| 1 | 1 | Control Center (CC) Non-ICT Infrastructure | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | Interior works for CC including conference room | BI01010001010000000000000515BI0100001113 | 8000 | Sq.ft |
|---|
| 3 | 2 | Control Center (CC) ICT Components | | | |
|---|
| 4 | 2.01 | DLP Video wall | | 1 | Lot |
|---|
| 5 | 2.02 | Video wall controller + decoder | | 1 | Nos |
|---|
| 6 | 2.03 | 75'' LCD Touch screen TV for conference room with Video Conference facility | | 5 | Nos |
|---|
| 7 | 2.04 | High-end 27\" x 2 Nos. Display Desktop with necessary graphics card for Live viewing and Playback | | 30 | Nos |
|---|
| 8 | 2.05 | Network MFD Colour Laser Printers | | 2 | Nos |
|---|
| 9 | 2.06 | IP based Video Phones with PoE Switch | | 30 | Nos |
|---|
| 10 | 2.07 | Indoor Fixed Dome Cameras for internal surveillance with storage | | 10 | Nos |
|---|
| 11 | 2.08 | Set of Switches L3 to connect Workstations + Desktops | | 3 | Set |
|---|
| 12 | 2.09 | Networking/IT Rack | | 2 | Lot |
|---|
| 13 | 2.1 | Wi-Fi & wired Networking Cost (Passive Components) | | 1 | Lot |
|---|
| 14 | 2.11 | Electrical Cabling & Necessary Illumination Devices | | 1 | Lot |
|---|
| 15 | 2.12 | Public Address System | | 1 | Set |
|---|
| 16 | 2.13 | Access Control System (3 level including FR as one layer) | | 2 | Set |
|---|
| 17 | 2.14 | Digital Calling VoIP & EPABX including 2 - PRI | | 1 | Nos |
|---|
| 18 | 2.15 | Online UPS 100 KVA | | 1 | Nos |
|---|
| 19 | 2.16 | Firewall for CC Site | | 2 | Nos |
|---|
| 20 | 3 | CCTV Monitoring Systems in JCP Office | | | |
|---|
| 21 | 3.01 | High-end 27\" x 2Nos Display Desktop with necessary graphics card for Live viewing and Playback | | 6 | Nos |
|---|
| 22 | 3.02 | UPS with Batteries (Type - I) | | 6 | Nos |
|---|
| 23 | 3.03 | Set of 8 Port POE Switches | | 6 | Set |
|---|
| 24 | 3.04 | Accessories as per requirement (6U rack, power and network cables, computer table-1, plastic chair -1, 8GB Pen drive, etc.) | | 6 | Lot |
|---|
| 25 | 4 | CCTV Monitoring Systems in DCP Office | | | |
|---|
| 26 | 4.01 | High-end 27\" x 2Nos. Display Desktop with necessary graphics card for Live viewing and Playback | | 16 | Nos |
|---|
| 27 | 4.02 | UPS with Batteries (Type - I) | | 16 | Nos |
|---|
| 28 | 4.03 | Set of 8 Port POE Switches | | 16 | Set |
|---|
| 29 | 4.04 | Accessories as per requirement (6U rack, power and network cables, computer table-1, plastic chair -1, 8GB Pen drive, etc.) | | 16 | Lot |
|---|
| 30 | 5 | CCTV Surveillance for Women Safety in Chennai | | | |
|---|
| 31 | 5.01 | Outdoor Cameras (remote Analytics & Surveillance) - Type A Cameras with storage facility + 128 GB Memory Card | | 3000 | Nos |
|---|
| 32 | 5.02 | Outdoor Cameras - Type B Cameras with storage facility + 128 GB Memory Card | | 4000 | Nos |
|---|
| 33 | 5.03 | Poles for Cameras and Equipment | | 2335 | Nos |
|---|
| 34 | 5.04 | Network Video Recorder + 4 TB Hard Disk + 4G Wi-Fi router (for Type B cameras) | | 1335 | Nos |
|---|
| 35 | 5.05 | Provisioning of Electrical Power | | 2335 | Lot |
|---|
| 36 | 5.06 | Outdoor PoE Switches 8 Ports | | 2335 | Nos |
|---|
| 37 | 5.07 | Networking Cost (Passive Component: Junction Box, Patch Panel, LIU, OFC, Cat6 Cable, Patch Cords, Earthing, Lighting arrester, and other required accessories) | | 2335 | Lot |
|---|
| 38 | 5.08 | UPS with Batteries (Type - II) | | 2335 | Nos |
|---|
| 39 | 5.09 | Digging, Piping & Re-filling, including digging for electrical cabling | | 2335 | Lot |
|---|
| 40 | 6 | Software | | | |
|---|
| 41 | 6.01 | Video Management System + AI based video analytics (for 7000 cameras) | | 1 | LS |
|---|
| 42 | 6.02 | Application Software (incl. EMS, BMS, etc.) | | 1 | LS |
|---|
| 43 | 7 | Training and Overall Project Management | | | |
|---|
| 44 | 7.01 | Functional Training (Batches of 20) | | 270 | LS |
|---|
| 45 | 7.02 | Security Audit Charges | | 10 | Lot |
|---|
| 46 | 8 | Laying & commissioning of Fibre network for Internet cable Bandwidth | | | |
|---|
| 47 | 8.01 | One Time Implementation & laying charges (UPS, Battery, Switch, RoW Charges, etc.) | | 1 | Lot |
|---|
| 48 | 9 | Smart Data Center (Near DC Infrastructure) | | | |
|---|
| 49 | 9.01 | Compute Infra | | 1 | Lot |
|---|
| 50 | 9.02 | Storage | | 500 | TB |
|---|
| 51 | 9.03 | Network & Field Devices Monitoring Tool | | 1 | LS |
|---|
| 52 | 9.04 | Security enablement for DC & Field Infrastructure | | 1 | LS |
|---|
| 53 | 9.05 | DC Indoor Surveillance Camera | | 4 | Nos |
|---|
| 54 | 9.06 | Networking / IT Rack | | 1 | Lot |
|---|
| 55 | 9.07 | Wi-Fi & wired Networking Cost (Passive Components) | | 1 | Lot |
|---|
| 56 | 9.08 | Electrical Cabling & Necessary Illumination Devices | | 1 | Lot |
|---|
| 57 | 9.09 | Access Control System (3 level including FR as one layer) | | 1 | Set |
|---|
| 58 | 9.1 | VoIP Phone inside Server Room /DC | | 1 | Nos |
|---|
| 59 | 10 | Additional Infrastructure / Services | | | |
|---|
| 60 | 10.01 | Any additional infrastructure / services required | | 1 | LS |
|---|
| 61 | 10.02 | Additional infrastructure / services proposed as value propositions (if any)… | | 1 | LS |
|---|