| 1 | 1 | Dewatering done by 7.5 H.P. Pump set including all lab., mat., &T&P and also including fuel charges etc all complete. | BI01010001010000000000000515BI0100001113 | 40 | Cum |
|---|
| 2 | 2 | Desalting of under liquid mud and foul position including etc all complete. (A). 0.00 TO 1.50 Mts. Lift | BI01010001010000000000000515BI0100001114 | 42.2 | Cum |
|---|
| 3 | 3 | 1.50 Mt. To 3.00 Mts. Lift | BI01010001010000000000000515BI0100001115 | 42.2 | Cum |
|---|
| 4 | 4 | 3.00 Mt. To 4.50 Mts. Lift | BI01010001010000000000000515BI0100001116 | 42.2 | Cum |
|---|
| 5 | 5 | 4.50 Mt. To 6.00 Mts. Lift | BI01010001010000000000000515BI0100001117 | 42.2 | Cum |
|---|
| 6 | 6 | 6.00 Mt. To 7.50 Mts. Lift | BI01010001010000000000000515BI0100001118 | 42.19 | Cum |
|---|
| 7 | 7 | 7.50 Mt. To 9.00 Mts. Lift | BI01010001010000000000000515BI0100001119 | 42.19 | Cum |
|---|
| 8 | 8 | Excavation in foundation in soil mixed with moorum,kankar including 1.5m lift and 30m lead (S.I.NO. -252)(A/R) | BI01010001010000000000000515BI0100001120 | 15 | Cum |
|---|
| 9 | 9 | Providing & laying of C.C. with 20-40mm gauge stone ballast ,coarse sand ,cement in the proportion of 8:4:1 including supply of all materials,labour and T&P etc required for proper completion of the work all complete (S.I. No. 281). | BI01010001010000000000000515BI0100001121 | 3 | Cum |
|---|
| 10 | 10 | 1st class Brick Work in 1:4 Cement & Sand mortar in foundation and plinth including supply of all mat. Lab. And T&P etc. all complete (S.I. No. 305). | BI01010001010000000000000515BI0100001122 | 5.5 | Cum |
|---|
| 11 | 11 | Providing & laying of C.C. with 20mm gauge stone ballast ,coarse sand ,cement in the proportion of 4:2:1 including supply of all materials, labour and T&P etc required for proper completion of the work all complete (S.I. No. 279(a)) | BI01010001010000000000000515BI0100001123 | 8.2 | Cum |
|---|
| 12 | 12 | 15mm thick Plaster in 1:4 Cement sand mortar including all lab., mat., & T&P etc all complete. | BI01010001010000000000000515BI0100001124 | 140 | Sqm |
|---|
| 13 | 13 | 12mm thick plaster in 1:4 Cement & Sand mortar including lab.& T&P etc all complete ( S.I. No. 584). | BI01010001010000000000000515BI0100001125 | 14 | Sqm |
|---|
| 14 | 14 | Supply & fixing of M.S. Pulley with including all lab., mat., & T&P etc all complete. | BI01010001010000000000000515BI0100001126 | 2 | Nos |
|---|
| 15 | 15 | Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all materials. Labour and T&P etc all complete. (S.I.No.660) | BI01010001010000000000000515BI0100001127 | 126 | Sqm |
|---|
| 16 | 16 | Extra Labour for Scaffolding for shifting of Mat., un Lowering the wall for warking etc all complete. | BI01010001010000000000000515BI0100001128 | 1 | Job |
|---|
| 17 | 17 | Supply & fixing of Mild steel Iron work in different type of structhre to be coverd of wall Including all lab., mat., & T&P etc all complete. | BI01010001010000000000000515BI0100001129 | 11.3 | Qtl. |
|---|
| 18 | 18 | Supply & fixing of Galvanized Corrugated Iron sheet to be covered at wall including etc all complete. | BI01010001010000000000000515BI0100001130 | 55 | Sqm |
|---|
| 19 | 19 | Painting or varnishing with two coats and one coat of Primer etc all complete. | BI01010001010000000000000515BI0100001131 | 28 | Sqm |
|---|
| 20 | 20 | Cartage of surplus earth or waste material up to 3kms distance from site etc all complete. (S.I.No.231(a)) (A/R) | BI01010001010000000000000515BI0100001132 | 12 | Cum |
|---|
| 21 | 21 | R.C.C. work with cement, approved coarse sand 20mm gauge stone grit in the proportion 1:1½:3 including centering & shuttering, lab., mat& T&P all complete but excluding supply of reinforcement and its bending (S.I.No.289) | BI01010001010000000000000515BI0100001133 | 2.5 | Cum |
|---|
| 22 | 22 | Mild Steel or iron works in reinforced concrete/brick work including cutting and bending for proper completion of the work etc all complete. (S.I.No.504) | BI01010001010000000000000515BI0100001134 | 2 | Qtl |
|---|
| 23 | 23 | Supply & fixing of pedustal inlcuding all lab., mat., T&P etc all complete. | BI01010001010000000000000515BI0100001135 | 1 | Nos |
|---|