}

Repair/Maintenance , Manning And Operation Of Central Ac Plant Chiller Type Under Ge E/M Base Hospital Delhi Cantt-10, GE E/M BASE HOSP DELHI CANTT-Delhi

Military Engineer Services-MES has published Repair/Maintenance , Manning And Operation Of Central Ac Plant Chiller Type Under Ge E/M Base Hospital Delhi Cantt-10. Submission Date for this Tender is 11-03-2020. HVAC Tenders in GE E/M BASE HOSP DELHI CANTT Delhi. Bidders can get complete Tender details and download the document.




Tender Notice

23544369
Corrigendum : Repair/Maintenance , Manning And Operation Of Central Ac Plant Chiller Type Under Ge E/M Base Hospital Delhi Cantt-10
Open Tender
Indian
Delhi
GE E/M BASE HOSP DELHI CANTT
11-03-2020

Tender Details

Repair/Maintenance , Manning And Operation Of Central air conditioner Plant Chiller Type Under Ge E/M Base Hospital Delhi Cantt-10

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 27-Feb-2020 EXTENSION OF DATE Date 06-03-2020
2 03-Mar-2020 EXTENSION OF BID SUBMISSION END DATE Date 11-03-2020

Key Value

Document Fees
INR 500 /-
EMD
INR 98800.0 /-
Tender Value
INR 49.40 Lakhs /-

BOQ Items

Name of Work: REPAIR/MAINT, MANNING AND OPERATION OF CENTRAL AC PLANT CHILLER TYPE UNDER GE E/M BASE HOSPITAL DELHI CANTT-10
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Manning and operation of central air conditioning plant of Main chillier of capacity 3X 75 TR round the clock in 03 shifts including Saturday, Sunday & Holidays with one operator in each shifts (03 Operator) for operation of compressor with motors, condenser and chillier with motor, AHU with motor,colling tower with motor , electric control panel including valves ,gauges as installed complete, and to maintain in side desire condition of temp 22 ± 2 degree C and humidity 50% ± 10% and carry out general cleanness , routine maintenance, attending all nature of breakdown/complaint ,Supply and maintaining log sheet with other connected documents complete all as specified and as directed. Shift timings :- Shift- I 0600 to 1400hrs, Shift-II 1400hrs to 2200hrs, Shift-III 2200 hrs to 0600hrs. 11 Per month
2 2 All as per item No 1 here in before but central AC plant of A1-A6 of cap 3X30 TR round the clock in three shifts including Saturday, Sunday & Holidays with one operator in each shift (Total 03 Operator) complete all as specified and as directed. 11 Per month
3 3 All as per item No 1 here in above but central AC Plant of Main OT of cap 3X60 TR round the clock in three shifts including Saturday, Sunday & Holidays with one operator in each shift (Total 03 Operator) complete all as specified and as directed. 11 Per month
4 4 Manning and operation of central AC plant of ICU cap 3X 40 TR round the clock in 03 shifts including Saturday, Sunday & Holidays with one operator in each shift (Total 03 Operator) for operation of compressor with motors, condenser, AHU with motor, culling tower with motor , electric control panel including valves ,gauges as installed complete, and to maintain in side desire condition of temp 22 ± 2 degree C and humidity 50% ± 10% and carry out general cleanness , routine maintenance attending all nature of complaint/breakdown, Supply and maintaining log sheet with other connected documents complete all as specified and as directed . Timings Shift - I 0600 to 1400hrs, Shift-II 1400hrs to 2200hrs Shift-III 2200 hrs to 0600hrs. 11 Per month
5 4.01 Note for item Nos 1 to 4 here-in-before :-\n(i) The estimated cost of the work in respect of BOQ Sir item Nos 1 to 4 (as based on minimum wages rates issued vide central/state) is Rs 36,60,000.00. If the quoted amount is found less than the estimated cost of Sir item Nos 1 to 4 of BOQ and tender of lowest bidder is considered for acceptance, then the lowest bidder shall have to deposit FDR in favour of Accepting officer for the difference in estimated cost and Accepted amount in respect of BOQ Sir item Nos 1 to 4 within 30 days from date of acceptance. In case the said FDR is not submitted within 30 days the amount in question shall be recovered from contractor’s first RAR/Final bill whichever is earlier. However the FDR/recovered amount shall be released to the contractor after satisfactory completion of work. \nAttention is further invited added that when the amount of said recovery mentioned herein above is less than the amount of performance security as indicated under Clause 02 on page 04 of CA and Clause 12 on page 11 of CA, no FDR is required to be submitted for quoting less rate against BOQ Srl Item No 01. However if the amount of performance security is less than the FDR to be submitted for less quoting rate, the difference of performance security amount and FDR amount(for less quoting rates) shall be deposited by the lowest bidder (whose tender is accepted) in the form of FDR for difference amount over and