| 1 | 1 | Attending and rectification of existing window/ split AC faults including providing minor spares if reqd such as connecting copper wires, removing & cleaning of filters, cleaning of units by blowers, control fuse, ferrules, lugs i/c minor works etcalongwith testing & commissioning in URBAN site complete as required. (Item will be measured on submission of visit report duly signed by BSNL authority and allowed at once per site per fault) (Note:- For subsequent visit to attend the window/ split AC to provide the items hereunder will not be paid separately. It is assumed that all items as below shall be carried out by firm in first visit only) | BI01010001010000000000000515BI0100001118 | 40 | Jobs |
|---|
| 2 | 2 | Attending and rectification of existing window/ split AC faults including providing minor spares if reqd such as connecting copper wires, removing & cleaning of filters, cleaning of units by blowers, control fuse, ferrules, lugs i/c minor works etcalongwith testing & commissioning in RURAL site complete as required. (Item will be measured on submission of visit report duly signed by BSNL authority and allowed at once per site per fault) (Note:- For subsequent visit to attend the window/ split AC to provide the items hereunder will not be paid separately. It is assumed that all items as below shall be carried out by firm in first visit only) | BI01010001010000000000000515BI0100001119 | 60 | Jobs |
|---|
| 3 | 3 | Carrying out Wet Servicing of 1.5TR/2TR window/Split AC unit i/c removing, cleaning all components and filters, dedusting by high pressure air blower, washing condenser, evaporator i/c chemical cleaning (if required), refixing, tightening electrical connections, testing of AC unit, recording all parameters in service report etc as reqd. | BI01010001010000000000000515BI0100001120 | 175 | Jobs |
|---|
| 4 | 4 | Carrying out leak testing of 1.5TR/ 2 TR Split/WAC AC units with nitrogen gas including dismantling of machine, flushing the system, brazing/flaring the leak points, vacumising, purging and making the system leak proof i/c transportation of nitrogen cylinder, brazing kit & vacuum pump, supplying & charging of R22 refrigerant gas at site, reinstallation, testing & commissioning etc as required. | BI01010001010000000000000515BI0100001121 | | |
|---|
| 5 | 5 | 1.5 TR | BI01010001010000000000000515BI0100001122 | 60 | Jobs |
|---|
| 6 | 6 | 2.0 TR | BI01010001010000000000000515BI0100001123 | 25 | Jobs |
|---|
| 7 | 7 | Replacement of following capacity of existing old defective compressor with new Sealed compressor i/c dismantling of faulty compressor, cutting refrigerant piping, brazing & making necessary addition/alteration i/c proper mounting on base plate, connection of suction and discharge lines, Leak test & charging refrigerant i/c testing etc as reqd.(M/s Emerson/Tecumseh/SS make)\n(NOTE- The firm shall submit test certificate or documentary proof towards purchase of New/OEM factory repaired compressor.) \nThe defective compressor shall be the property of agency & firm should consider suitable price rebate for the same while quoting. The material under replacement shall be similar to existing defective material or as per product directory) | BI01010001010000000000000515BI0100001124 | | |
|---|
| 8 | 8 | 1.5 TR | BI01010001010000000000000515BI0100001125 | 25 | Jobs |
|---|
| 9 | 9 | 2.0 TR | BI01010001010000000000000515BI0100001126 | 10 | Jobs |
|---|
| 10 | 10 | Replacement of following material for repairing & attending break down complaints of 1.5/ 2 TR WAC/SAC units i/c dismantling, connection, fixing & testing etc as required\n(NOTE- The defective material shall be the property of agency & firm should consider suitable price rebate for the same while quoting. The material under replacement shall be similar to existing defective material or as per product directory.\n | BI01010001010000000000000515BI0100001127 | | |
|---|
| 11 | 11 | Starting capacitor (Metal Body) of rating 80/100 Mfd(M/s Epcos/Asian/SS make) | BI01010001010000000000000515BI0100001128 | 50 | Nos. |
|---|
| 12 | 12 | Running capacitor (Metal Body) of rating 36 Mfd (M/s Epcos/Asian/SS make) | BI01010001010000000000000515BI0100001129 | 60 | Nos. |
|---|
| 13 | 13 | Repairing of Control card of indoor split AC unit | BI01010001010000000000000515BI0100001130 | 25 | Nos. |
|---|
| 14 | 14 | Replacement of Control card PCB suitable for 1.5TR Split AC units | BI01010001010000000000000515BI0100001131 | 25 | Nos. |
|---|
| 15 | 15 | Condenser fan blade(PVC/FRP) | BI01010001010000000000000515BI0100001132 | 20 | Nos. |
|---|
| 16 | 16 | Box Type relay for Window AC units.(M/s Arvind/Ranutrol/SS make) | BI01010001010000000000000515BI0100001133 | 20 | Nos. |
|---|
| 17 | 17 | Selector switch for Window AC units | BI01010001010000000000000515BI0100001134 | 20 | Nos. |
|---|
| 18 | 18 | Blower Fan motor for IDU of Split AC unit(M/s AUE/MarathonGE/Natinoal/Diamond/SS make) | BI01010001010000000000000515BI0100001135 | 25 | Nos. |
|---|
| 19 | 19 | Thermostat(M/s Danfoss/indfoss/Arvind/SS make | BI01010001010000000000000515BI0100001136 | 30 | Nos. |
|---|
| 20 | 20 | Washable Nylon Air Filter | BI01010001010000000000000515BI0100001137 | 30 | Nos. |
|---|
| 21 | 21 | Replacement of condenser motor of 1.5/2 TR Split/window AC unit from workshop complete with reinstallation, testing etc as required | BI01010001010000000000000515BI0100001138 | 20 | Jobs |
|---|
| 22 | 22 | Replacement of rusted base plate of window AC 1.5 TR unit with MS sheet plate i/c fabrication & mounting of all accessories etc as required. | BI01010001010000000000000515BI0100001139 | 20 | Jobs |
|---|
| 23 | 23 | Dismantling & shifting of existing indoor & outdoor unit from one site & ITC at another site & dismantling existing/ faulty unit & keeping it to the location as directed by engineer-in-charge etc. complete testing, connections complete as reqd.\n (Note: Transportation charges shall be paid extra) | BI01010001010000000000000515BI0100001140 | 20 | Jobs |
|---|