Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Tender For Calibration Of Instruments, Regular And Breakdown Maintenance Of C&I Instruments And Equipments At Vgtps/Phase-Ii For The Period From 01.04.2020 To 30.09.2020.. Submission Date for this Tender is 20-03-2020. Gaskets Tenders in Valuthur,Ramnad Tamil Nadu. Bidders can get complete Tender details and download the document.
Name of Work: Calibration of Instruments, regular and breakdown maintenance of C&I Instruments and Equipments at VGTPS/Phase-II for the period from 01.04.2020 to 30.09.2020. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Calibration of Instruments, regular and breakdown maintenance of C&I Instruments and Equipments at VGTPS/Phase-II for the period from 01.04.2020 to 30.09.2020. | |||
2 | 1.01 | Calibration of instruments: Calibration of pressure and temperature gauges | 200 | Instrument | |
3 | 1.02 | Calibration of instruments: Calibration of pressure, temperature, level and flow transmitters/switches, RTD, Thermocouples and ON/OFF Solenoid valves etc. | 140 | Instrument | |
4 | 1.03 | Calibration of instruments: Calibration of pneumatic control valves operated by I/P positioners, smart positioners and Hydraulic valves operated by I/H converters and LVDTs, Calibration of CEMS analyzer | 40 | Nos | |
5 | 1.04 | Daily walk down work: Daily Walk down and visual inspection of field instruments | 183 | Day | |
6 | 1.05 | Instruments cleaning and terminal tightness checking work:Cleaning and terminal tightness checking of Pressure/temperature/flow/level Transmitters, switches, signal conditioners & sensors, Junction Boxes, On/Off valve Actuator etc. impulse line flushing and leak attending work | 250 | Instrument | |
7 | 1.06 | Instruments cleaning and terminal tightness checking work:Cleaning, terminal tightness checking and leakage arresting of Pressure/Temperature gauges Thermocouples, RTD, SOV, Limit switches and SWAS & CEMS equipment’s etc. | 120 | Instrument | |
8 | 1.07 | Instruments cleaning and terminal tightness checking work:Control valve positioner/air filter regulator/airlock relay/ Volume booster etc. cleaning and leak attending work | 40 | Nos | |
9 | 1.08 | DCS, PLC modules and servers cleaning works:GT ABB DCS, STG Siemens DCS, DM Plant Modicon PLC modules, Woodward Governing, TSI system, FIM cleaning and terminal tightness checking work | 120 | Nos | |
10 | 1.09 | DCS, PLC modules and servers cleaning works: Other PLC in IA/PA, IP/LP Injection, ETS, N2 system, etc. module cleaning & terminal tightness checking work | 50 | Nos | |
11 | 1.1 | DCS, PLC modules and servers cleaning works: :GT, STG, DM plant OWS and EWS & Server system cleaning work | 15 | system | |
12 | 1.11 | GTG & STG start-up: GTG & STG Startup activities | 30 | startup | |
13 | 1.12 | Break down maintenance / Replacement / Releasing and Re-fixing of field instruments:Replacement/Releasing and re-fixing of pressure/temperature/flow/level transmitters & switches and other field instruments etc. for defect and mechanical co-ordination work | 80 | Instrument | |
14 | 1.13 | Break down maintenance / Replacement / Releasing and Re-fixing of field instruments:Replacement/Releasing and re-fixing of field instruments such as gauges, RTD, Thermocouple, manifolds and impulse line except turbine area. | 50 | Instrument | |
15 | 1.14 | Break down maintenance / Replacement / Releasing and Re-fixing of field instruments: Replacement/Releasing and re-fixing of ON/OFF valves/Actuators, Limit switches, Pilot actuators, Air regulators, O-ring and gaskets etc. for defect and mechanical co-ordination | 50 | Instrument | |
16 | 1.15 | Break down maintenance / Replacement / Releasing and Re-fixing of field instruments: Replacement/Releasing and re-fixing of Pneumatic control valve's positioner, position transmitter, airlock relay, volume booster, limit switches, vibration sensors, speed sensors, thermocouples/RTDs and special type of instruments in Gas and steam turbine area for defect and other Mechanical co-ordination work | 80 | Nos | |
17 | 1.16 | Break down maintenance / Replacement / Releasing and Re-fixing of field instruments:Assistantship in DCS control loop checking of signals and cable healthiness checking, spare cable tracing etc. and Electrical co-ordination work | 120 | Instrument | |
18 | 1.17 | Break down maintenance / Replacement / Releasing and Re-fixing of field instruments: Replacement/healthiness checking of ABB Symphony harmony/Siemens DCS, Modicon PLC, Woodward Governing system modules & other PLC cards and FIM replacement etc | 50 | Instrument | |
19 | 1.18 | Break down maintenance / Replacement / Releasing and Re-fixing of field instruments:Functional checking of pressure/ temperature transmitters/switches /RTD/ Thermocouple/flame scanner, Transducers etc. with DCS and operational checking of ON/OFF solenoid valves and limit switches Pneumatic control valves. | 90 | Instrument | |
20 | 1.19 | Break down maintenance / Replacement / Releasing and Re-fixing of field instruments: Assistantship in check measurement of new materials | 15 | nos |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail