Kerala State Electricity Board-KSEB has published Construction Of Thottiyar Hep ( 1X30mw And 1X10mw Erection Testing And Commissioning Of Electromechanical Equipment Construction Of Thottiyar Hep 1X30mw And 1X10mw Erection Testing And Commissioning Of Electromechanical Equipment In Power House. Submission Date for this Tender is 20-03-2020. Electrical Products Tenders in Adimali panchayat Kerala. Bidders can get complete Tender details and download the document.
Name of Work:Construction of Thottiyar HEP(1x30MW+1x10MW)-Erection,testing and commissioning of Electro Mechanical Equipment | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Schedule A-Service(Erection,testing and commissioning) | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | Erection and commissioning of Excitation transformer and giving connection | 2 | Set | |
3 | 1.02 | Erection, testing and commissioning of Brake Jack panel | 2 | Set | |
4 | 1.03 | Erection, testing and commissioning of Brake Dust extraction system | 2 | Set | |
5 | 1.04 | Erection,testing and commissioning of Carbon Dust extraction system | 2 | Set | |
6 | 1.05 | erection and commissioning of Oil vapour extraction system | 2 | set | |
7 | 1.06 | Erection and commissioning of IPBD system from generator to generator transformer and tappings to Excitation Transformer, Auxiliary Transformer, LAVT, NGT, NGR, fitting necessary CTs for protection and measurement & provision for partial discharge measurement, earthings complete etc. | 1 | nos | |
8 | 1.07 | Erection and commissioning of SPBD system from generator to generator transformer and tappings to Excitation Transformer, Auxiliary Transformer, LAVT, NGT, NGR, fitting necessary CTs for protection and measurement & provision for partial discharge measurement, earthings complete etc. | 1 | nos | |
9 | 1.08 | Erection and commissioning of indoor dry type cast resin 630 KVA auxillary transformer including cabling, erection of allied structures, provide earthings etc. | 2 | nos | |
10 | 1.09 | Erection and commissioning 1No. of outdoor type 630 KVA Station Service transformer & 11kv sustation including 11kv LA and Outdoor protection cubicle (RMU/Load break switch) with protection and metering,cabling, erection of allied structures, provide earthings etc. | 1 | nos | |
11 | 1.1 | Erection and commissioning of DG set of 250 KVA for ensuring emergency supply at power house including erection of generator protection panel, laying of cables, providing sufficient no. of earthings, etc. | 1 | nos | |
12 | 1.11 | Erection and commissioning of 1 No. LTAC common panel with 5 nos incomers including Automatic interchaging facility, with adequate spares feeders, copper cables, earthings etc. complete including o/c and EF protection on incomers, suitable MCCB on feeders including providing sufficient earthing and remote control facility at control room including cabling upto auxiliary panels and equipment and light distribution panel. | 1 | nos | |
13 | 1.12 | Fabfication and fixing of cable tray supports and erection of cable trays inside the entire power house as per the direction of departmental officers at site | 1 | LS | |
14 | 1.13 | Erection and commissioning of 110 V DC panels with sufficent No of outlets, with DC1 & DC2 philosophy and bus coupler | 1 | Set | |
15 | 1.14 | Erection and commissioning of 2 sets of 110 V DC Plante type Battery bank along with redundant Battery charger of adequate capacity, cables, earthing, protection metering etc. complete.The scope also includes laying of cables, providing earthing etc. | 1 | Set | |
16 | 1.15 | Erection and commissioning of UPS System (1+1 standby), 5kVA(minimum) 240VAC, Single phase, 50Hz with a common plante / tubular battery set including cabling, earthing, battery etc. | 1 | Set | |
17 | 1.16 | Erection and commissioning of control panels, cables, testing of rope, earthing etc. complete including refurbishment of all items already supplied and erected with EOT (100/25T). | 1 | set | |
18 | 1.17 | Erection and commissioning of stator space heater of 30MW&10MW units complete | 2 | set | |
19 | 1.18 | Refurbishment of sound proof access door as per design and drawings and painting | 2 | Set | |
20 | 1.19 | Charges for removing and stacking of all balance items including scrap from site as per the direction of department officer in charge. | 1 | Lot | |
21 | 1.2 | Charges for transportation of already supplied equipments stored and stacked at various stores related to the project to the work site. | 1 | Lot | |
