}

Revetment Of Tower Foundation At Location No-52 (H-Pole) Of 132 Kv S/C Rewa Road Meja Line Under Electy. Trans. Division-Iii, Prayagraj., Rewa-Road Meja Line-Uttar Pradesh

Uttar Pradesh Power Transmission Corporation Limited-UPPTCL has published Revetment Of Tower Foundation At Location No-52 (H-Pole) Of 132 Kv S/C Rewa Road Meja Line Under Electy. Trans. Division-Iii, Prayagraj.. Submission Date for this Tender is 03-02-2020. Pile Foundation Tenders in Rewa-Road Meja Line Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

23383033
Revetment Of Tower Foundation At Location No-52 (H-Pole) Of 132 Kv S/C Rewa Road Meja Line Under Electy. Trans. Division-Iii, Prayagraj.
Open Tender
Indian
Uttar Pradesh
Rewa-Road Meja Line
03-02-2020

Tender Details

Revetment of tower foundation at location No-52 (H-pole) of 132 KV S/C Rewa Road Meja line under Electy. Trans. Division-III, Prayagraj.

Key Value

Document Fees
INR 543 /-
EMD
INR 4600.0 /-
Tender Value
INR 4.60 Lakhs /-

BOQ Items

Name of Work:- Revetment of tower foundation at location No-52 (H-pole) of 132 KV S/C Rewa Road Meja line under Electy. Trans. Division-III, Prayagraj.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Revetment of tower foundation at location No-52 (H-pole) of 132 KV S/C Rewa Road Meja line under Electy. Trans. Division-III, Prayagraj as per drawing and specification. The job includes the following works:- BI01010001010000000000000515BI0100001111
2 1.01 Excavation of earth with the help of suitable T&P and labour, watering and ramming of excavated earth. BI01010001010000000000000515BI0100001112 46.592 M3
3 1.02 Concrete with 40 mm stone ballast, coarse sand and cement mortar in ratio 8:4:1 ratio in foundation and under floor including the cost of all material/Labour and T&P etc. required for proper completion of work satisfactorily. BI01010001010000000000000515BI0100001113 7.168 M3
4 1.03 Ist class brick work for the construction of retaining wall in 1:4 ratio cement, and sand including the cost of all material, labour & T&P etc. required for proper completion of job satisfactorily. BI01010001010000000000000515BI0100001114 68.884 M3
5 1.04 Concrete in plinth with 20mm stone ballast coarse sand and cement mortar in ratio 4:2:1 including the cost of all material. Labour and T&P etc. required for proper completion of work satisfactorily. BI01010001010000000000000515BI0100001115 1.12 M3
6 1.05 Earth filling under floor and in area between tower foundation and retaining wall including the cost of soil to be obtained by the contractor from outside including watering, ramming and dressing of earth etc. complete including the cost of earth royalty, taxes, freight etc and cost of material labour and T&P required for proper completion of work satisfactorily. BI01010001010000000000000515BI0100001116 42.6 M3
7 1.06 12 mm plaster work on wall with cement and sand in ratio 1:4 including cost of all material, labour and T&P required for proper completion of work satisfactorily. BI01010001010000000000000515BI0100001117 87.1 M2
8 1.07 Ist class brick on edge floor laid including preparation of base to proper slope including supply of all material, labour & T&P etc. required for proper completion of job satisfactorily. BI01010001010000000000000515BI0100001118 26.04 M2
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail