Orissa Industrial Infrastructure Development Corporation-IDCO has published Power Supply To Different Machines & Equipment’S Of The Following Laboratories Of The G.P Ragadi In The District Jajpur.(The Bidders Are Required To Quote Their Rates Excluding Of Goods & Service Tax (Gst). Gst As Applicable Will Be Paid Extra. The Existi. Submission Date for this Tender is 19-02-2020. Bolts Tenders in GOVT POLYTECHNIC, RAGADI, DIST-JAJPUR Odisha. Bidders can get complete Tender details and download the document.
Name of Work: Power Supply to different Machines & Equipment’s of the following laboratories of the G.P Ragadi in the district Jajpur. (The bidders are required to Quote their rates excluding of Goods & Service Tax (GST). GST as applicable will be paid extra. The existing rule of Govt. and any amendment made in future will be followed) | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Mineral Processing Laboratory at Academic Building (2nd floor) | BI01010001010000000000000515BI0100001113 | ||
2 | 2 | Supply delivery fixing and testing of the Metra Plug & Socket DB box (Three-Phase) with 32 amps T.P MCB for 01 no of Machine. | BI01010001010000000000000515BI0100001114 | 11 | No |
3 | 3 | Supply delivery laying termination and testing of following sizes of Cable on the wall of the building with proper saddling etc from BDB to 10 no Machines. | BI01010001010000000000000515BI0100001115 | ||
4 | 4 | 4 core x 10 sq mm Al. Ar PVC Cable from D.B to 01no three phase Machine. | BI01010001010000000000000515BI0100001116 | 220 | Mtr |
5 | 5 | 3.5 core x 35 sq mm Al. Ar PVC Cable from existing MDB at electrical control room to DB inside the laboratory. | BI01010001010000000000000515BI0100001117 | 140 | Mtr |
6 | 6 | End termination of following Al. Ar PVC Cable for above equipments as per the site requirements. | BI01010001010000000000000515BI0100001118 | ||
7 | 7 | 4core x 10 sq mm Al. Ar PVC Cable | BI01010001010000000000000515BI0100001119 | 11 | No |
8 | 8 | 3.5 core x 35 sq mm al. Ar PVC cable | BI01010001010000000000000515BI0100001120 | 2 | No. |
9 | 9 | Supply delivery laying with properly saddling with cable on the wall of 12 swg G.I wire and connection with using copper lugs to each Machines . | BI01010001010000000000000515BI0100001121 | 250 | Mtr |
10 | 10 | Distribution Board(D.B)\nSupply delivery installation testing and commissioning of L.T. Indoor wall mounted type distribution boards made out of 1.6 mm thick CR sheet metal cubicle acid treated for de-rusting powder coated of approved shade, having tamper proof locking and sealing arrangements provision for cable/conduit entry, earthling studs as per specification mentioned below duly factory wired conforming to the relevant ISS and complete with all arrangements \nI/C: 100A F.P,25 ka, MCCB with ROM & S.L-01 set\n(Vide Type-DNO-100C, Cat no-CM91612OOKOOG of L&T makes),\n25 x 5 mm Copper bus-bar – 04 nos\nDMC Insulator as bus-bar support\nMultifunctional mete- 01 no,100 / 5 A CT – 3no\n 3-phase indicating lamps with fuse -3no\nO / G:(i) 32 amps T.P MCB – 12no\n(10 ka of L&T makes) complete with factory wiring etc. | BI01010001010000000000000515BI0100001122 | 1 | Set |
11 | 11 | Supply delivery laying and connection to the D.B Box with copper lugs & soldering run from electrical Control room with Cable in cable trench and wall with saddling etc complete as per the site requirements.\n(i) 08 SWG G.I wire | BI01010001010000000000000515BI0100001123 | 200 | Mtr |
12 | 12 | Supply delivery fixing and testing of 09 litre capacity of Dry powder extinguisher constringes of welded MS cylindrical body with discharge valve, nozzle, CO2 cartridge and hanging arrangements with ISI marl of reputed company etc complete . | BI01010001010000000000000515BI0100001124 | 2 | No |
13 | 13 | Supply delivery and fixing of 08 mm thick of 2000mm length x 1000 mm wide electrical shock proof rubber mat of reputed make as per the site requirements. | BI01010001010000000000000515BI0100001125 | 1 | No |
14 | 14 | Supply delivery and fixing of shock treatment chart with glass framing and wall hanging both in Odiya, English and Hindi language etc as per the site requirements. | BI01010001010000000000000515BI0100001126 | 1 | No |
15 | 15 | Materials Testing Laboratory at the Academic Building | BI01010001010000000000000515BI0100001127 | ||
16 | 16 | Supply delivery fixing and testing of the Metra Plug & Socket DB box (Single-Phase) with 20 amps D.P MCB for 08 no of Machines as per the site requirements. | BI01010001010000000000000515BI0100001128 | 2 | No |
17 | 17 | Supply delivery fixing and testing of the Metra Plug & Socket DB box (Three-Phase) with 32 amps T.P MCB for 01 no of Machine as per the site requirements | BI01010001010000000000000515BI0100001129 | 6 | No |
18 | 18 | Supply delivery laying termination and testing of following sizes of Cable on the wall of the building with proper saddling etc from BDB to 10 no Machines as per the site requirements. | BI01010001010000000000000515BI0100001130 | ||
19 | 19 | 4 core x 10 sq mm Al. Ar PVC Cable from D.B to 01no three phase Machine. | BI01010001010000000000000515BI0100001131 | 180 | Mtr |
20 | 20 | 2 core x 10 sq mm Al. Ar PVC Cable from D.B to 08 no single phase Machines | BI01010001010000000000000515BI0100001132 | 32 | Mtr |
21 | 21 | 3.5 core x 35 sq mm Al. Ar PVC Cable from existing MDB at electrical control room to DB inside the laboratory. | BI01010001010000000000000515BI0100001133 | 140 | Mtr |
22 | 22 | End termination of following Al. Ar PVC Cable for above equipments as per the site requirements. | BI01010001010000000000000515BI0100001134 | ||
23 | 23 | 04core x 10 sq mm Al. Ar PVC Cable | BI01010001010000000000000515BI0100001135 | 12 | No |
24 | 24 | 2 core x 10 sq.mm Al .Ar PVC Cable | BI01010001010000000000000515BI0100001136 | 4 | No |
25 | 25 | 3.5 core x 35 sq mm al. Ar PVC cable | BI01010001010000000000000515BI0100001137 | 2 | No. |
26 | 26 | Supply delivery laying with properly saddling with cable on the wall of 12 swg G.I wire and connection with using copper lugs to each Machines as per the site requirements | BI01010001010000000000000515BI0100001138 | 200 | Mtr |
27 | 27 | Distribution Board(D.B)\nSupply delivery installation testing and commissioning of L.T. Indoor wall mounted type distribution boards made out of 1.6 mm thick CR sheet metal cubicle acid treated for de-rusting powder coated of approved shade, having tamper proof locking and sealing arrangements provision for cable/conduit entry, earthling studs as per specification mentioned below duly factory wired conforming to the relevant ISS and complete with all arrangements \nI/C: 100A F.P,25 ka, MCCB with ROM & S.L- 01 set\n(Vide Type-DNO-100C, Cat no-CM91612OOKOOG of L&T makes), 25 x 5 mm Copper bus-bar – 04 nos\nDMC Insulator as bus-bar support\nMultifunctional meter-01 no,100 / 5 A CT- 3no\n 3-phase indicating lamps with fuse -3no\nO / G: (i)32 amps D.P MCB – 16 no(10 ka of L&T makes) (ii)32 amps T.P MCB – 02no(10 ka of L&T makes) | BI01010001010000000000000515BI0100001139 | 1 | Set |
28 | 28 | Supply delivery laying and connection to the D.B Box with copper lugs & soldering run from electrical Control room with Cable in cable trench and wall with saddling etc complete as per the site requirements.\n08 SWG G.I wire | BI01010001010000000000000515BI0100001140 | 160 | Mtr |
29 | 29 | Supply delivery fixing and testing of 09 liter capacity of Dry powder extinguisher constringes of welded MS cylindrical body with discharge valve, nozzle, CO2 cartridge and hanging arrangements with ISI marl of reputed company etc complete. | BI01010001010000000000000515BI0100001141 | 2 | No |
30 | 30 | Supply delivery and fixing of 08 mm thick of 2000mm length x 1000 mm wide electrical shock proof rubber mat of reputed make as per the site requirements. | BI01010001010000000000000515BI0100001142 | 1 | No |
31 | 31 | Supply delivery and fixing of shock treatment chart with glass framing and wall hanging both in Odiya, English and Hindi language etc as per the site requirements. | BI01010001010000000000000515BI0100001143 | 1 | No |
32 | 32 | Foundry Engineering Laboratory at Academic Building (G.F) | BI01010001010000000000000515BI0100001144 | ||
33 | 33 | Supply delivery fixing and testing of the Metra Plug & Socket DB box (Single-Phase) with 20A DP MCB for 08 no of Machines. | BI01010001010000000000000515BI0100001145 | 8 | No |
34 | 34 | Supply delivery fixing and testing of the Metra Plug & Socket DB box (Three-Phase) with 32 amps T.P MCB for 01 no of Machine. | BI01010001010000000000000515BI0100001146 | 3 | No |
35 | 35 | Supply delivery laying termination and testing of following sizes of Cable on the wall of the building with proper saddling etc from BDB to 10 no Machines. | BI01010001010000000000000515BI0100001147 | ||
36 | 36 | 4 core x 10 sq mm Al. Ar PVC Cable from D.B to 01no three phase Machine. | BI01010001010000000000000515BI0100001148 | 60 | Mtr |
37 | 37 | 2 core x 10 sq mm Al. Ar PVC Cable from D.B to 08 no single phase Machines | BI01010001010000000000000515BI0100001149 | 160 | Mtr |
38 | 38 | 3.5 core x 35 sq mm Al. Ar PVC Cable from existing MDB at electrical control room to DB inside the laboratory. | BI01010001010000000000000515BI0100001150 | 75 | Mtr |
39 | 39 | End termination of following Al. Ar PVC Cable for above equipments as per the site requirements. | BI01010001010000000000000515BI0100001151 | ||
40 | 40 | 0 4core x 10 sq mm Al. Ar PVC Cable | BI01010001010000000000000515BI0100001152 | 6 | No |
41 | 41 | 2 core x 10 sq.mm Al .Ar PVC Cable | BI01010001010000000000000515BI0100001153 | 16 | No |
42 | 42 | 3.5 core x 35 sq mm al. Ar PVC cable | BI01010001010000000000000515BI0100001154 | 2 | No |
43 | 43 | Supply delivery laying with properly saddling with cable on the wall of 12 swg G.I wire and connection with using copper lugs to each Machines. | BI01010001010000000000000515BI0100001155 | 200 | Mtr |
44 | 44 | Distribution Board (D.B)\nSupply delivery installation testing and commissioning of L.T. Indoor wall mounted type distribution boards made out of 1.6 mm thick CR sheet metal cubicle acid treated for de-rusting powder coated of approved shade, having tamper proof locking and sealing arrangements provision for cable/conduit entry, earthling studs as per specification mentioned below duly factory wired conforming to the relevant ISS and complete with all arrangements:\nI/C: 100A F.P,25 ka, MCCB with ROM & S.L :- 01 set\n(Vide Type-DNO-100C, Cat no-CM91612OOKOOG of L&T makes),25 x 5 mm Copper bus-bar – 04 nos\nDMC Insulator as bus-bar support\nMultifunctional meter- 01 no,100/5 A CT – 3no\n 3-phase indicating lamps with fuse -3no\nO / G: (i) 32 A D.P MCB – 20 no(10 ka of L&T makes) (ii)32 amps T.P MCB – 02no\n(10 ka of L&T makes) Complete with factory wiring etc. | BI01010001010000000000000515BI0100001156 | 1 | Set |
45 | 45 | Supply delivery laying and connection to the D.B Box with copper lugs & soldering run from electrical Control room with Cable in cable trench and wall with saddling etc complete as per the site requirements.\n(i)08 SWG G.I wire | BI01010001010000000000000515BI0100001157 | 150 | Mtr |
46 | 46 | Supply delivery fixing and testing of 09 liter capacity of Dry powder extinguisher constringes of welded MS cylindrical body with discharge valve, nozzle, CO2 cartridge and hanging arrangements with ISI marl of reputed company etc complete. | BI01010001010000000000000515BI0100001158 | 2 | No |
47 | 47 | Supply delivery and fixing of 08 mm thick of 2000mm length x 1000 mm wide electrical shock proof rubber mat of reputed make as per the site requirements. | BI01010001010000000000000515BI0100001159 | 1 | No |
48 | 48 | Supply delivery and fixing of shock treatment chart with glass framing and wall hanging both in Odiya, English and Hindi language etc as per the site requirements. | BI01010001010000000000000515BI0100001160 | 1 | No |
49 | 49 | Heat Treatment Laboratory at Academic Building (2nd Floor) | BI01010001010000000000000515BI0100001161 | ||
50 | 50 | Supply delivery fixing and testing of the Metra Plug & Socket DB box (Single-Phase) with 20 amps D.P MCB for 08 no of Machines complete. | BI01010001010000000000000515BI0100001162 | 5 | No |
51 | 51 | Supply delivery fixing and testing of the Metra Plug & Socket DB box (Three-Phase) with 32 amps T.P MCB for 01 no of Machine complete. | BI01010001010000000000000515BI0100001163 | 8 | No |
52 | 52 | Supply delivery laying termination and testing of following sizes of Cable on the wall of the building with proper saddling etc from BDB to 10 no Machines. | BI01010001010000000000000515BI0100001164 | ||
53 | 53 | 4 core x 10 sq mm Al. Ar PVC Cable from D.B to 01no three phase Machine. | BI01010001010000000000000515BI0100001165 | 160 | Mtr |
54 | 54 | 2 core x 10 sq mm Al. Ar PVC Cable from D.B to 08 no single phase Machines | BI01010001010000000000000515BI0100001166 | 100 | Mtr |
55 | 55 | 3.5 core x 35 sq mm Al. Ar PVC Cable from existing MDB at electrical control room to DB inside the laboratory. | BI01010001010000000000000515BI0100001167 | 190 | Mtr |
56 | 56 | End termination of following Al. Ar PVC Cable for above equipments as per the site requirements. | BI01010001010000000000000515BI0100001168 | ||
57 | 57 | 0 4core x 10 sq mm Al. Ar PVC Cable | BI01010001010000000000000515BI0100001169 | 16 | No |
58 | 58 | 2 core x 10 sq.mm Al .Ar PVC Cable | BI01010001010000000000000515BI0100001170 | 10 | No |
59 | 59 | 3.5 core x 35 sq mm al. Ar PVC cable | BI01010001010000000000000515BI0100001171 | 2 | No |
60 | 60 | Supply delivery laying with properly saddling with cable on the wall of 12 swg G.I wire and connection with using copper lugs to each Machines. | BI01010001010000000000000515BI0100001172 | 200 | Mtr |
61 | 61 | Distribution Board(D.B)\nSupply delivery installation testing and commissioning of L.T. Indoor wall mounted type distribution boards made out of 1.6 mm thick CR sheet metal cubicle acid treated for de-rusting powder coated of approved shade, having tamper proof locking and sealing arrangements provision for cable/conduit entry, earthling studs as per specification mentioned below duly factory wired conforming to the relevant ISS and complete with all arrangements \nI/C: 100A F.P,25 ka, MCCB with ROM & S.L- 01 set\n25 x 5 mm Copper bus-bar – 04 nos\nDMC Insulator as bus-bar support\nMultifunctional meter- 01 no,100/ 5 A CT – 3no\n 3-phase indicating lamps with fuse -3no\nO / G:(i)32 amps D.P MCB – 12 no\n(ii)32A T.P MCB – 02no \n complete with factory wiring etc. | BI01010001010000000000000515BI0100001173 | 1 | Set |
62 | 62 | Supply delivery laying and connection to the D.B Box with copper lugs & soldering run from electrical Control room with Cable in cable trench and wall with saddling etc complete as per the site requirements. \n08 SWG G.I wire | BI01010001010000000000000515BI0100001174 | 180 | Mtr |
63 | 63 | Supply delivery fixing and testing of 09 liter capacity of Dry powder extinguisher constringes of welded MS cylindrical body with discharge valve, nozzle, CO2 cartridge and hanging arrangements with ISI marl of reputed company etc complete. | BI01010001010000000000000515BI0100001175 | 2 | No |
64 | 64 | Supply delivery and fixing of 08 mm thick of 2000mm length x 1000 mm wide electrical shock proof rubber mat of reputed make as per the site requirements. | BI01010001010000000000000515BI0100001176 | 1 | No. |
65 | 65 | Supply delivery and fixing of shock treatment chart with glass framing and wall hanging both in Odiya, English and Hindi language etc as per the site requirements. | BI01010001010000000000000515BI0100001177 | 1 | No |
66 | 66 | Electrical Machine-II Laboratory at Academic Building (G.F). | BI01010001010000000000000515BI0100001178 | ||
67 | 67 | Supply delivery fixing and testing of the Metra Plug & Socket DB box (Single-Phase) with 20 amps D.P MCB for 08 no of Machines. | BI01010001010000000000000515BI0100001179 | 3 | No |
68 | 68 | Supply delivery fixing and testing of the Metra Plug & Socket DB box (Three-Phase) with 32 amps T.P MCB for 01 no of Machine. | BI01010001010000000000000515BI0100001180 | 6 | No |
69 | 69 | Supply delivery laying termination and testing of following sizes of Cable on the wall of the building with proper saddling etc from BDB to 10 no Machines as per the site requirements. | BI01010001010000000000000515BI0100001181 | ||
70 | 70 | 4 core x 10 sq mm Al. Ar PVC Cable from D.B to 01no three phase Machine. | BI01010001010000000000000515BI0100001182 | 120 | Mtr |
71 | 71 | 2 core x 10 sq mm Al. Ar PVC Cable from D.B to 08 no single phase Machines | BI01010001010000000000000515BI0100001183 | 30 | Mtr |
72 | 72 | 3.5 core x 35 sq mm Al. Ar PVC Cable from existing MDB at electrical control room to DB inside the laboratory. | BI01010001010000000000000515BI0100001184 | 130 | Mtr |
73 | 73 | End termination of following Al. Ar PVC Cable for above equipments as per the site requirements. | BI01010001010000000000000515BI0100001185 | ||
74 | 74 | 0 4core x 10 sq mm Al. Ar PVC Cable | BI01010001010000000000000515BI0100001186 | 12 | No |
75 | 75 | 2 core x 10 sq.mm Al .Ar PVC Cable | BI01010001010000000000000515BI0100001187 | 6 | No |
76 | 76 | 3.5 core x 35 sq mm al. Ar PVC cable | BI01010001010000000000000515BI0100001188 | 2 | No |
77 | 77 | Supply delivery laying with properly saddling with cable on the wall of 12 swg G.I wire and connection with using copper lugs to each Machines. | BI01010001010000000000000515BI0100001189 | 250 | Mtr |
78 | 78 | Distribution Board(D.B)\nSupply delivery installation testing and commissioning of L.T. Indoor wall mounted type distribution boards made out of 1.6 mm thick CR sheet metal cubicle acid treated for de-rusting powder coated of approved shade, having tamper proof locking and sealing arrangements provision for cable/conduit entry, earthling studs as per specification mentioned below duly factory wired conforming to the relevant ISS and complete with all arrangements:-\nFor AC circuit\nI/C:200 amps F.P MCCB(36ka)DN-2,250D,L&T makes with ROM & Spreader links – 01 no\n0-500v digital Voltmeter-01 no\n3-phase indicating lamps with Pf -03no\nO/G: (i) 63 amps F.P MCB 10 ka- 03 no\n(ii) 32 amps T.P MCB, 10 ka – 03 no\n(iii) 32 amps D.P MCB,10 ka – 06 no\nOn indicating Lamps RED – 12 no,\nMFM with CTs – 01 no\nFor DC Circuit\nI/C: 100 A D.P MCCB L&T,DU100H – 01 no\n0-300v Voltmeter – 01 no, 0-60a ammeter – 01 no\n32 amps D.P MCB -09 no complete with factory wired. | BI01010001010000000000000515BI0100001190 | 1 | Set |
79 | 79 | Supply delivery laying and connection to the D.B Box with copper lugs & soldering run from electrical Control room with Cable in cable trench and wall with saddling etc complete of 08 SWG G.I wire | BI01010001010000000000000515BI0100001191 | 160 | Mtr. |
80 | 80 | Supply delivery fixing and testing of 09 liter capacity of Dry powder extinguisher constringes of welded MS cylindrical body with discharge valve, nozzle, CO2 cartridge and hanging arrangements with ISI marl of reputed company etc complete. | BI01010001010000000000000515BI0100001192 | 2 | No. |
81 | 81 | Supply delivery and fixing of 08 mm thick of 2000mm length x 1000 mm wide electrical shock proof rubber mat of reputed make as per the site requirements. | BI01010001010000000000000515BI0100001193 | 1 | No. |
82 | 82 | Supply delivery and fixing of shock treatment chart with glass framing and wall hanging both in Odiya, English and Hindi language etc as per the site requirements. | BI01010001010000000000000515BI0100001194 | 1 | No. |
83 | 83 | MDB for power supply to different Laboratory inside the Academic Block (G.F) | BI01010001010000000000000515BI0100001195 | ||
84 | 84 | MDB (Academic Building)\nSupply delivery installation testing and commissioning of L.T. Indoor wall mounted type distribution boards made out of 1.6 mm thick CR sheet metal cubicle acid treated for de-rusting powder coated of approved shade, having tamper proof locking and sealing arrangements provision for cable/conduit entry, earthling studs as per specification mentioned below duly factory wired conforming to the relevant ISS and complete with all arrangements \nI/C:200A F.P,36 ka, MCCB with ROM & S.L \n(VideType-DN2-250D, Cat no-CM92109OOP1OG of L&T makes)\n40 x 5 mm Copper bus-bar-04no\n 200 / 5 A CT – 3no \nDMC Insulator as bus-bar support\nMultifunctional meter – 01 no\n 3-phase indicating lamps with fuse -3no complete factory wiring with single core copper wire, copper lugs for connection etc. \nO/G: (i)100 A F.P MCCB 25 ka with ROM & S.L -05 no\n(ii) 32 amps T.P MCB – 02no | BI01010001010000000000000515BI0100001196 | 1 | Set |
85 | 85 | N.B: The bidders are required to Quote their rates excluding of Goods & Service Tax (GST). GST as applicable will be paid extra. The existing rule of Govt. and any amendment made in future will be followed. | BI01010001010000000000000515BI0100001197 |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy