| 1 | 1 | Earth work in excavation by manual means over areas(exceeding 30cm and up to 1.5 m in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth up to 1m from cutting edge, disposed earth to be leveled and neatly dressed in :( all kinds of soil). | | 192.12 | Cum |
|---|
| 2 | 2 | Disposal of excavated earth obtained from cutting by Mechanical transport for an average distance of 5 Km incl. cost of loading/ unloading complete. | | 115.27 | Cum |
|---|
| 3 | 3 | Filling with available excavated earth ( excluding roack) in trenches, plinth and side of foundation etc. layers not exceeding 20 Cm depth, consolidating each deposited layers by ramming and watering lead up to 50m and lift up to 1.5m.( incl. all lead, lifts and carriages etc. complete). | | 224.21 | Cum |
|---|
| 4 | 4 | Supplying and filling in plinth with fine sand under floors including watering, ramming consolidating and dressing complete.( incl. all lead, lifts and carriages etc. complete). | | 98.24 | Cum |
|---|
| 5 | 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shutering- all work upto plinth level in: ( incl. all lead, lifts and carriages etc. complete).\n\n1:4:8 ( 1 cement : 04 coarse sand : 8 graded stone aggregate 40mm nominal size). Crushed | | 76.98 | Cum |
|---|
| 6 | 6 | 1:3:6( 1 cement : 03 coarse sand : 6 graded stone aggregate 20mm nominal size). Crushed | | 49.05 | Cum |
|---|
| 7 | 7 | Providing and laying in position specified grade of rainforced ccement concrete excliding the cost of centring, shuttering, finishing and reinforecement- all work upto plinth level in:( incl. all lead, lifts and carriages etc. complete).\n\n1.1.5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). Crushed | | 55.96 | Cum |
|---|
| 8 | 8 | Reinforced cement concrete work in all walls( any thickness), incl. attached pilasters, buttresses plinth and string courses, fillets, columns, pillars, piers, abutments, posts and structs etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforecement in: ( incl. all lead, lifts and carriages etc. complete).\n\n1.1.5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). Crushed | | 61.18 | Cum |
|---|
| 9 | 9 | Labour charges for reinforcement for RCC work including straighting, cutting, bending, placing in position and binding all complete ( Hot rolled deformed bars).All works upto plinth level | | 141.72 | Qtl. |
|---|
| 10 | 10 | Labour charges for reinforcement for RCC work including straighting, cutting, bending, placing in position and binding all complete ( Hot rolled deformed bars).All works above plinth level upto floor two level. | | 165.29 | Qtl. |
|---|
| 11 | 11 | Centering and shuttering incl. strutting, propping etc. and removal of form work for :.( incl. all lead, lifts and carriages etc. complete).\n\nFoundations, footings, basis of columns etc. for mass concrete. | | 53.33 | Sqm |
|---|
| 12 | 12 | Columns, pillars, piers, abutment, posts and struts | | 434.19 | Sqm |
|---|
| 13 | 13 | Lintels, beams , plinth beams, girders, bressumers and centilevers | | 200.34 | Sqm |
|---|
| 14 | 14 | Walls ( any thickness) including attach pilasters, butteresses, plinth and string courses etc. | | 184 | Sqm |
|---|
| 15 | 15 | Brick work with common burnt clay F.P.S ( non- modular) bricks of class designation 75 in super structure in cement motor 1:6 ( 1 cement : 6 fine sand)( incl. all lead, lifts and carriages etc. complete) | | 84.04 | Cum |
|---|
| 16 | 16 | 15mm cement plaster on the rough side of single or half brick wall of mix 1:6( 1 cement :6 fine sand)( incl. all lead, lifts and carriages etc. complete). | | 743.95 | Sqm |
|---|
| 17 | 17 | 20mm cement plaster of mix 1:4( 1cement: 4 fine sand)( incl. all lead, lifts and carriages etc. complete). | | 541.15 | Sqm |
|---|
| 18 | 18 | 62 mm thick cement concrete with \" Hardcrete\" concrete hardener topping, under layer 50 mm thick cement concrete 1:2:4( 1 cement: 2 course sand :4 graded stone aggregate 20mm nominal size)and top layer 12 mm thick harddrete cement hardener consisting of mix 1:2( 1 cement hardener mix :2 stone aggregates, 6 mm nominal size) by volume. Hardcrete hardening compound of snowcem India Ltd. or equivalent is mixed @ 2 litre hadcrete 50 kg of cement incl. cement slurry but excluding the cost of nosing of steps etc. complete( crushed)( incl. all lead, lifts and carriages etc. complete). | | 585.5 | Sqm |
|---|
| 19 | 19 | Providing and fixing glass strip in joints of cement concrete floor 50mm wide and of 8 mm thick ( incl. all lead, lifts and carriages etc. complete). | | 1920.73 | Mtr. |
|---|
| 20 | 20 | Structural steel work welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.( incl. all lead, lifts and carriages etc. complete). | | 26347 | Kg |
|---|
| 21 | 21 | Providing corrugated G.S. sheet roofing including vertical/ curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/ vertical or curved surface) excluding the cost of purlins, rafters and trusses and including cutting to size and shape whereever required ( 0.63mm thick with zinc coating not less than 275gm/m2 ( incl. all lead, lifts and carriages etc. complete). | | 878.25 | Sqm |
|---|
| 22 | 22 | Providing ridges or hips of width 60 Cm overall width plan GS Sheets fixed with polymer coated J or L hooks, bolts and nuts 8mm dia G.I limpet and bitumen washer complete( 0.63 mm thic with zinc coating not less than 275gm/m2)( incl. all lead, lifts and carriages etc. complete). | | 117.09 | Mtr. |
|---|
| 23 | 23 | Providing and fixing 32 mmx250 mm plained eves boarding of 2nd classs kail wood( incl. all lead, lifts and carriages etc. complete). | | 100.6 | Mtr. |
|---|