Indira Gandhi Canal Project Rajasthan-IGCPR has published Repair Of 33/6 . 6Kv3500kva Power Transformer Installed At Ps Ii Of Plb Lift. Submission Date for this Tender is 16-03-2020. Transformer Oil Tenders in PS II of PLB lift Rajasthan. Bidders can get complete Tender details and download the document.
Name of Work:Repair of 33/6.6KV3500KVA Power Transformer installed at PS II of PLB lift | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | 33/6.6KV,3500KVA Transformer | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | HV Leg Coils insulation varnishing and banking of coil assembly (CU) | BI01010001010000000000000515BI0100001113 | 800 | Kg |
3 | 1.02 | LV Leg Coils insulation varnishing and banking of coil assembly (CU) | BI01010001010000000000000515BI0100001114 | 600 | Kg |
4 | 1.03 | Fresh Transformer oil of standard quality of standard make | BI01010001010000000000000515BI0100001115 | 2470 | Ltr |
5 | 1.04 | HT Bushing 33KV as per ISS | BI01010001010000000000000515BI0100001116 | 3 | Nos |
6 | 1.05 | LT Bushing 0.433KV as per ISS | BI01010001010000000000000515BI0100001117 | 3 | Nos |
7 | 1.06 | HT Bushing Rod & Metal Parts (HV) | BI01010001010000000000000515BI0100001118 | 3 | Nos |
8 | 1.07 | LT Bushing Rod & Metal Parts (HV) | BI01010001010000000000000515BI0100001119 | 3 | Nos |
9 | 1.08 | Set of Gaskets (Rubberised Cork/Neoprene) | BI01010001010000000000000515BI0100001120 | 1 | Set |
10 | 1.09 | Sundary Items Viz Cover Bolt, nut, plug,cap screw etc | BI01010001010000000000000515BI0100001121 | 1 | Set |
11 | 1.1 | Silica gel breather | BI01010001010000000000000515BI0100001122 | 1 | Nos |
12 | 1.11 | Oil Level gauge (prasmetic) | BI01010001010000000000000515BI0100001123 | 1 | Nos |
13 | 1.12 | Tap Changer | 1 | Nos | |
14 | 1.13 | Insulating material | 1 | set | |
15 | 1.14 | Unloading and opening of transformer cover, draining of oil, detanking of core and coil assembly, assesment and estimation for repair and replacement of parts cleaning and washing dust/ rust and dirt from all parts including core tank and cooling tubes, retanking after replcement of parts/ repairs, filling fresh oil after filteration, tanking of transformer for test and testing for all routine tests as in case of new transformer as per IS 2026/1977 with latest amendments after satisfactory repair and testing , loading of transformer to our works. | 1 | Job | |
16 | 1.15 | Freight Loading and Unloading (to and fro) | 1 | Job | |
17 | 1.16 | Filteration of oil | 2470 | Ltr | |
18 | 1.17 | Painting inside with two coat of zink chromate and outside of gray paint | 1 | Job | |
19 | 1.18 | Minor welding work | 1 | Job | |
20 | 2 | Scrap Value | BI01010001010000000000000515BI0100001124 | ||
21 | 2.01 | Scrap of HV/LV Coil(80% of total weight) | BI01010001010000000000000515BI0100001125 | 1120 | Ltr |
22 | 2.02 | Scrap of Transformer oil | BI01010001010000000000000515BI0100001126 | 2470 | Nos |