above performance security within 30 days from the date of Acceptance. \n(ii) One operator/technician shall perform only one shift of 08 hours in a day. If the same operator/technician found in other shift, a recovery of Rs 200/- per day shall be recovered from the contractor's dues. \n(iii) Contractor shall submit the nominal roll and qualification of operator/technician within 15 days of acceptance of tender. After that penalty for a sum of Rs 200/- per shift per installation shall be recovered from the contractor's dues. \n(iv) Contractor shall ensure attendance of all operator/technician in shift wise. If any operator/technician found absent from duty a sum of Rs 900/- per shift per person shall be recovered from the contractor's dues. Any damage of loss on this account shall bear by the contractor. 11 Per month
6 4.02 (v) All operator/technician shall wear proper uniform, failing which a recovery of Rs 1000/- per shift per person shall be recovered from the contractor's dues. (vi) The payment of contractor's employee shall be made through nationalized bank account of individual and the proof of transaction and the contractor shall submit the same with bank account pass book of individual within 15 days of acceptance otherwise a recovery shall be made a sum of Rs 200/- per shift per employee from the contractor's dues. \n(vi) The above work may be carried out at any installation under GE E/M Base Hospital as directed.\n(vii) Contractor shall deploy one supervisor daily to check the Shifts of operators and ensure smooth running of installations, any problem found shall be reported immediately to JE E/M. \n(viii) Supervisor shall insure daily updating of log sheet, attendance register and shall produce it to Engr-in-charge on weekly basis (Contractor shall provide all necessary stationary and printed log sheets as per format for each plant, rate quoted to be included on above schedule). (ix) Supervisor shall insure general cleanness of plant and outer premises on daily basis also weekly routine cleaning of AHU filters and cooling tower (Contractor shall provide necessary cleaning tools/items, rate quoted by the Contractor are deemed to be included on above schedule). 11 Per month
7 5 Supply, installation, testing and commissioning in repair Centrifugal back pull out, vertically split casing pumping set for condenser water circulation system. The pump shall be suitable for the given duty points. Each of 100 % Capacity. Make : Kirloskar/CG/Oswal\n(i) Water Quantity - 6 LPS \n(ii) Static Head - 11 to 23 M\n(iii) Speed - 3000 RPM\n(iv) Impeller - Bronze\n(v) Shaft - High Tensile steel \n(vi) Pump/motor body - CI\n(vii) Seal - Mechanical\n(viii) Motor - 3 HP, Squirrel Cage TEFC, Class 'B' Insulation\n(ix) Starter - Star-Delta\n(x) Base frame - Fabricated MS \n(xi) Foundation - RCC/PCC Foundation as per OEM Recommendations\n\n
8 6 Supply, installation, testing and commissioning in repair of Centrifugal back pull out, vertically split casing pumping set for chillier water circulation system. The pump shall be suitable for the given duty points. Each of 100 % Capacity. Make : Kirloskar/CG/Oswal\n(i) Water Quantity - 7.4 LPS \n(ii) Static Head - 17 to 26 M\n(iii) Speed - 3000 RPM\n(iv) Impeller - Bronze\n(v) Shaft - High Tensile steel \n(vi) Pump/motor body- CI\n(vii) Seal - Mechanical\n(viii) Motor - 5 HP, Squirrel Cage TEFC, Class 'B' Insulation\n(ix) Starter - Star-Delta\n(x) Base frame - Fabricated MS \n(xi) Foundation - RCC/PCC Foundation as per OEM Recommendations.\n\n 2 Each Job
9 7 Supply, installation, testing and commissioning in repair of Centrifugal back pull out, vertically split casing pumping set for condenser water circulation system. The pump shall be suitable for the given duty points. Each of 100 % Capacity. Make : Kirloskar/CG/Oswal\n(i) Water Quantity - 28 LPS \n(ii) Static Head - 25 to 35 M\n(iii) Speed - 3000 RPM\n(iv) Impeller - Bronze\n(v) Shaft - High Tensile steel \n(vi) Pump/motor body- CI\n(vii) Seal - Mechanical\n(viii) Motor - 10 HP, Squirrel Cage TEFC, Class 'B' Insulation\n(ix) Starter - Star-Delta\n(x) Base frame - Fabricated MS \n(xi) Foundation - RCC/PCC Foundation as per OEM Recommendations\n\n 3 Each Job
10 7.01 Note: for Item No 5, 6 & 7 :- \n(i) The pumps shall be provided with Anti Vibration Pads and RCC/Cement concrete Foundation. Rubber bellows shall be provided on suction and discharge sides for vibration isolation. 2 Nos 150 mm dia dial type pressure gauges for inlet/outlet shall also be provided. The quoted rates for the item shall deemed to be included this aspect. \n(ii) Old unserviceable monoblock pumps shall be deposited in MES store yard.
11 8 Supply & charging Refrigerant Gas R-22 complete all as specified and as directed. Make :- Mafron / Freon. 1400 Kg
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail