Uttar Pradesh Power Transmission Corporation Limited-UPPTCL has published Revetment Of Tower Foundation At Location No-52 (H-Pole) Of 132 Kv S/C Rewa Road Meja Line Under Electy. Trans. Division-Iii, Prayagraj.. Submission Date for this Tender is 03-02-2020. Pile Foundation Tenders in Rewa-Road Meja Line Uttar Pradesh. Bidders can get complete Tender details and download the document.
Name of Work:- Revetment of tower foundation at location No-52 (H-pole) of 132 KV S/C Rewa Road Meja line under Electy. Trans. Division-III, Prayagraj. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Revetment of tower foundation at location No-52 (H-pole) of 132 KV S/C Rewa Road Meja line under Electy. Trans. Division-III, Prayagraj as per drawing and specification. The job includes the following works:- | BI01010001010000000000000515BI0100001111 | ||
2 | 1.01 | Excavation of earth with the help of suitable T&P and labour, watering and ramming of excavated earth. | BI01010001010000000000000515BI0100001112 | 46.592 | M3 |
3 | 1.02 | Concrete with 40 mm stone ballast, coarse sand and cement mortar in ratio 8:4:1 ratio in foundation and under floor including the cost of all material/Labour and T&P etc. required for proper completion of work satisfactorily. | BI01010001010000000000000515BI0100001113 | 7.168 | M3 |
4 | 1.03 | Ist class brick work for the construction of retaining wall in 1:4 ratio cement, and sand including the cost of all material, labour & T&P etc. required for proper completion of job satisfactorily. | BI01010001010000000000000515BI0100001114 | 68.884 | M3 |
5 | 1.04 | Concrete in plinth with 20mm stone ballast coarse sand and cement mortar in ratio 4:2:1 including the cost of all material. Labour and T&P etc. required for proper completion of work satisfactorily. | BI01010001010000000000000515BI0100001115 | 1.12 | M3 |
6 | 1.05 | Earth filling under floor and in area between tower foundation and retaining wall including the cost of soil to be obtained by the contractor from outside including watering, ramming and dressing of earth etc. complete including the cost of earth royalty, taxes, freight etc and cost of material labour and T&P required for proper completion of work satisfactorily. | BI01010001010000000000000515BI0100001116 | 42.6 | M3 |
7 | 1.06 | 12 mm plaster work on wall with cement and sand in ratio 1:4 including cost of all material, labour and T&P required for proper completion of work satisfactorily. | BI01010001010000000000000515BI0100001117 | 87.1 | M2 |
8 | 1.07 | Ist class brick on edge floor laid including preparation of base to proper slope including supply of all material, labour & T&P etc. required for proper completion of job satisfactorily. | BI01010001010000000000000515BI0100001118 | 26.04 | M2 |