| 1 | 1 | Earth work in stony earth and gravels mixed with stone and boulder not exceeding 0.014 cum. In volume within 50 m. initial lead and1.5 m. initial lift including rough dressing and breaking clods to maximum 5 cm to 7cm and laying in layer not exceeding 0.3 m.in depth and as per specification approved by the department. | BI01010001010000000000000515BI0100001114 | 77.69 | Cum |
|---|
| 2 | 2 | Filling in foundation and plinth with sand, well watered and rammed to required thickness with all leads and lifts, cost conveyance & royalty and all taxes of materials, cost of labour, T & P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. | BI01010001010000000000000515BI0100001117 | 24.89 | Cum |
|---|
| 3 | 3 | Cement Concrete (1:3:6) by using 4cm. Size .B.H.G. metal including watering and curing,cost,conveyance, taxes and royalties of all materials and labour with T&P required for the work etc complete and as per specification and direction of Engineer in Charge. | | 11.66 | Cum |
|---|
| 4 | 4 | R.R. stone masonary with C.M. (1:6 ) with all cost,conveyance, taxes and royalties of all materials and labour with T&P required for the work etc complete and as per specification and direction of Engineer in Charge. | | 17.34 | Cum |
|---|
| 5 | 5 | RCC work of M-20 grade with 20mm and down grade black hard granite (crusher broken) stone chips incuding watering and curing etc. complete as per direction of Engineer-in charge. Columns base, Plinth band &Footing | | 8.17 | Cum |
|---|
| 6 | 6 | Plinth | | 3.2 | cum |
|---|
| 7 | 7 | Columns & Beam | | 3.74 | cum |
|---|
| 8 | 8 | Lintel Bend | | 1.48 | Cum |
|---|
| 9 | 9 | Chajja | | 5.46 | Sqm |
|---|
| 10 | 10 | Slab & Chajja | | 8.29 | Cum |
|---|
| 11 | 11 | Well C.B. brick massonary of size 23 cm x 12cm x 8cm in cement mortar (1:6) in superstructure including cost, convayancy & royalty etc. complete. | | 32.08 | Cum |
|---|
| 12 | 12 | Supplying, fitting and placing uncoated HYSD bars reinforcement tying the grills, straighten placing them in position including cost of bindings wire 18 to 20mm gauge including cost of HYSD bar with conveyance and royalty etc. complete and as per technical specification and direction of Engineer-in charge. | | 25.21 | Qntl |
|---|
| 13 | 13 | Supplying, fitting and fixing of M.S. Door & window, Collapsible Gate, Grills & Gates along with grills including all cost, conveyance of all materials etc. complete as directed by E.I.C. with all labour, T&P, Taxes etc. | | 1008.88 | Kg |
|---|
| 14 | 14 | 12mm thick Cement Plaster in C.M. (1:6) over brick work including watering and curing, cost, conveyance,taxes and royalties and labour with required for the work etc complete. | | 87.7 | Sqm |
|---|
| 15 | 15 | 16 mm thick Cement Plaster in C.M. (1:6) over brick work including watering and curing, cost, conveyance,taxes and royalties and labour with required for the work etc complete. | | 133.86 | Sqm |
|---|
| 16 | 16 | 20mm thick Cement Plaster in C.M. (1:6) over brick/stone work including watering and curing, cost, conveyance,taxes and royalties and labour with required for the work etc complete. | | 11.36 | Sqm |
|---|
| 17 | 17 | Fixing of vertified tiles in floors tread or steps and landing on 25mm thick bed on CM(1:1) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing including cost, conveyance and tax of tile etc complete. | | 37.19 | Sqm |
|---|
| 18 | 18 | Providing and fixing Ceramic tiles in floors, treads or steps and landing on 25 mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles as directed by the Engineer-in-charge. | | 12.44 | Sqm |
|---|
| 19 | 19 | Priming two coats with approved primer over wall surface including all cost, conveyance,tax of materials and labour with T&P required for the work etc complete. | | 285.67 | Sqm |
|---|
| 20 | 20 | Wall painting two coats with approved plastic emulsion paint over wall surface including all cost, conveyance,tax of materials and labour with T&P required for the work etc complete. | | 114.62 | Sqm |
|---|
| 21 | 21 | Painting Two coats (Enamel Paint) with any approved shade on new/Old Doors and windows including all cost, conveyance,tax of materials and labour with T&P required for the work etc complete. | | 60.46 | Sqm |
|---|
| 22 | 22 | Distempering two coat with any approved distemper on new work after scraping and cleaning the surface over one coat of water bound wall primer including watering and curring all cost of materials, scaffolding, labour with T&P etc. complete as per direction of Engineer-in-charge. | | 171.05 | Sqm |
|---|
| 23 | 23 | Providing 20mm thick grading concrete in C.C. (1:2:2) laid in proper slope over terrace roof slab by using two part of sand, one part of cement and two parts of 6mm size black hard crusher broken granite chips | | 55.07 | Sqm |
|---|