| 1 | 1.1 | OFC schedule rates | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.12 | Excavating trenches up to 165 cm and back filling the excavated trenches after laying the HDPE pipe with or without protection rate for 1 in Non Rock strata kaccha | BI01010001010000000000000515BI0100001113 | 6000 | meters |
|---|
| 3 | 1.13 | 2 in Soft Rock strata | BI01010001010000000000000515BI0100001114 | 4500 | meters |
|---|
| 4 | 1.14 | 3 in Hard Rock strata | BI01010001010000000000000515BI0100001115 | 4500 | meters |
|---|
| 5 | 1.2 | PLB Lying. | BI01010001010000000000000515BI0100001116 | 15000 | meters |
|---|
| 6 | 1.3 | Horizontal Boring at depth of 1.65 mtrs. For crossing roads/railway track. Inserting 100/65/40 mm dia GI pipes and pushing HDPE pipes/coils inside and Drawing 6mm PP rope. Based on market survey. | BI01010001010000000000000515BI0100001117 | 200 | meters |
|---|
| 7 | 1.4 | Way leave permission from local authorities) | BI01010001010000000000000515BI0100001118 | | |
|---|
| 8 | 1.5 | Laying and fixing of G.I. Pipes of 100/65/40 mm on Bridges and culverts with PLB pipe | BI01010001010000000000000515BI0100001119 | 200 | meters |
|---|
| 9 | 1.6 | Laying & fixing GI pipes with PLB pipe | BI01010001010000000000000515BI0100001120 | 200 | meters |
|---|
| 10 | 1.61 | Unforeseen expenditure if any | BI01010001010000000000000515BI0100001121 | 10000 | Per unit |
|---|
| 11 | 1.62 | Supply of 1''/32mm dia.Green flexible pipe,if required | BI01010001010000000000000515BI0100001122 | | |
|---|
| 12 | 1.63 | Laying ,fixing and sealing of full round 100/65/40 mm RCC Pipes with HDPE pipes/coils/inside and drawing PP rope | BI01010001010000000000000515BI0100001123 | 500 | meters |
|---|
| 13 | 1.64 | BJC/SJC Joint Closure | BI01010001010000000000000515BI0100001124 | 12 | Per unit |
|---|
| 14 | 1.7 | DWC Duct laying | BI01010001010000000000000515BI0100001125 | 2000 | meters |
|---|
| 15 | 1.71 | Concreting RCC protection | BI01010001010000000000000515BI0100001126 | 200 | Per Cu M |
|---|
| 16 | 1.8 | Opening of man holes, pulling of OF cable, sealing of HDPE pipes in manholes by rubber bushes and providing HDPE/RCC split pipes in manholes and back filling of manholes and putting rope in PLB pipes | BI01010001010000000000000515BI0100001127 | 3000 | meters |
|---|
| 17 | 1.9 | Splicing/Termination of Optical Fibre Cable 12/24/48/96 F Based on market rates. | BI01010001010000000000000515BI0100001128 | 8 | per Joint/termination |
|---|
| 18 | 2 | Digging of pits for jointing chamber, construction of brick chamber, filling of brick chamber with clean sand, supply and placing of pre-cast RCC slabs on brick chamber and back filling of jointing pit. Based on market rates. | BI01010001010000000000000515BI0100001129 | 7 | Per jointing chamber |
|---|
| 19 | 2.1 | supply & laying Half Round RCC | BI01010001010000000000000515BI0100001130 | 1000 | meters |
|---|
| 20 | 2.2 | Joint chamber | BI01010001010000000000000515BI0100001131 | 8 | Per unit |
|---|
| 21 | 2.3 | supply & laying full Round 100 mm RCC | BI01010001010000000000000515BI0100001132 | 500 | Lump sum |
|---|
| 22 | 2.4 | Cost of recovery of empty cable drums Optical fiber drum (6/12/24/48/96F) | BI01010001010000000000000515BI0100001133 | 7 | Per drum |
|---|
| 23 | 2.5 | Supply and laying of half round 100mm RCC pipe in trenches with HDPE pipe/PLB coils inside and drawing PP rope. | BI01010001010000000000000515BI0100001134 | 1000 | Per meter |
|---|
| 24 | 2.6 | Supply of route indicator/ Joint indicator | BI01010001010000000000000515BI0100001135 | 8 | Per unit |
|---|
| 25 | 2.7 | Getting required way leave permission from local authorities i.e. National/State highways, Local Municipal etc.( Necessary payment to authorities will be made by BSNL Solapur) | BI01010001010000000000000515BI0100001136 | 5 | Per route |
|---|
| 26 | 2.8 | OF cable pulling | BI01010001010000000000000515BI0100001137 | 16000 | Per meter |
|---|
| 27 | 2.9 | road crossing | BI01010001010000000000000515BI0100001138 | 200 | Per meter |
|---|
| 28 | 3 | DWC Duct | BI01010001010000000000000515BI0100001139 | 2000 | Per meter |
|---|