22 | 1.21 | Erection, testing and commisioning of 30MW Turbine including fitting of Turbine bearing housing, foundation bolts, sole plates, nozzle assembly, runner removal assembly, bearing coolers, top cover, accessories like coolers, temperature detection devices, level indicator, welding and erection of distributor pipes including pressure testing, alignment etc. on the pedestals as per erection procedure complete with supplied items after refurbishment of required items as per standard procedure, complete including erection of runner and cooling water piping. | 1 | Set | |
23 | 1.22 | Erection, testing and commisioning of 10MW Turbine including fitting of Turbine bearing housing, foundation bolts, sole plates, nozzle assembly, runner removal assembly, bearing coolers, top cover, accessories like coolers, temperature detection devices, level indicator, welding and erection of distributor pipes including pressure testing, alignment etc. on the pedestals as per erection procedure complete with supplied items after refurbishment of required items as per standard procedure, complete including erection of runner and cooling water piping. | 1 | Set | |
24 | 1.23 | Erection testing and commissioning of cooling water system with already supplied items after refurbishment of required items including cabling, erectionof panels, pumps (3 Nos.), strainers and pipes inside the power house etc. complete. | 1 | Set | |
25 | 1.24 | Erection, testing, and commissioning of cooling water pipe line to cooling water tank at an elevationof 95m (approximate) on the penstock route. (The work includes connecting the output of the standby pump to the top of the cooling water tank and return pipe to the cooling water line of the machines including fixing drain valve) | 1 | set | |
26 | 1.25 | Erection and functionality testing of MIV for 30MW unit with all accessories with already supplied items including refurbishment, matching of inlet/outlet pipes and welding with penstock. | 1 | Set | |
27 | 1.26 | Erection and functionality testing of MIV for 10MW unit with all accessories with already supplied items including refurbishment, matching of inlet/outlet pipes and welding with penstock. | 1 | Set | |
28 | 1.27 | Erection Testing and commissioning of 30 MW Generator with foundation bolts, jacks, upper&lower brackets, thrust and guide bearings, shaft couplings . Fixing required water and oil pipings and all other accessories complete as per standards including refurbishment of already supplied items | 1 | set | |
29 | 1.28 | Erection Testing and commissioning of 10 MW Generator with foundation bolts, jacks, upper&lower brackets, thrust and guide bearings, shaft couplings . Fixing required water and oil pipings and all other accessories complete as per standards including refurbishment of already supplied items | 1 | set | |
30 | 1.29 | Erection testing and commissioning of oil handling system using supplied items complete including refurbishment and oil leakage system. | 2 | Set | |
31 | 1.3 | Erection testing and commissioning of compressed air system using supplied items including refurbishment of air tank and pipelines. | 1 | Set | |
32 | 1.31 | Erection testing and commissioning of LAVT &NGT cubicles | 2 | set | |
33 | 1.32 | Painting of all equipment and pipes with appropriate paint 2 coat after scraping and applying zinc chromate primer. | 1 | Lot | |
34 | 1.33 | Erection testing and commissioning of drainage and dewatering system as per design, drawings and standards including erection of drainage and dewatering pumps, cabling, panel erection etc. | 1 | set | |
35 | 1.34 | Overload test including arranging loads for test | 1 | Lot | |
36 | 1.35 | Erection testing and commissioning of Mechanical over speed devices including all accessories. | 2 | nos | |
37 | 1.36 | Erection of all embeded pipings other than that mentioned in above itemswith clamps, flanges, valves etc including painting with two coats of epoxy paint over one coat epoxy primer | 1 | Lot | |
38 | 1.37 | Alignment of generator-turbine units including levelling, centring and balancing completely so as to bring all parameters like temperature, vibration etc. within the permissinble limit | 2 | set | |
39 | 1.38 | Supervision charges for respective OEMs for Erection testing and commissioning of the items supplied by original contractor, including charges for Visa and insurance, Flight, Accommodation, food etc . for two engineers, if required. | 60 | day |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy