612 | 51.09 | Repair by Welding and Brazing of ATU/HE end cover | 48 | No.s | |
| 613 | 51.1 | Plugging of tube including manufacturing of Plug (provided by firm) | 48 | No.s | |
| 614 | 51.11 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 96 | No.s | |
| 615 | 51.12 | Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning | 48 | No.s | |
| 616 | 51.13 | INSITU mechanical cleaning - Air Side | 48 | No.s | |
| 617 | 51.14 | INSITU chemical cleaning - Air Side (provided by firm) | 96 | No.s | |
| 618 | 51.15 | INSITU chemical cleaning - Water | 48 | No.s | |
| 619 | 51.16 | Fitment of ATU/HE including associated system onboard | 48 | No.s | |
| 620 | 51.17 | Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm) | 96 | No.s | |
| 621 | 51.18 | Transportation from Ship to FMU site and back | 16 | No.s | |
| 622 | 51.19 | Neutralizing of ATU/HE after chemical cleaning | 20 | No.s | |
| 623 | 51.2 | Blanking of system pipeline | 20 | No.s | |
| 624 | 52 | Condenser/Chillers - Capacity up to 0.025 | |||
| 625 | 52.01 | Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers) | 1 | No.s | |
| 626 | 52.02 | Mechanical Cleaning - Water Side | 1 | No.s | |
| 627 | 52.03 | Chemical Cleaning - Water Side (provided by firm) | 1 | No.s | |
| 628 | 52.04 | Mechanical Cleaning - Gas Side | 1 | No.s | |
| 629 | 52.05 | Fitment of condenser end cover including associated chillers pipeline and proving the system onboard | 1 | No.s | |
| 630 | 52.06 | Drilling and Tapping | 96 | No.s | |
| 631 | 52.07 | Repair by welding and brazing of condenser end cover | 48 | No.s | |
| 632 | 52.08 | Plugging of tube including manufacturing of plug (provided by firm) | 24 | No.s | |
| 633 | 52.09 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 48 | No.s | |
| 634 | 52.1 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 635 | 52.11 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 636 | 53 | Condenser/Chillers - Capacity from 0.025 to 0.05 | |||
| 637 | 53.01 | Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers) | 1 | No.s | |
| 638 | 53.02 | Mechanical Cleaning - Water Side | 1 | No.s | |
| 639 | 53.03 | Chemical Cleaning - Water Side (provided by firm) | 1 | No.s | |
| 640 | 53.04 | Mechanical Cleaning - Gas Side | 1 | No.s | |
| 641 | 53.05 | Fitment of condenser end cover including associated chillers pipeline and proving the system onboard | 1 | No.s | |
| 642 | 53.06 | Drilling and Tapping | 96 | No.s | |
| 643 | 53.07 | Repair by welding and brazing of condenser end cover | 48 | No.s | |
| 644 | 53.08 | Plugging of tube including manufacturing of plug (provided by firm) | 24 | No.s | |
| 645 | 53.09 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 48 | No.s | |
| 646 | 53.1 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 647 | 53.11 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 648 | 54 | Condenser/Chillers - Capacity from 0.05 to 0.1 | |||
| 649 | 54.01 | Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers) | 1 | No.s | |
| 650 | 54.02 | Mechanical Cleaning - Water Side | 1 | No.s | |
| 651 | 54.03 | Chemical Cleaning - Water Side (provided by firm) | 1 | No.s | |
| 652 | 54.04 | Mechanical Cleaning - Gas Side | 1 | No.s | |
| 653 | 54.05 | Fitment of condenser end cover including associated chillers pipeline and proving the system onboard | 1 | No.s | |
| 654 | 54.06 | Drilling and Tapping | 96 | No.s | |
| 655 | 54.07 | Repair by welding and brazing of condenser end cover | 48 | No.s | |
| 656 | 54.08 | Plugging of tube including manufacturing of plug (provided by firm) | 24 | No.s | |
| 657 | 54.09 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 48 | No.s | |
| 658 | 54.1 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 659 | 54.11 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 660 | 55 | Condenser/Chillers - Capacity from 0.1 to 0.3 | |||
| 661 | 55.01 | Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers) | 1 | No.s | |
| 662 | 55.02 | Mechanical Cleaning - Water Side | 1 | No.s | |
| 663 | 55.03 | Chemical Cleaning - Water Side (provided by firm) | 1 | No.s | |
| 664 | 55.04 | Mechanical Cleaning - Gas Side | 1 | No.s | |
| 665 | 55.05 | Fitment of condenser end cover including associated chillers pipeline and proving the system onboard | 1 | No.s | |
| 666 | 55.06 | Drilling and Tapping | 96 | No.s | |
| 667 | 55.07 | Repair by welding and brazing of condenser end cover | 48 | No.s | |
| 668 | 55.08 | Plugging of tube including manufacturing of plug (provided by firm) | 24 | No.s | |
| 669 | 55.09 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 48 | No.s | |
| 670 | 55.1 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 671 | 55.11 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 672 | 56 | Condenser/Chillers - Capacity from 0.3 to 0.5 | |||
| 673 | 56.01 | Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers) | 1 | No.s | |
| 674 | 56.02 | Mechanical Cleaning - Water Side | 1 | No.s | |
| 675 | 56.03 | Chemical Cleaning - Water Side (provided by firm) | 1 | No.s | |
| 676 | 56.04 | Mechanical Cleaning - Gas Side | 1 | No.s | |
| 677 | 56.05 | Fitment of condenser end cover including associated chillers pipeline and proving the system onboard | 1 | No.s | |
| 678 | 56.06 | Drilling and Tapping | 96 | No.s | |
| 679 | 56.07 | Repair by welding and brazing of condenser end cover | 48 | No.s | |
| 680 | 56.08 | Plugging of tube including manufacturing of plug (provided by firm) | 24 | No.s | |
| 681 | 56.09 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 48 | No.s | |
| 682 | 56.1 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 683 | 56.11 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 684 | 57 | Condenser/Chillers - Capacity from 0.5 and Above | |||
| 685 | 57.01 | Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers) | 1 | No.s | |
| 686 | 57.02 | Mechanical Cleaning - Water Side | 1 | No.s | |
| 687 | 57.03 | Chemical Cleaning - Water Side (provided by firm) | 1 | No.s | |
| 688 | 57.04 | Mechanical Cleaning - Gas Side | 1 | No.s | |
| 689 | 57.05 | Fitment of condenser end cover including associated chillers pipeline and proving the system onboard | 1 | No.s | |
| 690 | 57.06 | Drilling and Tapping | 96 | No.s | |
| 691 | 57.07 | Repair by welding and brazing of condenser end cover | 48 | No.s | |
| 692 | 57.08 | Plugging of tube including manufacturing of plug (provided by firm) | 24 | No.s | |
| 693 | 57.09 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 48 | No.s | |
| 694 | 57.1 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 695 | 57.11 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 696 | 58 | Coolers - Capacity up to 0.025 | |||
| 697 | 58.01 | Removal of Cooler including associated system pipelines | 1 | No.s | |
| 698 | 58.02 | F/W Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 699 | 58.03 | F/W Cooler - Mechanical cleaning | 1 | No.s | |
| 700 | 58.04 | Lub Oil Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 701 | 58.05 | Radiator mechanical cleaning | 1 | No.s | |
| 702 | 58.06 | Radiator chemical cleaning (provided by firm) | 1 | No.s | |
| 703 | 58.07 | CPP Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 704 | 58.08 | General Cooler - Mechanical cleaning | 24 | No.s | |
| 705 | 58.09 | Generator Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 706 | 58.1 | Hydraulic Cooler - Chemical cleaning (provided by firm) | 96 | No.s | |
| 707 | 58.11 | Gear Box Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 708 | 58.12 | Air Compressor / Cooling Coil chemical cleaning (provided by firm) | 24 | No.s | |
| 709 | 58.13 | Fitment of cooler including associated chillers pipeline and proving the system onboard | 48 | No.s | |
| 710 | 58.14 | Drilling and Tapping | 1 | No.s | |
| 711 | 58.15 | Plugging of tube including manufacturing of plug (provided by firm) | 1 | No.s | |
| 712 | 58.16 | Repair by welding and brazing of condenser end cover | 1 | No.s | |
| 713 | 58.17 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 1 | No.s | |
| 714 | 58.18 | Removal of associated system pipeline for INSITU cleaning of fresh water Cooler | 1 | No.s | |
| 715 | 58.19 | Chemical cleaning of cooler (provided by firm) | 24 | No.s | |
| 716 | 58.2 | Mechanical cleaning of cooler | 48 | No.s | |
| 717 | 58.21 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 718 | 58.22 | Chemical cleaning of cooler (provided by firm) | 48 | No.s | |
| 719 | 58.23 | Mechanical cleaning of cooler | 24 | No.s | |
| 720 | 58.24 | Pressure testing of cooler INSITU | 48 | No.s | |
| 721 | 58.25 | Pressure testing of cooler at shop floor | 48 | No.s | |
| 722 | 58.26 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 723 | 58.27 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 724 | 58.28 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 725 | 59 | Coolers - Capacity from 0.025 to 0.05 | |||
| 726 | 59.01 | Removal of Cooler including associated system pipelines | 1 | No.s | |
| 727 | 59.02 | F/W Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 728 | 59.03 | F/W Cooler - Mechanical cleaning | 1 | No.s | |
| 729 | 59.04 | Lub Oil Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 730 | 59.05 | Radiator mechanical cleaning | 1 | No.s | |
| 731 | 59.06 | Radiator chemical cleaning (provided by firm) | 1 | No.s | |
| 732 | 59.07 | CPP Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 733 | 59.08 | General Cooler - Mechanical cleaning | 24 | No.s | |
| 734 | 59.09 | Generator Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 735 | 59.1 | Hydraulic Cooler - Chemical cleaning (provided by firm) | 96 | No.s | |
| 736 | 59.11 | Gear Box Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 737 | 59.12 | Air Compressor / Cooling Coil chemical cleaning (provided by firm) | 24 | No.s | |
| 738 | 59.13 | Fitment of cooler including associated chillers pipeline and proving the system onboard | 48 | No.s | |
| 739 | 59.14 | Drilling and Tapping | 1 | No.s | |
| 740 | 59.15 | Plugging of tube including manufacturing of plug (provided by firm) | 1 | No.s | |
| 741 | 59.16 | Repair by welding and brazing of condenser end cover | 1 | No.s | |
| 742 | 59.17 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 1 | No.s | |
| 743 | 59.18 | Removal of associated system pipeline for INSITU cleaning of fresh water Cooler | 1 | No.s | |
| 744 | 59.19 | Chemical cleaning of cooler (provided by firm) | 24 | No.s | |
| 745 | 59.2 | Mechanical cleaning of cooler | 48 | No.s | |
| 746 | 59.21 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 747 | 59.22 | Chemical cleaning of cooler (provided by firm) | 48 | No.s | |
| 748 | 59.23 | Mechanical cleaning of cooler | 24 | No.s | |
| 749 | 59.24 | Pressure testing of cooler INSITU | 48 | No.s | |
| 750 | 59.25 | Pressure testing of cooler at shop floor | 48 | No.s | |
| 751 | 59.26 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 752 | 59.27 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 753 | 59.28 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 754 | 60 | Coolers - Capacity from 0.05 to 0.1 | |||
| 755 | 60.01 | Removal of Cooler including associated system pipelines | 1 | No.s | |
| 756 | 60.02 | F/W Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 757 | 60.03 | F/W Cooler - Mechanical cleaning | 1 | No.s | |
| 758 | 60.04 | Lub Oil Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 759 | 60.05 | Radiator mechanical cleaning | 1 | No.s | |
| 760 | 60.06 | Radiator chemical cleaning (provided by firm) | 1 | No.s | |
| 761 | 60.07 | CPP Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 762 | 60.08 | General Cooler - Mechanical cleaning | 24 | No.s | |
| 763 | 60.09 | Generator Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 764 | 60.1 | Hydraulic Cooler - Chemical cleaning (provided by firm) | 96 | No.s | |
| 765 | 60.11 | Gear Box Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 766 | 60.12 | Air Compressor / Cooling Coil chemical cleaning (provided by firm) | 24 | No.s | |
| 767 | 60.13 | Fitment of cooler including associated chillers pipeline and proving the system onboard | 48 | No.s | |
| 768 | 60.14 | Drilling and Tapping | 1 | No.s | |
| 769 | 60.15 | Plugging of tube including manufacturing of plug (provided by firm) | 1 | No.s | |
| 770 | 60.16 | Repair by welding and brazing of condenser end cover | 1 | No.s | |
| 771 | 60.17 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 1 | No.s | |
| 772 | 60.18 | Removal of associated system pipeline for INSITU cleaning of fresh water Cooler | 1 | No.s | |
| 773 | 60.19 | Chemical cleaning of cooler (provided by firm) | 24 | No.s | |
| 774 | 60.2 | Mechanical cleaning of cooler | 48 | No.s | |
| 775 | 60.21 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 776 | 60.22 | Chemical cleaning of cooler (provided by firm) | 48 | No.s | |
| 777 | 60.23 | Mechanical cleaning of cooler | 24 | No.s | |
| 778 | 60.24 | Pressure testing of cooler INSITU | 48 | No.s | |
| 779 | 60.25 | Pressure testing of cooler at shop floor | 48 | No.s | |
| 780 | 60.26 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 781 | 60.27 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 782 | 60.28 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 783 | 61 | Coolers - Capacity from 0.1 to 0.3 | |||
| 784 | 61.01 | Removal of Cooler including associated system pipelines | 1 | No.s | |
| 785 | 61.02 | F/W Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 786 | 61.03 | F/W Cooler - Mechanical cleaning | 1 | No.s | |
| 787 | 61.04 | Lub Oil Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 788 | 61.05 | Radiator mechanical cleaning | 1 | No.s | |
| 789 | 61.06 | Radiator chemical cleaning (provided by firm) | 1 | No.s | |
| 790 | 61.07 | CPP Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 791 | 61.08 | General Cooler - Mechanical cleaning | 24 | No.s | |
| 792 | 61.09 | Generator Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 793 | 61.1 | Hydraulic Cooler - Chemical cleaning (provided by firm) | 96 | No.s | |
| 794 | 61.11 | Gear Box Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 795 | 61.12 | Air Compressor / Cooling Coil chemical cleaning (provided by firm) | 24 | No.s | |
| 796 | 61.13 | Fitment of cooler including associated chillers pipeline and proving the system onboard | 48 | No.s | |
| 797 | 61.14 | Drilling and Tapping | 1 | No.s | |
| 798 | 61.15 | Plugging of tube including manufacturing of plug (provided by firm) | 1 | No.s | |
| 799 | 61.16 | Repair by welding and brazing of condenser end cover | 1 | No.s | |
| 800 | 61.17 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 1 | No.s | |
| 801 | 61.18 | Removal of associated system pipeline for INSITU cleaning of fresh water Cooler | 1 | No.s | |
| 802 | 61.19 | Chemical cleaning of cooler (provided by firm) | 24 | No.s | |
| 803 | 61.2 | Mechanical cleaning of cooler | 48 | No.s | |
| 804 | 61.21 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 805 | 61.22 | Chemical cleaning of cooler (provided by firm) | 48 | No.s | |
| 806 | 61.23 | Mechanical cleaning of cooler | 24 | No.s | |
| 807 | 61.24 | Pressure testing of cooler INSITU | 48 | No.s | |
| 808 | 61.25 | Pressure testing of cooler at shop floor | 48 | No.s | |
| 809 | 61.26 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 810 | 61.27 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 811 | 61.28 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 812 | 62 | Coolers - Capacity from 0.3 to 0.5 | |||
| 813 | 62.01 | Removal of Cooler including associated system pipelines | 1 | No.s | |
| 814 | 62.02 | F/W Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 815 | 62.03 | F/W Cooler - Mechanical cleaning | 1 | No.s | |
| 816 | 62.04 | Lub Oil Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 817 | 62.05 | Radiator mechanical cleaning | 1 | No.s | |
| 818 | 62.06 | Radiator chemical cleaning (provided by firm) | 1 | No.s | |
| 819 | 62.07 | CPP Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 820 | 62.08 | General Cooler - Mechanical cleaning | 24 | No.s | |
| 821 | 62.09 | Generator Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 822 | 62.1 | Hydraulic Cooler - Chemical cleaning (provided by firm) | 96 | No.s | |
| 823 | 62.11 | Gear Box Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 824 | 62.12 | Air Compressor / Cooling Coil chemical cleaning (provided by firm) | 24 | No.s | |
| 825 | 62.13 | Fitment of cooler including associated chillers pipeline and proving the system onboard | 48 | No.s | |
| 826 | 62.14 | Drilling and Tapping | 1 | No.s | |
| 827 | 62.15 | Plugging of tube including manufacturing of plug (provided by firm) | 1 | No.s | |
| 828 | 62.16 | Repair by welding and brazing of condenser end cover | 1 | No.s | |
| 829 | 62.17 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 1 | No.s | |
| 830 | 62.18 | Removal of associated system pipeline for INSITU cleaning of fresh water Cooler | 1 | No.s | |
| 831 | 62.19 | Chemical cleaning of cooler (provided by firm) | 24 | No.s | |
| 832 | 62.2 | Mechanical cleaning of cooler | 48 | No.s | |
| 833 | 62.21 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 834 | 62.22 | Chemical cleaning of cooler (provided by firm) | 48 | No.s | |
| 835 | 62.23 | Mechanical cleaning of cooler | 24 | No.s | |
| 836 | 62.24 | Pressure testing of cooler INSITU | 48 | No.s | |
| 837 | 62.25 | Pressure testing of cooler at shop floor | 48 | No.s | |
| 838 | 62.26 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 839 | 62.27 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 840 | 62.28 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 841 | 63 | Coolers - Capacity from 0.5 and Above | |||
| 842 | 63.01 | Removal of Cooler including associated system pipelines | 1 | No.s | |
| 843 | 63.02 | F/W Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 844 | 63.03 | F/W Cooler - Mechanical cleaning | 1 | No.s | |
| 845 | 63.04 | Lub Oil Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 846 | 63.05 | Radiator mechanical cleaning | 1 | No.s | |
| 847 | 63.06 | Radiator chemical cleaning (provided by firm) | 1 | No.s | |
| 848 | 63.07 | CPP Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 849 | 63.08 | General Cooler - Mechanical cleaning | 24 | No.s | |
| 850 | 63.09 | Generator Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 851 | 63.1 | Hydraulic Cooler - Chemical cleaning (provided by firm) | 96 | No.s | |
| 852 | 63.11 | Gear Box Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 853 | 63.12 | Air Compressor / Cooling Coil chemical cleaning (provided by firm) | 24 | No.s | |
| 854 | 63.13 | Fitment of cooler including associated chillers pipeline and proving the system onboard | 48 | No.s | |
| 855 | 63.14 | Drilling and Tapping | 1 | No.s | |
| 856 | 63.15 | Plugging of tube including manufacturing of plug (provided by firm) | 1 | No.s | |
| 857 | 63.16 | Repair by welding and brazing of condenser end cover | 1 | No.s | |
| 858 | 63.17 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 1 | No.s | |
| 859 | 63.18 | Removal of associated system pipeline for INSITU cleaning of fresh water Cooler | 1 | No.s | |
| 860 | 63.19 | Chemical cleaning of cooler (provided by firm) | 24 | No.s | |
| 861 | 63.2 | Mechanical cleaning of cooler | 48 | No.s | |
| 862 | 63.21 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 863 | 63.22 | Chemical cleaning of cooler (provided by firm) | 48 | No.s | |
| 864 | 63.23 | Mechanical cleaning of cooler | 24 | No.s | |
| 865 | 63.24 | Pressure testing of cooler INSITU | 48 | No.s | |
| 866 | 63.25 | Pressure testing of cooler at shop floor | 48 | No.s | |
| 867 | 63.26 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 868 | 63.27 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 869 | 63.28 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 870 | 64 | Manufacturing & Fitment of zinc protector with adaptor - Capacity from 0.3 to 0.5 | |||
| 871 | 64.01 | HEs and ATUs | 1 | No.s | |
| 872 | 64.02 | AC Condenser and Chillers | 1 | No.s | |
| 873 | 65 | Manufacturing & Fitment of zinc protector with adaptor Capacity from 0.5 and Above | |||
| 874 | 65.01 | HEs and ATUs | 1 | No.s | |
| 875 | 65.02 | AC Condenser and Chillers | 1 | No.s | |
| 876 | 66 | Spares | |||
| 877 | 67 | HE’s and ATU’s - Capacity up to 0.025 | |||
| 878 | 67.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 879 | 67.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 880 | 67.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 881 | 67.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 882 | 67.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 883 | 68 | HE’s and ATU’s - Capacity from 0.025 to 0.05 | |||
| 884 | 68.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 885 | 68.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 886 | 68.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 887 | 68.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 888 | 68.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 889 | 69 | HE’s and ATU’s - Capacity from 0.05 to 0.1 | |||
| 890 | 69.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 891 | 69.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 892 | 69.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 893 | 69.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 894 | 69.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 895 | 70 | HE’s and ATU’s - Capacity from 0.1 to 0.3 | |||
| 896 | 70.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 897 | 70.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 898 | 70.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 899 | 70.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 900 | 70.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 901 | 71 | HE’s and ATU’s - Capacity from 0.3 to 0.5 | |||
| 902 | 71.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 903 | 71.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 904 | 71.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 905 | 71.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 906 | 71.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 907 | 72 | HE’s and ATU’s - Capacity from 0.5 and above | |||
| 908 | 72.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 909 | 72.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 910 | 72.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 911 | 72.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 912 | 72.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 913 | 73 | Condenser/Chillers - Capacity up to 0.025 | |||
| 914 | 73.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 915 | 73.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 916 | 73.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 917 | 73.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 918 | 73.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 919 | 74 | Condenser/Chillers - Capacity from 0.025 to 0.05 | |||
| 920 | 74.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 921 | 74.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 922 | 74.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 923 | 74.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 924 | 74.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 925 | 75 | Condenser/Chillers - Capacity from 0.05 to 0.1 | |||
| 926 | 75.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 927 | 75.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 928 | 75.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 929 | 75.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 930 | 75.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 931 | 76 | Condenser/Chillers - Capacity from 0.1 to 0.3 | |||
| 932 | 76.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 933 | 76.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 934 | 76.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 935 | 76.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 936 | 76.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 937 | 77 | Condenser/Chillers - Capacity from 0.3 to 0.5 | |||
| 938 | 77.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 939 | 77.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 940 | 77.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 941 | 77.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 942 | 77.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 943 | 78 | Condenser/Chillers - Capacity from 0.5 and Above | |||
