NAME OF WORK : OUTSOURCING OF SERVICES FOR OPERATION OF CERTAIN AC PLANTS IN TECH AREA AT AF STN MAHARAJPUR
Sl.No.
Item Description
Item Code / Make
Quantity
Units
1
1
Outsourcing of Services for operation of central AC plants and DG sets round the clock using one operator in each shift (i.e. 24 Hours in three shifts each shift of 8 hours) with the operation of following plants / equipments at ESH and MMPU, AF Stn Maharajpur complete all as specified and directed :-\n(a) Central AC Plant Air cooled chiller 2x33 TR at ESH building, \n(b) Central AC Plant Air cooled chiller 2x54 TR at 24 MMPU (MICA) building, \n(c) DG set 250 KVA at ESH building \n(d) DG Set 320 KVA DG set at 24 MMPU (MICA) building
335
Per Day
2
2
Outsourcing of Services for operation of central AC plant and DG Installation round the clock using one operator in each shift (i.e. 24 Hours in three shifts each shift of 8 hours) with with the operation of following plants / equipments at at 26 MMPU, AF Stn Maharajpur complete all as specified and directed :-\n(A) Central AC Plant DX type of Capacity 2 x 35 TR Working and 01 x 35 TR Standby :-\n(i) 35 TR capacity condensing unit complete comprising of compressor with electric induction motor & condensor -03 set \n(ii) Condenser water circulating pump with electric motor - 02 Sets \n(iii) FRP induced draft cooling tower of 100% capacity - 01 Set \n(iv) Air Handling unit complete of 12000 CFM and 8000 CFM capacity electric blower motor - 02 Nos\n(v) Humidification pump complete driven by electric motor- 01 No\n(vi) LT Control planel comprising starters of all connected equipments of AC plants - 01 Set\n(vii) DG Set of 160 KVA capacity
335
Per Day
3
3
Outsourcing of Services for operation of central AC plants, DG Installation and water supply installation round the clock using one operator in each shift (i.e. 24 Hours in three shifts each shift of 8 hours) with following plants / equipments at Bumb Dump, AF Stn Maharajpur complete all as specified and directed:\n(a) Central AC Plant Chilled water Type of Capacity 2 x 26 TR Working and 01 x 26 TR stand by at Bomb Dump \n(i) 26 TR capacity chiller unit complete comprising of Scroll compressors with Condensors etc., and incl LT Panel with Starters - 3 Sets.\n(ii) Condenser water circulating Monoblock pump with electric motor Capacity 7.5 HP - 02 Sets\n(iii) Chilled water circulating Monoblock pump with electric motor Capacity 7.5 HP - 02 Sets \n(iv) FRP induced draft cooling tower of 80 TR capacity - 01 Set \n(v) Air Handling unit complete of 6000 CFM capacity electric blower motor – 02 Nos.\n(vi) Humidification pump complete driven by electric motor & starter- 02 Nos . \n(Vii) LT Control planel comprising starters of all connected equipments of AC plants - 01 Set\n(viii) Standby DG Set of 125 KVA capacity including connected control panels – 01 Set\n(ix) Operating of submersible pump set 17.5 HP including opening/closing of sluice valve in front of bomb dump gate water supply installation.\n(x) ON/OFF of street light control panel installed in front of bomb dump gate.
335
Per Day
4
4
Outsourcing of Services for operation of Central AC Plant and DG Set Installation round the clock using one operator in each shift (i.e. 24 Hours in three shifts each shift of 8 hours) with comprising of following plants / equipments at Tech Flt, AF Stn Maharajpur complete all as specified and directed:-\n Central AC Plant Chiller type of Capacity 2 x 75 TR working and 01 x 75 TR Standby at Tech FLT :-\n(a) (i) 75 TR capacity chiller unit complete comprising of scroll compressors with Air cooled condensors etc including LT panel with starters- 3 Sets. (ii) Chilled water circulating monoblock Pump with electric motor 7.5 HP-03 Nos.\n(iii) Hot water genertor 170 KW-01 No.(iv) Hot water pump set 5 HP-02 Nos.\n(v) Air handling unit 17500 CFM-03 Nos.(vi) LT control panel comprising of starters of all connected equipments-04 Nos \n(b) DG Set 500 KVA with AMF panel & LT panel - 1set\n(c) Bore well with submersible pump set 15 HP with control panel and Sluice valves – 1 set\n(d) ON/OFF of street lights Note for Item No 1 to 4 :-\n(i) Payment shall be made as per minimum labour wages fixed by State Govt/ Central Govt whichever is higher.\n(ii) The quoted rate of bidder shall not be less than minimum fair wages fixed by State Govt/ Central Govt including GST, LWC &n ESIC in any case otherwise such bid shall be rejected and shall not be considered for acceptance.\n(iii) Contractor shall maintain adequate temperature and relative humidity as per design parameter of each AC Plant.\n(iv) Cleaning of complete AC plant, Pre metallic filters, cooling towers & surrounding area is also contractor`s responsibility.\n(v) Checking of electric connections of all components, refrigerant gas leakage, rectification and recharge of refrigerant gas, checking of complete AC plant & checking of LP, HP & Oil pressure.\n
335
Per Day
5
4.01
(vi) Replacement of minor parts such as Flair nuts, LT cable joints with suitable size lugs are contractor’s responsibility.\n(vii) All operator should have 03 years experience or shall be ITI trained.\n(viii) Fuel, refrigerant gas and lubricants shall be issued by the department from AGE E/M (AF) Tech Area store yard under Schedule ‘B’ free for filling at Maharajpur and it will be the contractors responsibilities for filling of oil / lubricant in to fuel tank of DG sets all as specified & directed.\n(ix) Empty containers shall be returned by the contractor to the MES store at Maharajpur. \n(x) All operator will wear proper uniform as approved by GE \n(xii) Contractor will employ additional employ for rest/leave period.\n(xiii) For panel recovery on account of non-operation of installation/absent of operators from duty etc respective clause of particular specifications shall be applicable. \n(xiv) Proper handing / taking over of operator to be done and operator should not leave the plant till arrival of next operator.\n(xv) Stationery for maintenance of installation record shall be contractors responsibility (Daily Log Sheet, Attendance register, Wages Register, \n(xvi) Insurance of all operator shall be contractors responsibility. Deptt will not be responsible for any accident. \n(xviii) Contractor submitt the nominal roll of persons to be employed alongwith qualification/experience certificates, Police verification identification certificate to Engineer-in-Charge before employed the staff.\n(xviii) The contractor shall operate the DG sets and connected panels for proper functioning of AC Plant at the time of power failure and to maintain the system functional as per users requirements.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.