| 1 | 1 | Civil Work | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | Cost for earth work in excavation | BI01010001010000000000000515BI0100001113 | 17.94 | m3 |
|---|
| 3 | 1.02 | Earth work in foundation trench or plinth with good earth | BI01010001010000000000000515BI0100001114 | 3.62 | m3 |
|---|
| 4 | 1.03 | Labour for laying 150mm to 200 mm boulder soling including rough joints over | BI01010001010000000000000515BI0100001115 | 10.88 | m2 |
|---|
| 5 | 1.04 | Cost of Boulder over | BI01010001010000000000000515BI0100001116 | 1.43 | m3 |
|---|
| 6 | 1.05 | Ordinary Cement concrete work (1:2:4) with 20 mm downgraded stone chips and clean coarse sand excluding shuttering and reinforcement if any | BI01010001010000000000000515BI0100001117 | 4.33 | m3 |
|---|
| 7 | 1.06 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars,stirrups, binders etc initial straightening and removal of loose rust | BI01010001010000000000000515BI0100001118 | 0.27 | mt |
|---|
| 8 | 1.07 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approval stunt props and thick hard wood planks of approved thickness Total Cast | BI01010001010000000000000515BI0100001119 | 42 | m2 |
|---|
| 9 | 1.08 | Brick work with 1st class brick in cement mortar (1:4) | BI01010001010000000000000515BI0100001120 | 1.54 | m3 |
|---|
| 10 | 1.09 | Plaster (to wall, floor,celling etc.) with sand and cement mortar | BI01010001010000000000000515BI0100001121 | 13.2 | m2 |
|---|
| 11 | 1.1 | Net Cement puning about 1.5 mm thick in wall , floor | BI01010001010000000000000515BI0100001122 | 1.2 | m2 |
|---|
| 12 | 1.11 | M.S Structural works in roof trusses with tubular section | BI01010001010000000000000515BI0100001123 | 0.975 | mt |
|---|
| 13 | 1.12 | Galvanised corrugated iron sheet work (excluding the supporting frame work) | BI01010001010000000000000515BI0100001124 | 20.46 | m2 |
|---|
| 14 | 1.13 | Galvanised iron sheet ridging fitted with necessary bolts, screws, washers etc. complete (225 mm end lapping) | BI01010001010000000000000515BI0100001125 | 11.5 | Mtr. |
|---|
| 15 | 1.14 | Slabs for iron stir (C.C works) | BI01010001010000000000000515BI0100001126 | 0.125 | m3 |
|---|
| 16 | 1.15 | Ladder with iron bar including supply, fitting & fixing all complete | BI01010001010000000000000515BI0100001127 | 1 | LS |
|---|
| 17 | 1.16 | B GST 12% | BI01010001010000000000000515BI0100001128 | 1 | No |
|---|
| 18 | 1.17 | Labour cess 1% | BI01010001010000000000000515BI0100001129 | 1 | No |
|---|