| 944 | 78.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 945 | 78.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 946 | 78.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 947 | 78.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 948 | 78.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 949 | 79 | Coolers - Capacity from up to 0.025 | |||
| 950 | 79.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 951 | 79.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 952 | 79.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 953 | 79.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 954 | 79.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 955 | 80 | Coolers - Capacity from 0.025 to 0.05 | |||
| 956 | 80.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 957 | 80.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 958 | 80.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 959 | 80.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 960 | 80.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 961 | 81 | Coolers - Capacity from 0.05 to 0.1 | |||
| 962 | 81.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 963 | 81.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 964 | 81.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 965 | 81.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 966 | 81.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 967 | 82 | Coolers - Capacity from 0.1 to 0.3 | |||
| 968 | 82.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 969 | 82.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 970 | 82.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 971 | 82.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 972 | 82.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 973 | 83 | Coolers - Capacity from 0.3 to 0.5 | |||
| 974 | 83.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 975 | 83.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 976 | 83.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 977 | 83.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 978 | 83.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 979 | 84 | Coolers - Capacity from 0.5 and Above | |||
| 980 | 84.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 981 | 84.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 982 | 84.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 983 | 84.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 984 | 84.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 985 | 85 | Manufacturing & Fitment of zinc protector with adaptor - Capacity from 0.3 to 0.5 | |||
| 986 | 85.01 | HEs and ATUs | 1 | No.s | |
| 987 | 85.02 | AC Condenser and Chillers | 1 | No.s | |
| 988 | 86 | Manufacturing & Fitment of zinc protector with adaptor - Capacity from 0.5 and Above | |||
| 989 | 86.01 | HEs and ATUs | 1 | No.s | |
| 990 | 86.02 | AC Condenser and Chillers | 1 | No.s | |
| 991 | 87 | Third Year | |||
| 992 | 88 | Services | |||
| 993 | 89 | HE and ATU - Capacity up to 0.025 | |||
| 994 | 89.01 | Removal of ATU/HE including de-lagging, disconnecting associated pipelines | 1 | No.s | |
| 995 | 89.02 | Mechanical Cleaning - Air Side | 1 | No.s | |
| 996 | 89.03 | Chemical Cleaning - Air Side (chemical provided by firm) | 1 | No.s | |
| 997 | 89.04 | Chemical Cleaning - Water Side (chemical provided by firm) | 1 | No.s | |
| 998 | 89.05 | Pressure Testing | 1 | No.s | |
| 999 | 89.06 | Fitment of ATU/HE including associated system pipelines and proving of system onboard | 1 | No.s | |
| 1000 | 89.07 | Drilling and Tapping | 48 | No.s | |
| 1001 | 89.08 | Manufacturing of Flange | 24 | No.s | |
| 1002 | 89.09 | Repair by Welding and Brazing of ATU/HE end cover | 48 | No.s | |
| 1003 | 89.1 | Plugging of tube including manufacturing of Plug (provided by firm) | 48 | No.s | |
| 1004 | 89.11 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 96 | No.s | |
| 1005 | 89.12 | Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning | 48 | No.s | |
| 1006 | 89.13 | INSITU mechanical cleaning - Air Side | 48 | No.s | |
| 1007 | 89.14 | INSITU chemical cleaning - Air Side (provided by firm) | 96 | No.s | |
| 1008 | 89.15 | INSITU chemical cleaning - Water | 48 | No.s | |
| 1009 | 89.16 | Fitment of ATU/HE including associated system onboard | 48 | No.s | |
| 1010 | 89.17 | Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm) | 96 | No.s | |
| 1011 | 89.18 | Transportation from Ship to FMU site and back | 16 | No.s | |
| 1012 | 89.19 | Neutralizing of ATU/HE after chemical cleaning | 20 | No.s | |
| 1013 | 89.2 | Blanking of system pipeline | 20 | No.s | |
| 1014 | 90 | HE and ATU - Capacity from 0.025 to 0.05 | |||
| 1015 | 90.01 | Removal of ATU/HE including de-lagging, disconnecting associated pipelines | 1 | No.s | |
| 1016 | 90.02 | Mechanical Cleaning - Air Side | 1 | No.s | |
| 1017 | 90.03 | Chemical Cleaning - Air Side (chemical provided by firm) | 1 | No.s | |
| 1018 | 90.04 | Chemical Cleaning - Water Side (chemical provided by firm) | 1 | No.s | |
| 1019 | 90.05 | Pressure Testing | 1 | No.s | |
| 1020 | 90.06 | Fitment of ATU/HE including associated system pipelines and proving of system onboard | 1 | No.s | |
| 1021 | 90.07 | Drilling and Tapping | 48 | No.s | |
| 1022 | 90.08 | Manufacturing of Flange | 24 | No.s | |
| 1023 | 90.09 | Repair by Welding and Brazing of ATU/HE end cover | 48 | No.s | |
| 1024 | 90.1 | Plugging of tube including manufacturing of Plug (provided by firm) | 48 | No.s | |
| 1025 | 90.11 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 96 | No.s | |
| 1026 | 90.12 | Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning | 48 | No.s | |
| 1027 | 90.13 | INSITU mechanical cleaning - Air Side | 48 | No.s | |
| 1028 | 90.14 | INSITU chemical cleaning - Air Side (provided by firm) | 96 | No.s | |
| 1029 | 90.15 | INSITU chemical cleaning - Water | 48 | No.s | |
| 1030 | 90.16 | Fitment of ATU/HE including associated system onboard | 48 | No.s | |
| 1031 | 90.17 | Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm) | 96 | No.s | |
| 1032 | 90.18 | Transportation from Ship to FMU site and back | 16 | No.s | |
| 1033 | 90.19 | Neutralizing of ATU/HE after chemical cleaning | 20 | No.s | |
| 1034 | 90.2 | Blanking of system pipeline | 20 | No.s | |
| 1035 | 91 | HE and ATU - Capacity from 0.5 and Above | |||
| 1036 | 91.01 | Removal of ATU/HE including de-lagging, disconnecting associated pipelines | 1 | No.s | |
| 1037 | 91.02 | Mechanical Cleaning - Air Side | 1 | No.s | |
| 1038 | 91.03 | Chemical Cleaning - Air Side (chemical provided by firm) | 1 | No.s | |
| 1039 | 91.04 | Chemical Cleaning - Water Side (chemical provided by firm) | 1 | No.s | |
| 1040 | 91.05 | Pressure Testing | 1 | No.s | |
| 1041 | 91.06 | Fitment of ATU/HE including associated system pipelines and proving of system onboard | 1 | No.s | |
| 1042 | 91.07 | Drilling and Tapping | 48 | No.s | |
| 1043 | 91.08 | Manufacturing of Flange | 24 | No.s | |
| 1044 | 91.09 | Repair by Welding and Brazing of ATU/HE end cover | 48 | No.s | |
| 1045 | 91.1 | Plugging of tube including manufacturing of Plug (provided by firm) | 48 | No.s | |
| 1046 | 91.11 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 96 | No.s | |
| 1047 | 91.12 | Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning | 48 | No.s | |
| 1048 | 91.13 | INSITU mechanical cleaning - Air Side | 48 | No.s | |
| 1049 | 91.14 | INSITU chemical cleaning - Air Side (provided by firm) | 96 | No.s | |
| 1050 | 91.15 | INSITU chemical cleaning - Water | 48 | No.s | |
| 1051 | 91.16 | Fitment of ATU/HE including associated system onboard | 48 | No.s | |
| 1052 | 91.17 | Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm) | 96 | No.s | |
| 1053 | 91.18 | Transportation from Ship to FMU site and back | 16 | No.s | |
| 1054 | 91.19 | Neutralizing of ATU/HE after chemical cleaning | 20 | No.s | |
| 1055 | 91.2 | Blanking of system pipeline | 20 | No.s | |
| 1056 | 92 | HE and ATU - Capacity from 0.1 to 0.3 | |||
| 1057 | 92.01 | Removal of ATU/HE including de-lagging, disconnecting associated pipelines | 1 | No.s | |
| 1058 | 92.02 | Mechanical Cleaning - Air Side | 1 | No.s | |
| 1059 | 92.03 | Chemical Cleaning - Air Side (chemical provided by firm) | 1 | No.s | |
| 1060 | 92.04 | Chemical Cleaning - Water Side (chemical provided by firm) | 1 | No.s | |
| 1061 | 92.05 | Pressure Testing | 1 | No.s | |
| 1062 | 92.06 | Fitment of ATU/HE including associated system pipelines and proving of system onboard | 1 | No.s | |
| 1063 | 92.07 | Drilling and Tapping | 48 | No.s | |
| 1064 | 92.08 | Manufacturing of Flange | 24 | No.s | |
| 1065 | 92.09 | Repair by Welding and Brazing of ATU/HE end cover | 48 | No.s | |
| 1066 | 92.1 | Plugging of tube including manufacturing of Plug (provided by firm) | 48 | No.s | |
| 1067 | 92.11 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 96 | No.s | |
| 1068 | 92.12 | Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning | 48 | No.s | |
| 1069 | 92.13 | INSITU mechanical cleaning - Air Side | 48 | No.s | |
| 1070 | 92.14 | INSITU chemical cleaning - Air Side (provided by firm) | 96 | No.s | |
| 1071 | 92.15 | INSITU chemical cleaning - Water | 48 | No.s | |
| 1072 | 92.16 | Fitment of ATU/HE including associated system onboard | 48 | No.s | |
| 1073 | 92.17 | Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm) | 96 | No.s | |
| 1074 | 92.18 | Transportation from Ship to FMU site and back | 16 | No.s | |
| 1075 | 92.19 | Neutralizing of ATU/HE after chemical cleaning | 20 | No.s | |
| 1076 | 92.2 | Blanking of system pipeline | 20 | No.s | |
| 1077 | 93 | HE and ATU - Capacity from 0.3 to 0.5 | |||
| 1078 | 93.01 | Removal of ATU/HE including de-lagging, disconnecting associated pipelines | 1 | No.s | |
| 1079 | 93.02 | Mechanical Cleaning - Air Side | 1 | No.s | |
| 1080 | 93.03 | Chemical Cleaning - Air Side (chemical provided by firm) | 1 | No.s | |
| 1081 | 93.04 | Chemical Cleaning - Water Side (chemical provided by firm) | 1 | No.s | |
| 1082 | 93.05 | Pressure Testing | 1 | No.s | |
| 1083 | 93.06 | Fitment of ATU/HE including associated system pipelines and proving of system onboard | 1 | No.s | |
| 1084 | 93.07 | Drilling and Tapping | 48 | No.s | |
| 1085 | 93.08 | Manufacturing of Flange | 24 | No.s | |
| 1086 | 93.09 | Repair by Welding and Brazing of ATU/HE end cover | 48 | No.s | |
| 1087 | 93.1 | Plugging of tube including manufacturing of Plug (provided by firm) | 48 | No.s | |
| 1088 | 93.11 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 96 | No.s | |
| 1089 | 93.12 | Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning | 48 | No.s | |
| 1090 | 93.13 | INSITU mechanical cleaning - Air Side | 48 | No.s | |
| 1091 | 93.14 | INSITU chemical cleaning - Air Side (provided by firm) | 96 | No.s | |
| 1092 | 93.15 | INSITU chemical cleaning - Water | 48 | No.s | |
| 1093 | 93.16 | Fitment of ATU/HE including associated system onboard | 48 | No.s | |
| 1094 | 93.17 | Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm) | 96 | No.s | |
| 1095 | 93.18 | Transportation from Ship to FMU site and back | 16 | No.s | |
| 1096 | 93.19 | Neutralizing of ATU/HE after chemical cleaning | 20 | No.s | |
| 1097 | 93.2 | Blanking of system pipeline | 20 | No.s | |
| 1098 | 94 | HE and ATU - Capacity from 0.5 and Above | |||
| 1099 | 94.01 | Removal of ATU/HE including de-lagging, disconnecting associated pipelines | 1 | No.s | |
| 1100 | 94.02 | Mechanical Cleaning - Air Side | 1 | No.s | |
| 1101 | 94.03 | Chemical Cleaning - Air Side (chemical provided by firm) | 1 | No.s | |
| 1102 | 94.04 | Chemical Cleaning - Water Side (chemical provided by firm) | 1 | No.s | |
| 1103 | 94.05 | Pressure Testing | 1 | No.s | |
| 1104 | 94.06 | Fitment of ATU/HE including associated system pipelines and proving of system onboard | 1 | No.s | |
| 1105 | 94.07 | Drilling and Tapping | 48 | No.s | |
| 1106 | 94.08 | Manufacturing of Flange | 24 | No.s | |
| 1107 | 94.09 | Repair by Welding and Brazing of ATU/HE end cover | 48 | No.s | |
| 1108 | 94.1 | Plugging of tube including manufacturing of Plug (provided by firm) | 48 | No.s | |
| 1109 | 94.11 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 96 | No.s | |
| 1110 | 94.12 | Removal of ATU/HE associated system pipeline including de-lagging for INSITU cleaning | 48 | No.s | |
| 1111 | 94.13 | INSITU mechanical cleaning - Air Side | 48 | No.s | |
| 1112 | 94.14 | INSITU chemical cleaning - Air Side (provided by firm) | 96 | No.s | |
| 1113 | 94.15 | INSITU chemical cleaning - Water | 48 | No.s | |
| 1114 | 94.16 | Fitment of ATU/HE including associated system onboard | 48 | No.s | |
| 1115 | 94.17 | Painting of ATU/HE (with Red Oxide and Enamel Paint) (provided by firm) | 96 | No.s | |
| 1116 | 94.18 | Transportation from Ship to FMU site and back | 16 | No.s | |
| 1117 | 94.19 | Neutralizing of ATU/HE after chemical cleaning | 20 | No.s | |
| 1118 | 94.2 | Blanking of system pipeline | 20 | No.s | |
| 1119 | 95 | Condenser/Chillers - Capacity up to 0.025 | |||
| 1120 | 95.01 | Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers) | 1 | No.s | |
| 1121 | 95.02 | Mechanical Cleaning - Water Side | 1 | No.s | |
| 1122 | 95.03 | Chemical Cleaning - Water Side (provided by firm) | 1 | No.s | |
| 1123 | 95.04 | Mechanical Cleaning - Gas Side | 1 | No.s | |
| 1124 | 95.05 | Fitment of condenser end cover including associated chillers pipeline and proving the system onboard | 1 | No.s | |
| 1125 | 95.06 | Drilling and Tapping | 96 | No.s | |
| 1126 | 95.07 | Repair by welding and brazing of condenser end cover | 48 | No.s | |
| 1127 | 95.08 | Plugging of tube including manufacturing of plug (provided by firm) | 24 | No.s | |
| 1128 | 95.09 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 48 | No.s | |
| 1129 | 95.1 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 1130 | 95.11 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 1131 | 96 | Condenser/Chillers - Capacity from 0.025 to 0.05 | |||
| 1132 | 96.01 | Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers) | 1 | No.s | |
| 1133 | 96.02 | Mechanical Cleaning - Water Side | 1 | No.s | |
| 1134 | 96.03 | Chemical Cleaning - Water Side (provided by firm) | 1 | No.s | |
| 1135 | 96.04 | Mechanical Cleaning - Gas Side | 1 | No.s | |
| 1136 | 96.05 | Fitment of condenser end cover including associated chillers pipeline and proving the system onboard | 1 | No.s | |
| 1137 | 96.06 | Drilling and Tapping | 96 | No.s | |
| 1138 | 96.07 | Repair by welding and brazing of condenser end cover | 48 | No.s | |
| 1139 | 96.08 | Plugging of tube including manufacturing of plug (provided by firm) | 24 | No.s | |
| 1140 | 96.09 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 48 | No.s | |
| 1141 | 96.1 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 1142 | 96.11 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 1143 | 97 | Condenser/Chillers - Capacity from 0.05 to 0.1 | |||
| 1144 | 97.01 | Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers) | 1 | No.s | |
| 1145 | 97.02 | Mechanical Cleaning - Water Side | 1 | No.s | |
| 1146 | 97.03 | Chemical Cleaning - Water Side (provided by firm) | 1 | No.s | |
| 1147 | 97.04 | Mechanical Cleaning - Gas Side | 1 | No.s | |
| 1148 | 97.05 | Fitment of condenser end cover including associated chillers pipeline and proving the system onboard | 1 | No.s | |
| 1149 | 97.06 | Drilling and Tapping | 96 | No.s | |
| 1150 | 97.07 | Repair by welding and brazing of condenser end cover | 48 | No.s | |
| 1151 | 97.08 | Plugging of tube including manufacturing of plug (provided by firm) | 24 | No.s | |
| 1152 | 97.09 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 48 | No.s | |
| 1153 | 97.1 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 1154 | 97.11 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 1155 | 98 | Condenser/Chillers - Capacity from 0.1 to 0.3 | |||
| 1156 | 98.01 | Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers) | 1 | No.s | |
| 1157 | 98.02 | Mechanical Cleaning - Water Side | 1 | No.s | |
| 1158 | 98.03 | Chemical Cleaning - Water Side (provided by firm) | 1 | No.s | |
| 1159 | 98.04 | Mechanical Cleaning - Gas Side | 1 | No.s | |
| 1160 | 98.05 | Fitment of condenser end cover including associated chillers pipeline and proving the system onboard | 1 | No.s | |
| 1161 | 98.06 | Drilling and Tapping | 96 | No.s | |
| 1162 | 98.07 | Repair by welding and brazing of condenser end cover | 48 | No.s | |
| 1163 | 98.08 | Plugging of tube including manufacturing of plug (provided by firm) | 24 | No.s | |
| 1164 | 98.09 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 48 | No.s | |
| 1165 | 98.1 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 1166 | 98.11 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 1167 | 99 | Condenser/Chillers - Capacity from 0.3 to 0.5 | |||
| 1168 | 99.01 | Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers) | 1 | No.s | |
| 1169 | 99.02 | Mechanical Cleaning - Water Side | 1 | No.s | |
| 1170 | 99.03 | Chemical Cleaning - Water Side (provided by firm) | 1 | No.s | |
| 1171 | 99.04 | Mechanical Cleaning - Gas Side | 1 | No.s | |
| 1172 | 99.05 | Fitment of condenser end cover including associated chillers pipeline and proving the system onboard | 1 | No.s | |
| 1173 | 99.06 | Drilling and Tapping | 96 | No.s | |
| 1174 | 99.07 | Repair by welding and brazing of condenser end cover | 48 | No.s | |
| 1175 | 99.08 | Plugging of tube including manufacturing of plug (provided by firm) | 24 | No.s | |
| 1176 | 99.09 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 48 | No.s | |
| 1177 | 99.1 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 1178 | 99.11 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 1179 | 100 | Condenser/Chillers - Capacity from 0.5 and Above | |||
| 1180 | 100.01 | Removal of end cover of Condenser / Chillers including de-lagging, disconnection of associated system pipelines (De-lagging applicable only on chillers) | 1 | No.s | |
| 1181 | 100.02 | Mechanical Cleaning - Water Side | 1 | No.s | |
| 1182 | 100.03 | Chemical Cleaning - Water Side (provided by firm) | 1 | No.s | |
| 1183 | 100.04 | Mechanical Cleaning - Gas Side | 1 | No.s | |
| 1184 | 100.05 | Fitment of condenser end cover including associated chillers pipeline and proving the system onboard | 1 | No.s | |
| 1185 | 100.06 | Drilling and Tapping | 96 | No.s | |
| 1186 | 100.07 | Repair by welding and brazing of condenser end cover | 48 | No.s | |
| 1187 | 100.08 | Plugging of tube including manufacturing of plug (provided by firm) | 24 | No.s | |
| 1188 | 100.09 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 48 | No.s | |
| 1189 | 100.1 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 1190 | 100.11 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 1191 | 101 | Coolers - Capacity up to 0.025 | |||
| 1192 | 101.01 | Removal of Cooler including associated system pipelines | 1 | No.s | |
| 1193 | 101.02 | F/W Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 1194 | 101.03 | F/W Cooler - Mechanical cleaning | 1 | No.s | |
| 1195 | 101.04 | Lub Oil Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 1196 | 101.05 | Radiator mechanical cleaning | 1 | No.s | |
| 1197 | 101.06 | Radiator chemical cleaning (provided by firm) | 1 | No.s | |
| 1198 | 101.07 | CPP Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 1199 | 101.08 | General Cooler - Mechanical cleaning | 24 | No.s | |
| 1200 | 101.09 | Generator Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 1201 | 101.1 | Hydraulic Cooler - Chemical cleaning (provided by firm) | 96 | No.s | |
| 1202 | 101.11 | Gear Box Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 1203 | 101.12 | Air Compressor / Cooling Coil chemical cleaning (provided by firm) | 24 | No.s | |
| 1204 | 101.13 | Fitment of cooler including associated chillers pipeline and proving the system onboard | 48 | No.s | |
| 1205 | 101.14 | Drilling and Tapping | 1 | No.s | |
| 1206 | 101.15 | Plugging of tube including manufacturing of plug (provided by firm) | 1 | No.s | |
| 1207 | 101.16 | Repair by welding and brazing of condenser end cover | 1 | No.s | |
| 1208 | 101.17 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 1 | No.s | |
| 1209 | 101.18 | Removal of associated system pipeline for INSITU cleaning of fresh water Cooler | 1 | No.s | |
| 1210 | 101.19 | Chemical cleaning of cooler (provided by firm) | 24 | No.s | |
| 1211 | 101.2 | Mechanical cleaning of cooler | 48 | No.s | |
| 1212 | 101.21 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 1213 | 101.22 | Chemical cleaning of cooler (provided by firm) | 48 | No.s | |
| 1214 | 101.23 | Mechanical cleaning of cooler | 24 | No.s | |
| 1215 | 101.24 | Pressure testing of cooler INSITU | 48 | No.s | |
| 1216 | 101.25 | Pressure testing of cooler at shop floor | 48 | No.s | |
| 1217 | 101.26 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 1218 | 101.27 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 1219 | 101.28 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 1220 | 102 | Coolers - Capacity from 0.025 to 0.05 | |||
| 1221 | 102.01 | Removal of Cooler including associated system pipelines | 1 | No.s | |
| 1222 | 102.02 | F/W Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 1223 | 102.03 | F/W Cooler - Mechanical cleaning | 1 | No.s | |
| 1224 | 102.04 | Lub Oil Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 1225 | 102.05 | Radiator mechanical cleaning | 1 | No.s | |
| 1226 | 102.06 | Radiator chemical cleaning (provided by firm) | 1 | No.s | |
| 1227 | 102.07 | CPP Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 1228 | 102.08 | General Cooler - Mechanical cleaning | 24 | No.s | |
| 1229 | 102.09 | Generator Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 1230 | 102.1 | Hydraulic Cooler - Chemical cleaning (provided by firm) | 96 | No.s | |
| 1231 | 102.11 | Gear Box Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 1232 | 102.12 | Air Compressor / Cooling Coil chemical cleaning (provided by firm) | 24 | No.s | |
| 1233 | 102.13 | Fitment of cooler including associated chillers pipeline and proving the system onboard | 48 | No.s | |
| 1234 | 102.14 | Drilling and Tapping | 1 | No.s | |
| 1235 | 102.15 | Plugging of tube including manufacturing of plug (provided by firm) | 1 | No.s | |
| 1236 | 102.16 | Repair by welding and brazing of condenser end cover | 1 | No.s | |
| 1237 | 102.17 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 1 | No.s | |
| 1238 | 102.18 | Removal of associated system pipeline for INSITU cleaning of fresh water Cooler | 1 | No.s | |
| 1239 | 102.19 | Chemical cleaning of cooler (provided by firm) | 24 | No.s | |
| 1240 | 102.2 | Mechanical cleaning of cooler | 48 | No.s | |
| 1241 | 102.21 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 1242 | 102.22 | Chemical cleaning of cooler (provided by firm) | 48 | No.s | |
| 1243 | 102.23 | Mechanical cleaning of cooler | 24 | No.s | |
| 1244 | 102.24 | Pressure testing of cooler INSITU | 48 | No.s | |
| 1245 | 102.25 | Pressure testing of cooler at shop floor | 48 | No.s | |
| 1246 | 102.26 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 1247 | 102.27 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 1248 | 102.28 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 1249 | 103 | Coolers - Capacity from 0.05 to 0.1 | |||
| 1250 | 103.01 | Removal of Cooler including associated system pipelines | 1 | No.s | |
| 1251 | 103.02 | F/W Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 1252 | 103.03 | F/W Cooler - Mechanical cleaning | 1 | No.s | |
| 1253 | 103.04 | Lub Oil Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 1254 | 103.05 | Radiator mechanical cleaning | 1 | No.s | |
| 1255 | 103.06 | Radiator chemical cleaning (provided by firm) | 1 | No.s | |
| 1256 | 103.07 | CPP Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 1257 | 103.08 | General Cooler - Mechanical cleaning | 24 | No.s | |
| 1258 | 103.09 | Generator Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 1259 | 103.1 | Hydraulic Cooler - Chemical cleaning (provided by firm) | 96 | No.s | |
| 1260 | 103.11 | Gear Box Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 1261 | 103.12 | Air Compressor / Cooling Coil chemical cleaning (provided by firm) | 24 | No.s | |
| 1262 | 103.13 | Fitment of cooler including associated chillers pipeline and proving the system onboard | 48 | No.s | |
| 1263 | 103.14 | Drilling and Tapping | 1 | No.s | |
| 1264 | 103.15 | Plugging of tube including manufacturing of plug (provided by firm) | 1 | No.s | |
| 1265 | 103.16 | Repair by welding and brazing of condenser end cover | 1 | No.s | |
| 1266 | 103.17 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 1 | No.s | |
| 1267 | 103.18 | Removal of associated system pipeline for INSITU cleaning of fresh water Cooler | 1 | No.s | |
| 1268 | 103.19 | Chemical cleaning of cooler (provided by firm) | 24 | No.s | |
| 1269 | 103.2 | Mechanical cleaning of cooler | 48 | No.s | |
| 1270 | 103.21 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 1271 | 103.22 | Chemical cleaning of cooler (provided by firm) | 48 | No.s | |
| 1272 | 103.23 | Mechanical cleaning of cooler | 24 | No.s | |
| 1273 | 103.24 | Pressure testing of cooler INSITU | 48 | No.s | |
| 1274 | 103.25 | Pressure testing of cooler at shop floor | 48 | No.s | |
| 1275 | 103.26 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 1276 | 103.27 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 1277 | 103.28 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 1278 | 104 | Coolers - Capacity from 0.1 to 0.3 | |||
| 1279 | 104.01 | Removal of Cooler including associated system pipelines | 1 | No.s | |
| 1280 | 104.02 | F/W Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 1281 | 104.03 | F/W Cooler - Mechanical cleaning | 1 | No.s | |
| 1282 | 104.04 | Lub Oil Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 1283 | 104.05 | Radiator mechanical cleaning | 1 | No.s | |
| 1284 | 104.06 | Radiator chemical cleaning (provided by firm) | 1 | No.s | |
| 1285 | 104.07 | CPP Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 1286 | 104.08 | General Cooler - Mechanical cleaning | 24 | No.s | |
| 1287 | 104.09 | Generator Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 1288 | 104.1 | Hydraulic Cooler - Chemical cleaning (provided by firm) | 96 | No.s | |
| 1289 | 104.11 | Gear Box Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 1290 | 104.12 | Air Compressor / Cooling Coil chemical cleaning (provided by firm) | 24 | No.s | |
| 1291 | 104.13 | Fitment of cooler including associated chillers pipeline and proving the system onboard | 48 | No.s | |
| 1292 | 104.14 | Drilling and Tapping | 1 | No.s | |
| 1293 | 104.15 | Plugging of tube including manufacturing of plug (provided by firm) | 1 | No.s | |
| 1294 | 104.16 | Repair by welding and brazing of condenser end cover | 1 | No.s | |
| 1295 | 104.17 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 1 | No.s | |
| 1296 | 104.18 | Removal of associated system pipeline for INSITU cleaning of fresh water Cooler | 1 | No.s | |
| 1297 | 104.19 | Chemical cleaning of cooler (provided by firm) | 24 | No.s | |
| 1298 | 104.2 | Mechanical cleaning of cooler | 48 | No.s | |
| 1299 | 104.21 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 1300 | 104.22 | Chemical cleaning of cooler (provided by firm) | 48 | No.s | |
| 1301 | 104.23 | Mechanical cleaning of cooler | 24 | No.s | |
| 1302 | 104.24 | Pressure testing of cooler INSITU | 48 | No.s | |
| 1303 | 104.25 | Pressure testing of cooler at shop floor | 48 | No.s | |
| 1304 | 104.26 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 1305 | 104.27 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 1306 | 104.28 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 1307 | 105 | Coolers - Capacity from 0.3 to 0.5 | |||
| 1308 | 105.01 | Removal of Cooler including associated system pipelines | 1 | No.s | |
| 1309 | 105.02 | F/W Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 1310 | 105.03 | F/W Cooler - Mechanical cleaning | 1 | No.s | |
| 1311 | 105.04 | Lub Oil Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 1312 | 105.05 | Radiator mechanical cleaning | 1 | No.s | |
| 1313 | 105.06 | Radiator chemical cleaning (provided by firm) | 1 | No.s | |
| 1314 | 105.07 | CPP Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 1315 | 105.08 | General Cooler - Mechanical cleaning | 24 | No.s | |
| 1316 | 105.09 | Generator Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 1317 | 105.1 | Hydraulic Cooler - Chemical cleaning (provided by firm) | 96 | No.s | |
| 1318 | 105.11 | Gear Box Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 1319 | 105.12 | Air Compressor / Cooling Coil chemical cleaning (provided by firm) | 24 | No.s | |
| 1320 | 105.13 | Fitment of cooler including associated chillers pipeline and proving the system onboard | 48 | No.s | |
| 1321 | 105.14 | Drilling and Tapping | 1 | No.s | |
| 1322 | 105.15 | Plugging of tube including manufacturing of plug (provided by firm) | 1 | No.s | |
| 1323 | 105.16 | Repair by welding and brazing of condenser end cover | 1 | No.s | |
| 1324 | 105.17 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 1 | No.s | |
| 1325 | 105.18 | Removal of associated system pipeline for INSITU cleaning of fresh water Cooler | 1 | No.s | |
| 1326 | 105.19 | Chemical cleaning of cooler (provided by firm) | 24 | No.s | |
| 1327 | 105.2 | Mechanical cleaning of cooler | 48 | No.s | |
| 1328 | 105.21 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 1329 | 105.22 | Chemical cleaning of cooler (provided by firm) | 48 | No.s | |
| 1330 | 105.23 | Mechanical cleaning of cooler | 24 | No.s | |
| 1331 | 105.24 | Pressure testing of cooler INSITU | 48 | No.s | |
| 1332 | 105.25 | Pressure testing of cooler at shop floor | 48 | No.s | |
| 1333 | 105.26 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 1334 | 105.27 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 1335 | 105.28 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 1336 | 106 | Coolers - Capacity from 0.5 and Above | |||
| 1337 | 106.01 | Removal of Cooler including associated system pipelines | 1 | No.s | |
| 1338 | 106.02 | F/W Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 1339 | 106.03 | F/W Cooler - Mechanical cleaning | 1 | No.s | |
| 1340 | 106.04 | Lub Oil Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 1341 | 106.05 | Radiator mechanical cleaning | 1 | No.s | |
| 1342 | 106.06 | Radiator chemical cleaning (provided by firm) | 1 | No.s | |
| 1343 | 106.07 | CPP Cooler - Chemical cleaning (provided by firm) | 1 | No.s | |
| 1344 | 106.08 | General Cooler - Mechanical cleaning | 24 | No.s | |
| 1345 | 106.09 | Generator Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 1346 | 106.1 | Hydraulic Cooler - Chemical cleaning (provided by firm) | 96 | No.s | |
| 1347 | 106.11 | Gear Box Cooler - Chemical cleaning (provided by firm) | 48 | No.s | |
| 1348 | 106.12 | Air Compressor / Cooling Coil chemical cleaning (provided by firm) | 24 | No.s | |
| 1349 | 106.13 | Fitment of cooler including associated chillers pipeline and proving the system onboard | 48 | No.s | |
| 1350 | 106.14 | Drilling and Tapping | 1 | No.s | |
| 1351 | 106.15 | Plugging of tube including manufacturing of plug (provided by firm) | 1 | No.s | |
| 1352 | 106.16 | Repair by welding and brazing of condenser end cover | 1 | No.s | |
| 1353 | 106.17 | Cold repair by putty (DEVCON / BELZONA) (provided by firm) | 1 | No.s | |
| 1354 | 106.18 | Removal of associated system pipeline for INSITU cleaning of fresh water Cooler | 1 | No.s | |
| 1355 | 106.19 | Chemical cleaning of cooler (provided by firm) | 24 | No.s | |
| 1356 | 106.2 | Mechanical cleaning of cooler | 48 | No.s | |
| 1357 | 106.21 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 1358 | 106.22 | Chemical cleaning of cooler (provided by firm) | 48 | No.s | |
| 1359 | 106.23 | Mechanical cleaning of cooler | 24 | No.s | |
| 1360 | 106.24 | Pressure testing of cooler INSITU | 48 | No.s | |
| 1361 | 106.25 | Pressure testing of cooler at shop floor | 48 | No.s | |
| 1362 | 106.26 | Removal of associated system pipeline for INSITU cleaning of Lub Oil cooler | 96 | No.s | |
| 1363 | 106.27 | Painting of ATU/HE (with red oxide and enamel paints) (provided by firm) | 48 | No.s | |
| 1364 | 106.28 | Transportation from Ship to FMU site and back | 96 | No.s | |
| 1365 | 107 | Manufacturing & Fitment of zinc protector with adaptor - Capacity from 0.3 to 0.5 | |||
| 1366 | 107.01 | HEs and ATUs | 1 | No.s | |
| 1367 | 107.02 | AC Condenser and Chillers | 1 | No.s | |
| 1368 | 108 | Manufacturing & Fitment of zinc protector with adaptor Capacity from 0.5 and Above | |||
| 1369 | 108.01 | HEs and ATUs | 1 | No.s | |
| 1370 | 108.02 | AC Condenser and Chillers | 1 | No.s | |
| 1371 | 109 | Spares | |||
| 1372 | 110 | HE’s and ATU’s - Capacity up to 0.025 | |||
| 1373 | 110.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 1374 | 110.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 1375 | 110.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 1376 | 110.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 1377 | 110.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 1378 | 111 | HE’s and ATU’s - Capacity from 0.025 to 0.05 | |||
| 1379 | 111.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 1380 | 111.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 1381 | 111.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 1382 | 111.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 1383 | 111.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 1384 | 112 | HE’s and ATU’s - Capacity from 0.05 to 0.1 | |||
| 1385 | 112.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 1386 | 112.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 1387 | 112.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 1388 | 112.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 1389 | 112.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 1390 | 113 | HE’s and ATU’s - Capacity from 0.1 to 0.3 | |||
| 1391 | 113.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 1392 | 113.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 1393 | 113.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 1394 | 113.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 1395 | 113.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 1396 | 114 | HE’s and ATU’s - Capacity from 0.3 to 0.5 | |||
| 1397 | 114.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 1398 | 114.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 1399 | 114.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 1400 | 114.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 1401 | 114.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 1402 | 115 | HE’s and ATU’s - Capacity from 0.5 and above | |||
| 1403 | 115.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 1404 | 115.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 1405 | 115.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 1406 | 115.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 1407 | 115.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 1408 | 116 | Condenser/Chillers - Capacity up to 0.025 | |||
| 1409 | 116.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 1410 | 116.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 1411 | 116.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 1412 | 116.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 1413 | 116.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 1414 | 117 | Condenser/Chillers - Capacity from 0.025 to 0.05 | |||
| 1415 | 117.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 1416 | 117.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 1417 | 117.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 1418 | 117.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 1419 | 117.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 1420 | 118 | Condenser/Chillers - Capacity from 0.05 to 0.1 | |||
| 1421 | 118.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 1422 | 118.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 1423 | 118.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 1424 | 118.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 1425 | 118.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 1426 | 119 | Condenser/Chillers - Capacity from 0.1 to 0.3 | |||
| 1427 | 119.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 1428 | 119.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 1429 | 119.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 1430 | 119.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 1431 | 119.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 1432 | 120 | Condenser/Chillers - Capacity from 0.3 to 0.5 | |||
| 1433 | 120.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 1434 | 120.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 1435 | 120.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 1436 | 120.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 1437 | 120.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 1438 | 121 | Condenser/Chillers - Capacity from 0.5 and Above | |||
| 1439 | 121.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 1440 | 121.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 1441 | 121.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 1442 | 121.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 1443 | 121.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 1444 | 122 | Coolers - Capacity from up to 0.025 | |||
| 1445 | 122.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 1446 | 122.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 1447 | 122.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 1448 | 122.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 1449 | 122.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 1450 | 123 | Coolers - Capacity from 0.025 to 0.05 | |||
| 1451 | 123.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 1452 | 123.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 1453 | 123.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 1454 | 123.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 1455 | 123.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 1456 | 124 | Coolers - Capacity from 0.05 to 0.1 | |||
| 1457 | 124.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 1458 | 124.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 1459 | 124.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 1460 | 124.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 1461 | 124.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 1462 | 125 | Coolers - Capacity from 0.1 to 0.3 | |||
| 1463 | 125.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 1464 | 125.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 1465 | 125.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 1466 | 125.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 1467 | 125.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 1468 | 126 | Coolers - Capacity from 0.3 to 0.5 | |||
| 1469 | 126.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 1470 | 126.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 1471 | 126.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 1472 | 126.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 1473 | 126.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 1474 | 127 | Coolers - Capacity from 0.5 and Above | |||
| 1475 | 127.01 | Renewal of Joint/Gasket (provided by firm) | 1 | No.s | |
| 1476 | 127.02 | Renewal of Fasteners as required (Brass) (provided by firm) | 1 | No.s | |
| 1477 | 127.03 | Renewal of Fasteners as required (SS) (provided by firm) | 1 | No.s | |
| 1478 | 127.04 | Renewal of Fastener as required (MS) (provided by firm) | 1 | No.s | |
| 1479 | 127.05 | Cold repair by putty (DEVCON/BELZONA) (provided by firm) | 1 | No.s | |
| 1480 | 128 | Manufacturing & Fitment of zinc protector with adaptor - Capacity from 0.3 to 0.5 | |||
| 1481 | 128.01 | HEs and ATUs | 1 | No.s | |
| 1482 | 128.02 | AC Condenser and Chillers | 1 | No.s | |
| 1483 | 129 | Manufacturing & Fitment of zinc protector with adaptor - Capacity from 0.5 and Above | |||
| 1484 | 129.01 | HEs and ATUs | 1 | No.s | |
| 1485 | 129.02 | AC Condenser and Chillers | 1 | No.s |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail