Development Of Dumping Yard In Sy.No:10/4 & 11/2 At Parvathapur In Peerzadiguda Municipal Corporation Under General Funds 2019-20.(Construction Of Dry Resources Collection Centre (Drcc) Shed), MEDCHAL-MALKAJGIRI-Telangana

Municipalities-M has published Development Of Dumping Yard In Sy.No:10/4 & 11/2 At Parvathapur In Peerzadiguda Municipal Corporation Under General Funds 2019-20.(Construction Of Dry Resources Collection Centre (Drcc) Shed). Submission Date for this Tender is 09-04-2020. Land Development Tenders in MEDCHAL-MALKAJGIRI Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

24144037
Development Of Dumping Yard In Sy.No:10/4 & 11/2 At Parvathapur In Peerzadiguda Municipal Corporation Under General Funds 2019-20.(Construction Of Dry Resources Collection Centre (Drcc) Shed)
Open Tender
Indian
Telangana
MEDCHAL-MALKAJGIRI
09-04-2020

Tender Details

Development Of Dumping Yard In Sy.No:10/4 & 11/2 At Parvathapur In Peerzadiguda Municipal Corporation Under General Funds 2019-20.(Construction Of Dry Resources Collection Centre (Drcc) Shed)

Key Value

Document Fees
Refer document
EMD
INR 41122.0 /-
Tender Value
INR 41.12 Lakhs /-

BOQ Items

S.No Subwork Name Specification Number Quantity UOM Rate(INR) Amount(INR)
1 Construction of Dry Resources Collection (DRCC) Shed Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per size 1.00 nos 3555.84 3555.84
Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia \B\ class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete
2 Construction of Dry Resources Collection (DRCC) Shed Supply and fixing SPN Distribution board with IP-20 protection suitable for single phase Earth Leaka 1.00 nos 2890.00 2890.00
Supply and fixing SPN Distribution board with IP-20 protection suitable for single phase Earth Leakage Circute Braker (ELCB) / Residual Current Circute Braker (RCCB) / Double Pole (DP) Isolator as incomer and 10kA SP MCBs as out going including internal connections , cost and conveyance of all materials and labour charges etc., complete for finished item of work.
3 Construction of Dry Resources Collection (DRCC) Shed Supply and erecting ceiling fan with 3 blades and double ball bearing and with condensor A.C 250V. 5 10.00 nos 2000.00 20000.00
Supply and erecting ceiling fan with 3 blades and double ball bearing and with condensor A.C 250V. 50C/S OF 1200mm sweep completly errected in position with Resistance type regulator, canopy down rod upto 304.80mm in length is provided with hook/clamps nuts and bolts and 24/0. flexible copper wire etc., complete and pointed with lettering by enamel paint the Sr No. and date of errection including cost and conveyance of all materials and labour charges for finished item of work.
4 Construction of Dry Resources Collection (DRCC) Shed Supply and run of 2 of 22/0.3mm (1.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing p 150.00 rmt 46.00 6900.00
Supply and run of 2 of 22/0.3mm (1.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.
5 Construction of Dry Resources Collection (DRCC) Shed Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. insulated flexible copper cable in existing 150.00 rmt 40.60 6090.00
Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for earth continuity including all labour charges etc., complete.
6 Construction of Dry Resources Collection (DRCC) Shed Wiring with 2 of 14/0.3mm (1.0 Sq.mm) P.V.C. insulated F.R. flexible copper cable (ISI MARK) in exis 45.00 nos 290.60 13077.00
Wiring with 2 of 14/0.3mm (1.0 Sq.mm) P.V.C. insulated F.R. flexible copper cable (ISI MARK) in existing pipe with 6A switch control and 3/2 pin sockets fixing on separate board including all labour charges etc., complete.
7 Construction of Dry Resources Collection (DRCC) Shed Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cabl 30.00 nos 460.33 13810.00
Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings
8 Construction of Dry Resources Collection (DRCC) Shed Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all require 150.00 rmt 65.20 9780.00
Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.
9 Construction of Dry Resources Collection (DRCC) Shed Supplying and fixing of MS Gate using TUB 100 100 5 mm alround and TUB 70x70x3mm vertically at 0. 12.00 sqm 4884.00 58608.00
Supplying and fixing of MS Gate using TUB 100 100 5 mm alround and TUB 70x70x3mm vertically at 0.150m c/c, Top & bottom 0.50m ht TUB 25 25 3 0.15m c/c fixing with 6 Nos of MS hinges 32 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting gate with one coat of red oxide primer including cost and conveyance of all materials,Locking arrangment, Ornamental pieces etc ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work.
10 Construction of Dry Resources Collection (DRCC) Shed Supply and fixing of M.S TUB of 25 25 3 mm 0.2m c/c vertically & horizontzlly and painting wit 28.85 sqm 2072.42 59789.32
Supply and fixing of M.S TUB of 25 25 3 mm 0.2m c/c vertically & horizontzlly and painting with synthatic enamel paint over two coates of metal primary including cost and covneyance of all mateirals, Fabrication, Fixing charges etc complete for finished item of work.
11 Construction of Dry Resources Collection (DRCC) Shed Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine 340.89 sqm 375.61 128041.76
Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal, sand and water etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials
12 Construction of Dry Resources Collection (DRCC) Shed Supply and fixing of pre-painted steel casement/open able windows base steel as per IS 513 of - 0.58 14.40 sqm 7608.80 109566.72
Supply and fixing of pre-painted steel casement/open able windows base steel as per IS 513 of - 0.58 mm thick \D quality, galvanized as per IS277,finishpaintedwithapolyesterpaint,section for outer frame of 46 x 52 mm section forshutterof 46 x 46 mm section for mullion 46 x 70 mm, and section for beading 18 x 25 mm panelledwith 5 mm thick plain float glass fitted with EPDM gaskets, handle made of high gradealuminium powder coated frames fixed to the concrete /masonry wall by means of selfexpanding screws including 10 mm squareguard bars @ 150 mm pitch for Windows: Doubleshutter with mullion section for sizes 3\-0 x 4\-0 (914.4mm x 1219.2 mm) and 4\-0 x 4 \-0(1219.2x1219.2mm)
13 Construction of Dry Resources Collection (DRCC) Shed Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked toget 32.40 sqm 4441.21 143895.20
Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special spn: 1108
14 Construction of Dry Resources Collection (DRCC) Shed Roofing with Pre-painted Galvanized Trapezoidal Profile Roofing sheets with 0.47mm thickness fixed w 584.40 sqm 610.04 356507.38
Roofing with Pre-painted Galvanized Trapezoidal Profile Roofing sheets with 0.47mm thickness fixed with G.I ?J? bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled with white lead & including Roof Accessories medium size: Ridge, Barge Cap, Corner Trim, L-Flashing, Down Pipes, Gutter etc., with 0.50mm thick, Width: 0.585, Length: Maximum 2½ Meters (up to a pitch of 600) etc., complete, excluding the cost of purlins, rafters, trusses & cost of conveyance of all materials
15 Construction of Dry Resources Collection (DRCC) Shed BLD-CSTN-12-12-(193): Painting with Synthetic Enamel paints - Two Coats - for New Iron Work includi 460.30 sqm 101.86 46886.16
BLD-CSTN-12-12-(193): Painting with Synthetic Enamel paints - Two Coats - for New Iron Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).
16 Construction of Dry Resources Collection (DRCC) Shed Supply & Fixing of Roof truss using MS tubes of different sizes including all scaffolding, hire an 15942.87 kg 113.84 1814936.32
Supply & Fixing of Roof truss using MS tubes of different sizes including all scaffolding, hire and operational charges of machinary, all labour charges and Fabrication charges etc complete for finished item of work.
17 Construction of Dry Resources Collection (DRCC) Shed Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a ba 372.88 sqm 212.23 79136.32
Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls
18 Construction of Dry Resources Collection (DRCC) Shed Plastering to external walls in 20mm thick in two coats with base coat of 16mm thick in C.M. (1:6) a 189.20 sqm 468.70 88678.04
Plastering to external walls in 20mm thick in two coats with base coat of 16mm thick in C.M. (1:6) and topcoat of 4mm thick in C.M (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand,. Water, etc., to site cost of seigniorage charges on all materials, all taxes, all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls, (As per SS 904)
19 Construction of Dry Resources Collection (DRCC) Shed Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 183.68 sqm 391.09 71835.41
Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing. including cost & conveyance of all materials like cement, Sand,. Water, etc., to site cost of all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls, (As per SS 904).
20 Construction of Dry Resources Collection (DRCC) Shed Brick Masonry with 2nd class non modular/ traditional size 23 x 11 x 7cms Bricks in CM (1:6) 40.21 cum 5826.57 234286.38
Brick Masonry with 2nd class non modular/ traditional size 23 x 11 x 7cms Bricks in CM (1:6) prop having a crushing strength of not less than 35.00kg/cm2 including cost and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete
21 Construction of Dry Resources Collection (DRCC) Shed BLD-CSTN-2-8 (16) : Filling with gravel in trenches, sides of foundations and basement with initi 98.72 cum 426.73 42126.79
BLD-CSTN-2-8 (16) : Filling with gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
22 Construction of Dry Resources Collection (DRCC) Shed Supplying, fitting and placing TMT (thermo mechanically treated)bar reinforcement complete as per d 2288.12 cum 61.01 139598.20
Supplying, fitting and placing TMT (thermo mechanically treated)bar reinforcement complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded. HYSD-Fe500, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including all materials etc., complete for finished item of work in all floors.( APSS No.126)
23 Construction of Dry Resources Collection (DRCC) Shed Supply and placing of the M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MI 11.76 sqm 967.57 11378.65
Supply and placing of the M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work.for sunshade for windows
24 Construction of Dry Resources Collection (DRCC) Shed Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 using WEIGH BATCHER 0.54 cum 12122.36 6557.71
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. for Lintels
25 Construction of Dry Resources Collection (DRCC) Shed Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 using WEIGH BATCHER 9.11 cum 11680.58 106410.08
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. for Plinth Beams
26 Construction of Dry Resources Collection (DRCC) Shed Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 using WEIGH BATCHER 9.45 cum 11963.30 113053.18
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. for Columns
27 Construction of Dry Resources Collection (DRCC) Shed Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 using WEIGH BATCHER 12.97 cum 9367.37 121494.79
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. for Footings
28 Construction of Dry Resources Collection (DRCC) Shed Construction of in CRS Masonary using 2nd Sort granite stone in Cement Mortor 1:6 Prop using hard 9.72 cum 4527.17 44004.09
Construction of in CRS Masonary using 2nd Sort granite stone in Cement Mortor 1:6 Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, Etc., including Cost of on all Materials, Labour for cutting Stones to required size and shape mixing of Cement Mortor Construction, Scaffolding Charges curing Etc., Complete for Finished item of Work . (As per SS 611)
29 Construction of Dry Resources Collection (DRCC) Shed BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite 19.44 cum 4065.95 79042.07
BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work
30 Construction of Dry Resources Collection (DRCC) Shed Plain cement concrete in (1:4:8) prop using 40mm nominal size machine crushed HBG metal as per S.S. 35.13 cum 4499.93 158082.54
Plain cement concrete in (1:4:8) prop using 40mm nominal size machine crushed HBG metal as per S.S. 108 machine mixing incluiding cost and conveyance of materials and labour charges such as mixing concrete , laying , tamping, curing all operational charges etc complete as per S.S 402 for finished item of work.
31 Construction of Dry Resources Collection (DRCC) Shed BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundati 100.50 cum 220.84 22194.42
BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail