| 1 | Raising of cable duct, cleaning switch yard, providing shabad stone at 220KV SS Shapurnagar | ew-13/2019-20 | 1.00 | LS | 1774.44 | 1774.44 |
| Corpus fund towards NAC @0.1% on total without taxes on Civil portion |
| 2 | Raising of cable duct, cleaning switch yard, providing shabad stone at 220KV SS Shapurnagar | ew-13/2019-20 | 1.00 | LS | 13010.60 | 13010.60 |
| Seignorage charges incl. 2% SMET |
| 3 | Raising of cable duct, cleaning switch yard, providing shabad stone at 220KV SS Shapurnagar | ew-13/2019-20 | 1.00 | LS | 321740.34 | 321740.34 |
| GST @ 18% |
| 4 | Raising of cable duct, cleaning switch yard, providing shabad stone at 220KV SS Shapurnagar | ew-13/2019-20 | 90.00 | sqm | 1182.58 | 106432.20 |
| Providing and fixing of False ceiling in true horizontal level 600mmx600mm,14mm thick Mineral fibre sheet 600x600 of fissured-ANF(board/Tegular)edge tiles with a humidity resistance of 90% RH,average NRC 0.50,light Reflectance>80% thermal conductivity /\\=0.052 to .057w/mk,fire performance class0/class1 using hot dipped galvanised steel section exposed surface with pre-coated capping,main Tee of size24x32mm at every 1200c/c maximum and rotary stiched cross tee of size 24x27mm at every 600mm c/c and sub-cross tee of size 24mmx25mm at 1200mm c/c and wall angle of size 19x19 mm fixed to periphery of the wall and the above grid is suspended at every 1200c/c in both directions using 2.0mmthick pre-straightened GI wire laying fine fissured butt edge ceiling tiles of 15mm thick mineral fibre board including cost and conveyance of all materials and labour charges such as cutting,fixing of standing of framework exposing roof making complete as per the directions of the engineer in charge for the finished item of work(Recommended brands:Armstrong,Insula etc.,) |
| 5 | Raising of cable duct, cleaning switch yard, providing shabad stone at 220KV SS Shapurnagar | ew-13/2019-20 | 650.00 | sqm | 171.37 | 111390.50 |
| Painting to External old walls with 2 coats of acrylic emulsion exterior grade having VOC(Volatile Organic Compound) content less than 50 gms/Ltr of approved brand ( Asian, Berger, Nippon), making 2 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc.complete for finished item of work as per SS 912 for External walls |
| 6 | Raising of cable duct, cleaning switch yard, providing shabad stone at 220KV SS Shapurnagar | ew-13/2019-20 | 800.00 | sqm | 107.73 | 86184.00 |
| Painting to inner old walls with 2 coats of acrylic emulsion interior grade having VOC(Volatile Organic Compound) content less than 50 gms/Ltr of approved brand ( Asian, Berger, Nippon), making 2 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc.complete for finished item of work as per SS 911 for internal walls |
| 7 | Raising of cable duct, cleaning switch yard, providing shabad stone at 220KV SS Shapurnagar | ew-13/2019-20 | 1000.00 | sqm | 629.57 | 629570.00 |
| Flooring and skirting with polished Tandur stone slab 15 to 18 mm thick of any size as specified (Tandur blue, cetre cut) set over base coat of Cement mortor (1:8) over already laid CC bed or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3kgs per sqm & jointed neatly with cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand, water and flooring stones etc., complete, including seigniorage charges, labour charges etc., complete for finished item of work. |
| 8 | Raising of cable duct, cleaning switch yard, providing shabad stone at 220KV SS Shapurnagar | ew-13/2019-20 | 480.00 | sqm | 252.90 | 121392.00 |
| Plastering to Uneven surfaces of RR /CR, PCC with CM(1:5) 20mm. thick including cost & conveyance of all materials, labour charges, leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work. |
| 9 | Raising of cable duct, cleaning switch yard, providing shabad stone at 220KV SS Shapurnagar | ew-13/2019-20 | 42.00 | cum | 7496.61 | 314857.62 |
| Masonry work in CM (1:6) prop with fly ash cement solid blocks of size 23x11x7 cm for manufaturing of fly ash solid blocks using flyash of 80 kgs cement of 15 kgs gypsum of 5 kgs and stone dust incl. cost and conveyance of all materials, labour charges, seignorage charges and curing etc complete with a compressive strength not lessthan 75 kg/ sqm |
| 10 | Raising of cable duct, cleaning switch yard, providing shabad stone at 220KV SS Shapurnagar | ew-13/2019-20 | 14.00 | cum | 8523.40 | 119327.60 |
| RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (screened sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work. a) For RCC Cover Slabs with 50% 20mm & 50% 12mm HBG metal. |
| 11 | Raising of cable duct, cleaning switch yard, providing shabad stone at 220KV SS Shapurnagar | ew-13/2019-20 | 2.20 | MT | 48701.62 | 107143.56 |
| Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 500/ 500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.(SWITCHYARD WORK) |
| 12 | Raising of cable duct, cleaning switch yard, providing shabad stone at 220KV SS Shapurnagar | ew-13/2019-20 | 17.00 | cum | 5654.22 | 96121.74 |
| Plain Cement concrete - Nominal Mix (1:3:6) with 12 to 20mm HBG metal for encasing/embedding the structural steel supportng \Y\ angles with necessary form work including cost and conveyance of all materials, labour charges, water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456) |
| 13 | Raising of cable duct, cleaning switch yard, providing shabad stone at 220KV SS Shapurnagar | ew-13/2019-20 | 0.50 | cum | 4388.05 | 2194.03 |
| Laying of Cement Concrete (1:4:8) mix using 40mm size HBG Machine crushed metal for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge. |
| 14 | Raising of cable duct, cleaning switch yard, providing shabad stone at 220KV SS Shapurnagar | ew-13/2019-20 | 100.00 | cum | 752.37 | 75237.00 |
| Providing stone crusher dust for foundations and basement in layers, including cost & conveyance of all materials, labour charges, leads, lifts , watering and consolidating to required density complete as per the directions of the Engineer in charge for the finished item of work( APSS No. 309&310) |
| 15 | Raising of cable duct, cleaning switch yard, providing shabad stone at 220KV SS Shapurnagar | ew-13/2019-20 | 1.50 | cum | 242.06 | 363.09 |
| Earthwork excavation in all types of soils (up to stone matrix)which can be excavated with pick axe and crow bars and do not require blasting in all conditions such as dry, wet and slushy etc. covering initial lead and lift etc and backfilling the foundations (after laying foundations) with excavated earth complete as per the the directions of the Engineer in charge for the finished item of work. . |
| 16 | Raising of cable duct, cleaning switch yard, providing shabad stone at 220KV SS Shapurnagar | ew-13/2019-20 | 1120.00 | sqm | 3.77 | 4222.40 |
| Clearing thick jungle growth (less than 50 percent open space) including bushes up to 30 cm /parthenium and other weeds including burning or disposing off the same as directed by Engineer in charge for the finished item of work. |